Forwards Safety Evaluation Accepting First 10-yr Interval Inservice Insp Program Plan for Plant.Technical Evaluation Repts Encl
ML16342B506
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 12/14/1988
From: Rood H
Office of Nuclear Reactor Regulation
To: Shiffer J
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16341E915 List:
References
TAC-60656, TAC-62155, NUDOCS 8812230121
Download: ML16342B506 (10)


Text

t i ~J December 14, 1988 Docket Nos.:

50-275 and 50-323 Mr. J.

D. Shiffer, Vice President Nuclear Power Generation c/o Nuclear Power Generation, Licensing Pacific Gas and Electric Company 77 Beale Street, Room 1451 San Francisco, California 94106

Dear Mr. Shiffer:

DISTRIBUTION 7

HRood MVirgi 1 io JLee OGC (for information only)

PDV Reading File EJordan BGr imes ACRS (10)

GJohnson

SUBJECT:

SAFETY EVALUATION OF THE DIABLO CANYON UNITS 1 AND 2 TEN-YEAR INSERVICE INSPECTION (ISI)

PROGRAM PLAN (TAC NOS.

62155 AND 60656)

The purpose of this letter is to forward the NRC staff's safety evaluation reports (SERs) addressing the First Ten-Year Interval ISI Program Plan for the Diablo Canyon Nuclear Power Plant, Units 1 and 2.

The SERs cover the ISI Program Plan through Revision 5 for Unit 1 and Revision 2 for Unit 2, which you submitted by letter dated January 26, 1987.

The NRC staff, with technical assistance from the Idaho National Engineering Laboratory (INEL),

has reviewed and evaluated the above plans and the additional related information that you have submitted.

The Technical Evaluation Reports (TERs) prepared by INEL are also attached.

Based on the information that you have provided, the NRC staff agrees with the conclusions and recommendations presented in the INEL TERs.

lie have determined that certain Section XI Code requirements are impractical to perform at Diablo Canyon.

Therefore, we are granting relief from these requirements.

However, we are not granting Relief Requests 2A, 2B, or 3 concerning hydrostatic tests of Class 2 and 3 cooling water
systems, because the supporting information provided was insufficient to support a finding that the Code requirements are impractical.

A summary of the bases for granting or denying each of your relief requests is included in the attached

,SERs and TERs.

In summary, the staff has concluded that the Diablo Canyon ISI programs, with the additional information provided and the reliefs granted, are in compliance with the requirements of (1) the 1977 Edition through Summer 1978 Addenda of Section XI of the ASME Boiler and Pressure Vessel

Code, (2) 10 CFR 50.55a, and (3) commitments made prior to issuance of the facility operating licenses.

Based on this, we find the ISI programs acceptable.

gF t

3312230121 SS1214 P

R ADOCK 05000XP+

PM

C

~

I R

I'l

'R

~ w

<<IMR ~

V 1

w nf I" 7R 1

~

n II P'

R}'f

'I I t 1

VII<<

)l?L'n nl MR<<}

h dnlw>>

tl R

td ni t

x.

W; 0

II

?I M

I n

~,t $ 1 I

M et<<<<)

"III lt

~ >>

w<<>>

lt jw

'r I

'"'ln w

b lt

~

R>>

<<, f <<)

~

I I IM Rll l i>>

<< I

[7 V

r<<

} w

>>I M

~

/ ~ I V

J.

D. Shiffer December 14, 1988 Please contact us if you have any questions regarding this evaluation.

This completes our efforts on TAC Nos.

62155 and 60656.

Sincerely, Harry Rood, Senior Project t1anager Project Directorate V

Division of Reactor Projects - III, IV, V and Special Projects

Enclosures:

1. Safety Evaluation, Unit 1, w/att.
2. Safety Evaluation, Unit 2, w/att.

cc w/enclosures:

See next page

/PD5 DRSP/PD5 J

HRood 12/[ /88 12/[f/88 OFFICIAL RECORD COPY

~

~

DRSP/D:PD5 GKnighton 12/ J$ /88

e I

f 1

ff ll III

)

J e

II Q

V Q

III II

J.

D. Shiffer December 14, 1988 Please contact us if you have any questions regarding this evaluation.

This completes our efforts on TAC Nos.

62155 and 60656.

Sincerely, Harry Roo

, Senior Project Hanager Project Directorate V

Division of Reactor Projects - III, IV, V and Special Projects

Enclosures:

I. Safety Evaluation, Unit I, w/att.

2. Safety Evaluation, Unit 2, w/att.

cc w/enclosures:

See next page

0

Mr. J.

D. Shiffer Pacific Gas and Electric Company Diablo Canyon CC:

Richard F. Locke, Esq.

Pacific Gas 8 Electric Company Post Office Box 7442 San Francisco, Califor'nia 94120 Janice E. Kerr, Esq.

California Pub1ic Utilities Cooeission 350 McAllister Street San Francisco, California.94102 Ms. Sandra A. Silver 660 Granite Creek Road Santa Cruz, California 95065 Mr.

W. C. Gangloff Westinghouse Electric Corporation P. 0.

Box 355 Pittsburgh, Pennsylvania

'15230 Managing Editor San Luis Obispo County Telegram Tribune 1321 Johnson Avenue P. 0.

Box 112 San Luis Obispo, California 93406 Mr. Leland M. Gustafson, Manager Federal Relations Pacific Gas and Electric Company 1726 M Street, N.

W.

Washington, DC

- 20036-4502 Dian M. Grueneich Marcia Preston Law Office of Dian M. Grueneich 380 Hayes Street, Suite 4

San Francisco, California 94102 NRC Resident Inspector Diablo Canyon Nuclear Power Plant c/o U.S. Nuclear Regulatory Commission P. 0.

Box 369 Avila Beach, California 93424 Mr. Dick Blakenburg Editor 5 Co-Publisher South County Publishing Company P. 0.

Box 460 Arroyo Grande, California 93420 Bruce Norton, Esq.

c/o Richard F. Locke, Esq.

Pacific Gas and Electric Company Post Office Box 7442 San Francisco, California 94120 Dr. R. B. Ferguson Sierra Club - Santa Lucia Chapter Rocky Canyon Star Route Creston, California 93432 Chairman San Luis Obispo County Board of Super visor s Room 270 County Government Center San Luis Obispo, California 93408 Director Energy Facilities Siting Division Energy Resources Conservation and Development Comnission 1516 9th Street Sacramento, California 95814 Ms. Jacquelyn Wheeler 3033 Barranca Court San Luis Obispo, California 93401

l

~ 4

Pacific Gas 8 Electric Company Diablo Canyon CC:

Ms. Laurie McDermott, Coordinator Consumers Organized for Defense of Environmental Safety 731 Pacific Street, Suite 42 San Luis Obispo, California 93401 Mr. Jack McGurk, Acting Chief Radiological Heal th Branch State Department of Health Services 714 P Street, Office Building 88 Sacramento, California 95814 Regional Administrator, Region V

U.S. Nuclear Regulatory Commission 1450 Maria Lane Suite 210 Walnut Creek, California 94596 Ms. Nancy Culver 192 Luneta Street San Luis Obispo, California 93401 President California Public Utilities Commission California State Building 350 McAllister Street San Francisco, California 94102 Michael M. Strumwasser, Esq.

Special Assistant Attorney General State of California Department of Justice 3580 Wilshire Boulevard, Room 800 Los Angeles, California 90010

'V

~

~ '