Forwards SER Re Proposed Method of Implementing Requirements of 10CFR50.62 (Atws).Requests That Util Continue W/Scheduled Installation & Implementation of Proposed ATWS Design Until NRC Review of Use of Tech Specs for ATWS Complete
ML16342C205
Person / Time
Site: Diablo Canyon  
Issue date: 08/15/1988
From: Rood H
Office of Nuclear Reactor Regulation
To: Shiffer J
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16341E763 List:
References
TAC-59088, TAC-59089, NUDOCS 8808240025
Download: ML16342C205 (12)


Text

August 15, 1988 Docket Nos.:

50-275 and 50-323 Mr. J.

D. Shiffer, Vice President Nuclear Power Generation c/o Nuclear Power Generation, Licensing Pacific Gas and Elect ic Company 77 Beale Street, Room 1451 San Francisco, California 94106

Dear Mr. Shiffer:

DISTRIBUTION NRC F LPORs~/

HRood GHolahan JLee OGC-Bethesda PDV Plant File EJordan BGrimes ACRS (10)

SUBJECT:

SAFETY EVALUATION OF THE AMSAC SYSTEM, PGSE'S PROPOSED METHOD OF IMPLEMENTING THE REQUIREMENTS OF 10 CFR 50.62 (ATWS)

FOR DIABLO CANYON (TAC NOS.

59088 AND 59089)

The purpose of this letter is to forward the NRC staff's safety evaluation report (Enclosure

1) addressing your proposed implementation of the require-ments of the ATWS Rule (10 CFR 50.62) for the Diablo Canyon Nuclear Power Plant.

The staff has concluded that the proposed design is in compliance with the requirements of 10 CFR 50.62, paragraph (c)(1).

This conclusion is condi-tional upon (1) your successful completion of certain human-factors engineer-ing reviews, (2) your satisfactory completion of testing of isolation devic-es, and (3) development of acceptable technical specifications for implement-ing the ATWS rule.

These issues are discussed in detail in the enclosed safety evaluation.

It is the staff's position that the AMSAC may not be declared operational prior to successful qualification of the electrical isolation devices in accordance with Appendix A of the staff's generic AMSAC safety evaluation report.

Until staff review of the use of technical specifications for ATWS requirements is complete, we request that you continue with the scheduled installation and implementation (planned operation) of the proposed ATWS design using procedures for administrative control.

pg()00275 5 gp()315 pgp PQOCK

@gal P

1 lg II Please contact us if you have any questions regarding this evaluation.

This completes our efforts on TAC NOS.

59088 and 59089.

Sincerely, origi nal signed by Harry Rood, Senior Project Manager Project Directorate V

Division of Reactor Projects - III, IV, V and Special Projects

Enclosure:

Safety Evaluation cc w/enclosure:

See next page DRSP/PD5

/D:PD5 HRood ni ton 08/lg/88 08/

/88 OFFICIAL RECORD COPY

1 t.

~ q 0

N

<p,s acMO c~

4+4 L

0 o

,p

+a*++

UNITEDSTATES NUCLEAR R EGULATORY COMMISSION WASHINGTON, D. C. 20555 August 15, 1988 Docket Nos.:

50-275 and 50-323 Mr. J.

D. Shiffer, Vice President Nuclear Power Generation c/o Nuclear Power Generation, Licensing Pacific Gas and Electric Company 77 Beale Street, Room 1451 San Francisco, California 94106

Dear Mr. Shiffer:

SUBJECT:

SAFETY EVALUATION OF THE AMISAC SYSTEM, PGSE'S PROPOSED METHOD OF IMPLEMENTING THE REQUIREMENTS OF 10 CFR 50.62 (ATWS)

FOR DIABLO CANYON (TAC NOS.

59088 AND 59089)

The purpose of this letter is to forward the NRC staff's safety evaluation report (Enclosure

1) addressing your proposed implementation of the require-ments of the ATWS Rule (10 CFR 50.62) for the Diablo Canyon Nuclear Power Plant.

