Forwards Insp Repts 50-275/94-15 & 50-323/94-15 on 940424 & 0604 & Notice of Violation
ML16342C598
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 06/24/1994
From: Beach A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Rueger G
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16342C599 List:
References
NUDOCS 9406300003
Download: ML16342C598 (14)


See also: IR 05000275/1994015

Text

FORD 1

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

CCESSION NBR:9406300003

DOC.DATE: 94/06/24

NOTARIZED:

NO

ACIL:50-275 Diablo Canyon Nuclear

Power Plant, Unit 1, Pacific

Ga

50-323 Diablo Canyon Nuclear

Power Plant, Unit 2, Pacific

Ga

AUTH.NAME

AUTHOR AFFILIATION

BEACH,A.B.

Region

4 (Post

820201)

RECIP.NAME

RECIPIENT AFFILIATION

RUEGERiG.M.

Pacific Gas

& Electric Co.

SUBJECT:

Forwards

insp repts

50-275/94-15

& 50-323/94-15

on 940424

0604

& notice of violation.

DISTRIBUTION CODE:

IE01D

COPIES

RECEIVED:LTR

ENCL

SIZE:

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

NOTES:

DOCKET ¹

05000275

05000323

INTERNAL:

RECIPIENT

ID CODE/NAME

PDIV-3 PD

ACRS

AEOD/DSP/ROAB

AEOD/TTC

NRR/DORS/OEAB

NRR/PMAS/ILPBl

NUDOCS-ABSTRACT

OGC/HDS3

RES/HFB

COPIES

LTTR ENCL

1

1

2

2

1

1

1

1

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

MILLER,M

AEOD/DEIB

AEOD/DSP/TPAB

DEDRO

NRR/DRCH/HHFB

NRR/PMAS/IRCB-E

EG FILE

02

RGN4

FILE

01

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

EXTERNAL

EG&G/BRYCEIJ

~ H ~

NSIC

1

1

1

1

NRC

PDR

1

1

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.

ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION

LISTS I'OR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

22

ENCL

22

~

'

1PS RE@0

Wp

,'--.,'.:=

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

611 RYAN PLAZA DRIVE, SUITE 400

ARLINGTON,TEXAS 76011.8064

Dockets:

50-275

50-323

Licenses:

DPR-80

DPR-82

Pacific

Gas

and Electric Company

Nuclear

Power Generation,

B14A

ATTN:

Gregory

H. Rueger,

Senior Vice

President

and General

Hanager

Nuclear

Power Generation

Bus. Unit

77 Beale Street,

Room

1451

P.O.

Box 770000

San Francisco,

California

94177

SUBJECT:

NRC

INSPECTION

REPORT 50-275/94-15;

50-323/94-15

(NOTICE OF

VIOLATION)

This refers to the routine inspection

conducted

by H. Hiller, and the

'inspectors

identified in the enclosed

report, of this office on April 24

through June

4,

1994.

The inspection

included

a review of activities

authorized for your Diablo Canyon Nuclear Generating Station,

Units

1

and

2,

facility.

At the conclusion of the inspection,

the findings were discussed

with those

members of your staff identified in the enclosed report,

Areas

examined during this inspection

are identified in the report.

Within

these

areas,

the inspection consisted

of selective

examinations of procedures

and representative

records,

interviews with personnel,

and observation of

activities in progress.

Based

on the results of this inspection,

certain licensed activities appeared

to be in violation of NRC requirements,

as specified in the enclosed

Notice of

Violation (Notice).

After entry into Node

3 at the end of the Unit

1 outage,

an

NRC inspector identified your use of aluminum tape

on several

locations of

piping insulation in containment.

The aluminum tape

had

been installed

without appropriate

technical

review.

The design of containment

requires that

aluminum

be controlled to reduce

the generation

of hydrogen during

a design

basis

event

and that items like tape

be controlled to ensure operability of

the recirculation

sump.

The tape

was promptly removed.

Later analysis

determined that sufficient margin

was available for both concerns

with the

tape installed.

We are concerned

that, despite

several

opportunities to identify and correct

this deficiency,

no one questioned this installation.

Thjs and other issues

~

~

discussed

in this report indicate

a less

than

adequate

questioning attitude.

Although other corrective actions

you took in response

to this finding were

PDR ~000> 9<0sao

9O06

ADOCK 05000275

PDR

~

'

Pacific

Gas

and Electric Company

prompt

and appropriate,

the loss of control leading to the use of aluminum

tape in containment

is significant.

