ML16342C732

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-275/94-25 & 50-323/94-25 on 940926-1028 & Notice of Violation
ML16342C732
Person / Time
Site: Diablo Canyon  
Issue date: 11/16/1994
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Rueger G
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16342C733 List:
References
NUDOCS 9411220007
Download: ML16342C732 (12)


See also: IR 05000275/1994025

Text

PRlORIT'Y Z

REGULATORY~M%kNNKWE&kiTBQTIONSYSTEM

( RIDS )

ACCESSION NBR:9411220007

DOC.DATE: 94/11/16

NOTARIZED:

NO

DOCKET

CIL:50-275 Diablo Canyon Nuclear

Power Plant, Unit 1, Pacific

Ga

05000275

50-323 Diablo Canyon Nuclear

Power Plant, Unit 2, Pacific

Ga

05000323

AUTH.NAME

AUTHOR AFFILIATION

GWYNN,T.P.

Region

4 (Post

820201)

RECIP.NAME

RECIPIENT AFFILIATION

RUEGER,G.M.

Pacific

Gas

& 'Electric Co.

SUBJECT:

Forwards

insp repts

50-275/94-25

& 50-323/94-25

"on

940926-1028

6 notice of violation.

DISTRIBUTION CODE:

IEOID

COPIES

RECEIVED:LTR g ENCL J

SIZE: 5 + /

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

NOTES:

RECIPIENT

ID CODE/NAME

PD4-2

PD

INTERNAL: ACRS

AEOD/SPD/RAB

AEOD~//

FILE CENTE

02

NRR/DRCH/HHPB

NUDOCS-ABSTRACT

OGC/HDS3

RNAL: LITCO BRYCE,J

H

NRC

PDR

COPIES

LTTR ENCL

1

1

2

2

1

1

1

1

1

1

1

'

1

1

1

1

1

'

1

1

RECIPIENT

ID CODE/NAME

PETERSONIS

AEOD/DEIB

AEOD/SPD/RRAB

DEDRO

NRR/DORS/OEAB

NRR/PMAS/IRCB-E

OE DIR

RGN4

FILE

01

NOAC

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

VOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE 'O'ASTE! COiTACTTIHEDOCL'NIEi1 CONTROL

DESK, ROOXI P!.37 (EXT. 504.2033

) TO ELIXIIKATEYOL'R KAMEFROif

DIS'I'RIIIl"I'IOiI.IS1'S FOR DOCl'MERITS YOL'Oi "I'

LIED!

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

20

ENCL

20

I

1 PP

R E C(((

4

C

e:j~gjIIIJg~

<<+*<<>>

UNITED STATES

NUCLEAR REGULATORY COMMISSION

R EG ION IV

611 RYAN PLAZA DRIVE, SUITE 400

ARLINGTON,TEXAS 76011.8064

Dockets:

50-275

50-323

Licenses:

DPR-80

DPR-82

Pacific

Gas

and Electric Company

Nuclear

Power Generation,

B14A

ATTN:

Gregory

M. Rueger,

Senior Vice

President

and General

Hanager

Nuclear

Power Generation

Bus. Unit

77 Beale Street,

Room

1451

P.O.

Box 770000

San Francisco,

California

94177

SUBJECT:

NRC

INSPECTION

REPORT 50-275/94-25;

50-323/94-25

(NOTICE OF

VIOLATION)

This refers to the inspection

conducted

by Hr. L.

E. Ellershaw of this office,

on September

26 through October 7, with in-office inspection

through

Octobe'r

28,

1994.

The inspection

included

a review of activities authorized

for your Diablo Canyon Nuclear

Power Plant,

Units

1

and 2, facility.

At the

conclusion of the inspection,

the findings were discussed

with those

members

of your staff identified in the enclosed

report.

Areas

examined during the inspection

are identified in the report

and included

your inservice inspection

program.

Within these

areas,

the inspection

consisted of selective

examinations

of procedures

and representative

records,

interviews with personnel,

and observation of activities in progress.

Based

on the results of this inspection,

certain licensed activities appeared

to be in violation of NRC requirements,

as specified in the enclosed

Notice of

Violation (Notice).

The first exampl'e of the violation is of concern

because

it indicated

poor maintenance

planning that resulted

in general

area

and

personnel

radiological contamination.

The second

example of the violation is

of concern

because it indicated that plant workers did not inform management

of an internally reportable

problem.

Although your staff has

presented

certain

hardware corrective actions for this issue,

we are not aware of any

corrective actions affecting maintenance

planning

and the failure to write an

action request.

We request that you specifically address

these

concerns

in

your letter of response

to the Notice.

You are required to respond to this letter

and should follow the instructions

specified in the enclosed

Notice when preparing your response.