The staff has concluded that the proposed design is in compliance with the requirements of 10 CFR 50.62, paragraph (c)(l).

This conclusion is condi-tional upon (1) your successful completion of certain human-factors engineer-ing reviews, (2) your satisfactory completion of testing of isolation devic-es, and (3) development of acceptable technical specifications for implement-ing the ATWS rule.

These issues are discussed in detail in the enclosed safety evaluation.

It is the staff's position that the AMSAC may not be declared operational prior to successful qualification of the electrical isolation devices in accordance with Appendix A of the staff's generic AMSAC safety evaluation report.

Until staff review of the use of technical specifications for ATWS requirements is complete, we request that you continue with the scheduled installation and implementation (planned operation) of the proposed ATWS design using procedures for administrative control.

f Please contact us if you have any questions regarding this evaluation.

This completes our efforts on TAG NOS.

59088 and 59089.

Sincerely, Harry Rood, Senior Project Manager Project Directorate V

Division of Reactor Projects - III, IV, V and Special Projects

Enclosure:

Safety Evaluation cc w/enclosure:

See next page

Mr. J.

D. Shiffer Pacific Gas and Electric Company Diablo Canyon CC:

Richard F. Locke, Esq.

Pacific Gas II Electric Company Post Office Box 7442 San Francisco, California 94120 Janice E. Kerr, Esq.

California Public Utilities Commission, 350 McAllister Street San Francisco,'alifornia 94102 Ms. Sandra A. Silver 660 Granite Creek Road Santa Cruz, California 95065 Mr.. W. C. Gangloff Westinghouse Electric Corporation P. 0.

Box 355 Pittsburgh, Pennsylvania 15230 Managing Editor San Luis Obispo County Telegram Tribune 1321 Johnson Avenue P. 0.

Box 112 San Luis Obispo, California 93406 Mr. Leland M. Gustafson, Manager Federal Relations Pacific Gas and Electric Company 1726 M Street, N.

W.

Washington, DC 20036-4502 Dian M.'rueneich Marcia Preston Law Office of Dian M. Grueneich 380 Hayes Street, Suite 4

San Francisco, California 94102 NRC Resident Inspector Diablo Canyon Nuclear Power Plant c/o U.S. Nuclear Regulatory Cormission P. 0.

Box 369 Avila Beach, California 93424 Mr. Dick Blakenburg Editor 5 Co-Publisher South County Publishing Company P. 0.

Box 460 Arroyo Grande, California 93420 Bruce Norton, Esq.

,c/o Richard F. Locke, Esq.

Pacific Gas and Electric Company Post Office Box 7442 San Francisco, California 94120 Dr. R. B. Ferguson Sierra Club - Santa Lucia Chapter Rocky Canyon Star Route Creston, California 93432 Chairman San Luis Obispo County Board of Supervisors Room 270 County Government Center San Luis Obispo, California 93408 Director Energy Facilities Siting Division Energy Resources Conservation and Development Commission 1516 9th Street Sacramento, California 95814 Ms. Jacquelyn Wheeler 3033 Barranca Court San Luis Obispo, California 93401

Pacific Gas E. Electric Company Diablo Canyon CC:

Ms. Laurie McDermott, Coordinator Consumers Organized for Defense of Environmental Safety 731 Pacific Street, Suite 42 San Luis Obispo, California 93401 Mr. Jack McGurk, Acting Chief Radiological Health Branch State Department of Health Services 714 P Street, Office Building 88 Sacramento, California 95814 Regional Administrator, Region V

U.S. Nuclear Regulatory Commission 1450 Maria Lane Suite 210 Walnut Creek, California 94596 Ms. Nancy Culver 192 Luneta Street San Luis Obispo, California 93401 President California Public Utilities Commission California State Building 350 McAllister.Street San Francisco, California 94102 Michael M. Strumwasser, Esq.

Special Assistant Attorney General State of California Department of Justice 3580 Wilshire Boulevard, Room 800 Los Angeles, California 90010