The concerns

identified during this inspection period (the use of uncontrolled

aluminum tape in containment,

the isolation of the low temperature

overpressure

protection

system for 25 minutes,

and the inadvertent

pressurization

of the

RHR system)

indicate

a less

than

adequate

questioning

attitude

by your staff.

As we stated

in the forwarding letter of NRC

Inspection

Report 50-275/94-11;

50-323/94-11,

we remain concerned

about the

implementation of management

expectations:

the lack of sensitivity to the

need to pay close attention to detail, to fo11ow procedures,

and to not

proceed

in the face of uncertainty.

Because

we have already reviewed your corrective action~ for the enclosed

violation,

no further response

is required.

In accordance

with 10 CFR 2.790(a) of the NRC's "Rules of Practice,"

a copy of

t".is letter

and its enclosure(s) will be placed

in the

NRC Public Document

I Uom.

Should you have

any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

Sincerely,

~R

+ A. Bill Beach, Director

Division of Reactor Projects

Enclosures:

1.

Appendix A Notice of Violation

2.

Appendix

B -

NRC Inspection

Report

50-275/94-15;

50-323/94-15

cc w/enclosures:

Sierra

Club California

ATTN:

Dr. Richard

Ferguson

Energy Chair

6715

Rocky Canyon

Creston,

California

93432

San Luis Obispo

Hothers for Peace

ATTN:

Hs.

Nancy Culver

P.O.

Box 164

Pismo

Beach, California

93448

0'

Pacific

Gas

and Electric Company

-3-

Ms. Jacquelyn

C. Wheeler

P.O.

Box 164

Pismo

Beach, California

93448

The County Telegram Tribune

ATTN:

Managing Editor

1321

Johnson

Avenue

P.O.

Box 112

San Luis Obispo, California

93406

San Luis Obispo County Board of

Supervisors

ATTN:

Chairman

Room 370

County Government

Center

San Luis Obispo, California

93408

California Public Utilities Commission

ATTN:

Mr. Truman Burns)Mr. Robert Kinosian

505

Van Ness,

Rm.

4102

San Francisco,

California

94102

Diablo Canyon

Independent

Safety Committee

Attn:

Robert

R. Wellington,

Esq.

Legal

Counsel

857 Cass Street,

Suite

D

Monterey, California

93940

Radiologic Health Branch

State

Department of Health Services

ATTN:

Mr. Steve

Hsu

P.O.

Box 942732

Sacramento,

California

94234

State of California

ATTN:

Mr. Peter

H. Kaufman

Deputy Attorney General

110 West

A Street,

Suite

700

San Diego, California

92101

Pacific Gas

and Electric Company

ATTN:

Christopher J.

Warner,

Esq.

P.O.

Box 7442

San Francisco,

California

94120

0

Pacific

Gas

and Electric Company

Diablo Canyon Nuclear

Power Plant

ATTN:

John

Townsend,

Vice President

and Plant Nanager

P.O.

Box 56

Avila Beach, California

93424

0

Pacific Gas

and Electric Company

E-Hail report to D. Sullivan

(DJS)

bcc to

DMB (IE01)

bcc distrib.

by RIV:

L. J. Callan

DRSS-FIPB

Branch Chief (DRP/E,

WCFO)

RIV File

Leah Tremper,

OC/LFDCB,

HS:

Resident

Inspector

HIS System

Senior Project Inspector

(DRP/E,

WCFO)

Branch Chief (DRP/TSS)

HNBB 4503

RIV:SRI: DRP/E*

C: DRP/E~

HHHiller

DFKirsch

6/15/94

6/15/94

  • previously concurred

D:WCFO*

KEPerkins

6/

/94

D:DRP

BBeach~

6/Sf/94

Pacific

Gas

and Electric Company

E-Hail report to D. Sullivan

(DJS)

bcc to

DHB (IE01) i

bcc distrib.

by RIV:

L. J. Callan

DRSS-FIPB

Branch Chief (DRP/E,

WCFO)

RIV File

Leah Tremper,

OC/LFDCB,

HS:

Resident

Inspector

HIS System

Senior Project Inspector

(DRP/E,

WCFO)

Branch Chief (DRP/TSS)

HNBB 4503

RIV: SR I:DRP/E*

HHHiller

C:DRP/E+

DFKirsch

D:WCFO*

KEPerkins

D:DRP

BBeach

6/15/94

6/15/94

  • previously concurred

6/

/94

6/bf/94