In your

response,

you should

document

the specific actions

taken

and

any additional

9411220007

941116

PDR

ADOCK 05000275

PDR

//l

'

1

0

Pacific

Gas

and Electric Company

-2-

actions

you plan to prevent recurrence.

After reviewing your response

to this

Notice, including your proposed corrective actions

and the results of future

inspections,

the

NRC will determine

whether further

NRC enforcement

action is

necessary

to ensure

compliance with NRC regulatory requirements.

In accordance

with 10 CFR 2.790 of the NRC's "Rules -of Practice,"

a copy of

this letter

and its enclosures will be placed in the

NRC Public Document

Room.

The responses

directed

by this letter and the enclosed

Notice are not subject

to the clearance

procedures

of the Office of Hanagement

and Budget,

as

required

by the Paperwork

Reduction Act of 1980,

Pub.

L. No. 96.511.

Should you have

any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

Sincerely,

Enclosures:

omas

P:

Gwynn, Dir cto

Division of Reac

Safe y

1.

Appendix

A Notice of Violation

2.

Appendix

B

NRC Inspection

Report

50-275/94-25;

50-323/94-25

w/Attachment

cc w/enclosures:

Sierra Club California

ATTN:

Dr. Richard

Ferguson

Energy Chair

6715

Rocky Canyon

Creston, California

93432

San Luis Obispo

Hothers for Peace

ATTN:

Hs.

Nancy Culver

P.O.

Box 164

Pismo

Beach, California

93448

Hs. Jacquelyn

C. Wheeler

P.O.

Box 164

Pismo

Beach, California

93448

Pacific

Gas

and Electric Company

The County Telegram Tribune

ATTN:

Managing Editor

1321 Johnson

Avenue

P.O.

Box 112

San Luis Obispo, California

93406

San Luis Obispo County Board of

Supervisors

ATTN:

Chairman

Room 370

County Government

Center

San Luis Obispo, California

93408

California Public Utilities Commission

ATTN:

Mr. Truman Burns)Mr. Robert Kinosian

505

Van Ness,

Rm.

4102

San Francisco,

California

94102

Diablo Canyon

Independent

Safety Committee

Attn:

Robert

R. Wellington,

Esq.

Legal

Counsel

857

Cass Street,

Suite

D

Monterey, California

93940

Radiologic Health Branch

State

Department of Health Services

ATTN:

Mr. Steve

Hsu

P.O.

Box 942732

Sacramento,

California

94234

State of California

ATTN:

Mr. Peter

H. Kaufman

Deputy Attorney General

110 West

A Street,

Suite

700

San Diego, California

92101

Pacific

Gas

and Electric Company

ATTN:

Christopher J.

Warner,

Esq.

P.O.

Box 7442

San Francisco,

California

94120

Diablo Canyon Nuclear

Power Plant

ATTN:

John

Townsend,

Vice President

and Plant Manager

P.O.

Box 56

Avila Beach, California

93424

Pacific

Gas

and Electric Company

E-Mail repoi t to D. Sullivan

(DJS)

bcc to

DMB ( IE01)

bcc distrib.

by RIV:

L. J. Callan

DRSS-FIPB

Branch Chic'f (DRP/E,

WCFO)

RIV File

L. Ellershaw

B. Henderson

(PAO,

WCFO)

Leah Tremper

(OC/LFDCB,

MS:

AI 94-116 File

Resident

Inspector

MIS System

Senior Project Inspector

(DRP/E,

WCFO)

Branch Chief (DRP/TSS)

Branch Chief (DRS/MB)

TWFN 9E10)

RIV:RI 'M

LEEllershaw

ll/IF'/94

C:MB

DAPowers

11/IV/94

D:DRS

TPGwynn

11/I'/94

RP

ll/l5 /94

D:DRS

TPGwynn

11/>4 /94

Pacific

Gas

and Electric Company

E-Hail report to D. Sullivan

(DJS)

bcc to

DHB (IE01)

bcc distrib.

by RIV:

L. J. Callan

DRSS-FIPB

Branch Chief (DRP/E,

WCFO)

RIV File

L. Ellershaw

B. Henderson

(PAO,

WCFO)

Leah Tremper

(OC/LFDCB,

MS:

AI 94-116 File

Resident

Inspector

HIS System

Senior Project Inspector

(DRP/E,

WCFO)

Branch Chief (DRP/TSS)

Branch Chief (DRS/HB)

TWFN 9E10)

RIV:RI:H

LEEllershaw

II/>+94

C:HB

DAPowers

11/i4/94

D:DRS

TPGwynn

iill9(ee

RP

II/I5 /94

D: DRS

TPGwynn

II/~4,/94