Forwards Exam Repts 50-275/OL-90-01 & 50-323/OL-90-01 Administered on 900205-09
ML16342B656
Person / Time
Site: Diablo Canyon  
Issue date: 03/09/1990
From: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Shiffer J
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16341F620 List:
References
NUDOCS 9003260322
Download: ML16342B656 (4)


Text

~pR AECgi

~

Cq cy Q c

I

)

pp p

+

0

+a*++

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION V 1450 MARIALANE,SUITE 210 WALNUTCREEK, CALIFORNIA94596 March 9, 1990 Pacific Gas and Electric Company 77 Beale Street, Room 1451 San Francisco, California 94106 Attention:

J.

D. Shiffer, Senior Vice President Nuclear Power Generation Business Unit

Dear Nr. Shiffer:

Subject:

NRC Examinations at Diablo Canyon Nuclear Power Plant On February 5 - 9, 1990, the NRC administered examinations to employees of your company who had applied for licenses to operate your Diablo Canyon Nuclear Power Plant.

As a result of these examinations, ten Senior Reactor Operator candidates were found to meet the minimum qualification requirements for licensing.

Two individual operators were administered retake requalification examinations for portions of those examinations that were not successfully completed during the May 1989 requalification examinations.

Both individuals passed those retake examinations.

At the conclusion of the examinations on February 9, 1990, the examination process and preliminary findings were discussed with members of your staff as detailed in the enclosed report.

In accordance with 10 CFR 2.790(a),

a copy of this letter and enclosure (1) and (2) will be placed in the NRC's Public Document Room.

Enclosure (3) is Personal Privacy Information and will be withheld from public disclosure in accordance with 10 CFR 9.5(a)(6).

Sincerely,

~P.

uennis F. Kirsch, Chief Reactor Safety Branch cc w/enclosures (1), (2), (3)i (4) and (5)

R. Cross, RV (2 copies),

J. Welsch, DCPP, Diablo Canyon 9pp326p~~~

p5ppvz75

-- 9pp392 pod ADOC<

PDC V

Encl osures:

1:

Examination Report No. 50-275/50-323/OL-90-01 2.

Facility Comments and Resolutions 3.

Written Examination and Answer Key (SRO) 4.

Grade Summary Sheet 5;

Simulator Fidelity Report

AA~

March 9, 1990 cc w/enclosure (1) only:

H. Rood, NRR/PD5 K. Perkins, NRR/LOLB P. Narbut, SRI M. Mendonca, RV Mr. J. Martin, RV R. Zimmerman, RV D. Kirsch, RV L. Miller, RV G. Johnston, RV A. Chaffee, RV B. Faulkenberry, RV cc w/enclosures (I) and (2):

~~'~RSB/Document" Control-Desk'(RIDS)

RV/jk VEST COPY R

VEST COPY YES NO ES NO EST COPY ES NO T

PDR ES NO JOHNSTON

~/90 LMILLER KIRSCH

~/90

$/

90