Docket Nos.
50-275 and 50-323 Mr. J.
D. Shiffer, Vice President Nuclear Power Generation c/o Nuclear Power Generation, Licensing Pacific Gas and Electric Company 77 Beale Street, Room 1451 San Francisco, California 94106
SUBJECT:
SPENT FUEL POOL RERACKING The reporting and/or recordkeeing requirements of this letter affect fewer than ten respondents; therefore, OMB clearance is not required under P.L.96-511.
February 18, 1986 DISTRIBUTION NRC PDR L PDR Gray File PAD-3 Rdg H. Thompson H. Schierling C. 'Vogan OELD E. Jordan B. Grimes J. Partlow ACRS 10 R. Ballard T. quay D. Jeng F. Rinaldi J.
Shapaker C. Herrick (Franklin Research
Dear Mr. Shiffer:
Center)
A. Singh R. Serbu R. Fell J.
Wing W. Brooks H. Gi1 pin L. Chandler J. Milhoan Your letters of January 28, 1986 (DCL-85-019 and 020) provided additional information regarding your proposed spent fuel pool reracking, as requested by the staff.
Based on the staff visit on January 27, 1986 to the Joseph Oat Company, designer and manufacturer of the spent fuel racks for the Diablo Canyon Nuclear Power Plant, we have determined that further information regarding the structural analysis is required for the staff to complete its review.
The information is identified in the enclosure.
We plan to discuss your response to our request in a meeting with you on February 20, 1986 in Bethesda, Maryland.
Sincerely,
/s/SVarga
Enclosure:
As stated Hans Schierling, Senior Project Manager PWR Project Directorate No.
3 Division of PWR Licensing-A cc w/enclosure:
See next page 86022l0734 860218 PDR ADOCK 05000275'
'DR PPO-3 y)
PAD-3 CVogan HSc ie i g;ps 02/14'86 02/
86
1 N
/
Q II l
Mr. J.- D. Shiffer Pacific Gas and Electric Company Diablo Canyon CC:
Philip A. Crane, Jr.,
Esq.
Pacific Gas
& Electric Company Post Office Box 7442
'an Francisco, California 94120 Mr. Malcolm H. Furbush Vice President - General Counsel Pacific Gas
& Electric Company Post Office Box 7442 San Francisco, California 94120 Janice E. Kerr, Esq.
California Public Utilities Commission 350 McAllister Street San Francisco, California 94102 Mr. Frederick Eissler, President Scenic Shoreline Preservation Conference, Inc.
4623 More Mesa Drive Santa Barbara, California 93105 Ms. Elizabeth Apfelberg 1415 Cozadero San Luis Obispo, California 93401 Mr. Gordon A. Silver Ms. Sandra A. Silver 1760 Alisal Street San Luis Obispo, California 93401 Harry M. Willis, Esq.
Seymour
& Willis 601 California Street, Suite 2100 San Franc isco, Ca 1 ifornia 94108 Mr. Richard Hubbard MHB Technical Associates Suite K
1725 Hamilton Avenue San Jose, California 95125 Resident Inspector/Diablo Canyon NPS c/o US Nuclear Regulatory Commission P. 0.
Box 369 Avila Beach, California'3424 Ms.
Raye Fleming 1920 Mattie Road Shell Beach, California 93440 Joel
- Reynolds, Esq.
John R. Phillips, Esq.
Center for Law in the Public Interest
~
10951 West Pico Boulevard Third Floor Los Angeles, California 90064 Mr. Dick Blankenburg Editor
& Co-Publisher South County Publishing Company P. 0.
Box 460 Arroyo Grande, California 93420 Bruce Norton, Esq.
Norton, Burke, Berry & French, P.C.
202 E. Osborn Road P. 0.
Box 10569 Phoenix, Arizona 85064 Mr. W. C. Gangloff Westinghouse Electric Corporation P. 0.
Box 355 Pittsburgh, Pennsylvania 15230 David F. Fleischaker, Esq.
P. 0.
Box 1178 Oklahoma City, Oklahoma 73101 Mr. John Marrs, Managing Editor San Luis Obis o Count Tele ram Tribune o nson venue P. 0.
Box 112 San Luis Obispo, California 93406
Pacific Gas 5 Electric Company Diablo Canyon CC:
Arthur C. Gehr, Esq.
Snell 5 Wilmer 3100 Valley Center Phoenix, Arizona 85073 Mr. Le 1 and M.
Gus taf son, Mana ger Federal Relations Pacific Gas 8 Electric Company 1726 M Street, N.W.
Suite 1100 Washington, DC 20036-4502 Regional Administrator, Region V
U.S. Nuclear Regulatory Commission 1450 Maria Lane Suite 210 Walnut Creek, California 94596 Michael J. Strumwasser, Esq.
Special Counsel to the Attorney General State of California 3580 Wilshire Boulevard, Suite 800 Los Angeles, California 90010 Mr. Tom Harris Sacramento Bee 21st and 0 Streets Sacramento, California 95814 Mr. H. Daniel Nix California Energy Commission 1516 9th Street, MS 18 Sacramento, California 95814 Lewis Shollenberger, Esq.
US Nuclear Regulatory Commission Region V
1450 Maria Lane Suite 210 Walnut Creek, California 94596 Mr. Thomas Devine Government Accountability Project Institute for Policy Studies 1901 Que Street, NW Washington, DC 20009 Chairman San Luis Obispo County Board of Supervisors Room 220 County Courthouse Annex San Luis Obispo, California 93401 Director Energy Facilities Siting Division Energy Resources Conservation and Development Commission 1516 9th Street Sacramento, California 95814 President California Public Utilities Commission California State Building 350 McAllester Street San Francisco, California 94102 Mr. Joseph
- 0. Ward, Chief Radiological Health Branch State Department of Health Services 714 P Street, Office Building 08 Sacramento, California 95814
t
ENCLOSURE REQUEST FOR ADDITIONAL INFORMATION DIABLO CANYON NUCLEAR POWER PLANT, UNITS I AND 2 SPENT FUEL POOL RERACKING (Continued) 26.
With respect to the computer code DYNAHIS discuss specific efforts performed to verify that the code provides realistic seismic responses of the fuel racks when subjected to a set of complex loading conditions and geometric constraints.
For example, indicate if experimental data were used as a basis for demonstrating the validity of the code.
Provide a discussion of the assumptions and limitations which are unique to the code.
27.
Selected load combination cases, relative geometries of various fuel
- racks, and directions of seismic motion were considered in the fuel rack analyses.
Discuss in detail how this approach bounds the significant cases of fuel rack load geometry conditions to ensure the structural integrity and functionality of the racks.