ML16342A528

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-275/98-14 & 50-323/98-14 on 980802-0912 & NOV Re Failure to Maintain Fire Protection Program
ML16342A528
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 10/06/1998
From: Greg Pick
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Rueger G
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16342A529 List:
References
50-275-98-14, 50-323-98-14, NUDOCS 9810140072
Download: ML16342A528 (12)


See also: IR 05000275/1998014

Text

UA.i'i GUKY

4

REGULATORY INFORMATION DISTRIBUTION SYSTEM

(RIDS)

ACCESSION NBR:9810140072

DOC.DATE: 98/10/06

NOTARIZED: NO

FACIL:50-275 Diablo Canyon Nuclear Power Plant, Unit 1, Pacific

Ga

50-323 Diablo Canyon Nuclear Power Plant, Unit 2, Pacific

Ga

AUTH.NAME

AUTHOR AFFILIATION

ICK,G.A.

.

Region

4 (Post

820201)

RECIP.NAME

RECIPIENT AFFILIATION

RUEGER,G.M.

Pacific Gas

& Electric Co.

SUBJECT:

Forwards insp repts 50-275/98-14

6 50-323/98-14

on

980802-0912

&, NOV.Violation involved failure to maintain

fire protection program.

DISTRIBUTION CODE: IE01F

COPIES

RECEIVED:LTR

ENCL

SIZE:

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

NOTES:

DOCKET

0500027'5

05000323

RECIPIENT

ID CODE/NAME

PD4-2

PD

COPIES

LTTR ENCL

1

1

RECIPIENT

ID CODE/NAME

BLOOM,S

COPIES

LTTR ENCL

1

1

C

INTERNAL: ACRS

AEOD/TTC

CE

NRR/DRPM/PECB

NUDOCS-ABSTRACT

OGC/HDS3

ERNAL: LITCO BRYCE,J H

NRC PDR

2

2

1

1

1

1

1

1

1

1

1

1

1

1

1

1

AEOD/SPD/RAB

DEDRO

NRR/DRCH/HOHB

NRR/DRPM/PERB

OE DIR

RGN4

FILE

01

NOAC

NUDOCS FULLTEZT

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE.

TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LIST

OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTRO

DESK

(DCD)

ON EXTENSION 415-2083

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

19

ENCL

19

0

~p,R Afgy

'Fp

s >(

0

Ij'

~**4

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

611 RYAN PLAZAORIVE. SUITE 400

ARLINGTON.TEXAS 76011.8064

OCT -6

l998

Gregory M. Rueger, Senior Vice President

and General Manager

Pacific Gas and Electric Company

Nucle'ar Power Generation

Diablo Canyon Nuclear Power Plant

P.O. Box 3

Avila Beach, California 93424

SUBJECT: NRC INSPECTION REPORT 50-275/98-14; 50-323/98-14 AND NOTICE OF

VIOLATION

Dear Mr. Rueger:

From August 2 through September

12, 1998, a routine inspection was conducted at your Diablo

Canyon Nuclear Power Plant, Units 1 and 2, reactor facilities. The enclosed report presents the

scope and results of that inspection.

During the 6-week period covered by this inspection period, your conduct of activities at the

Diablo Canyon Nuclear Power Plant facilitywas generally characterized by safety-conscious

operations, sound engineering and maintenance practices, and good radiation protection

support.

Based on the results of this inspection, a violation of NRC requirements was identified. This

violation involved failure to maintain the fire protection program appropriately, in that your fire.

protection program defined a continuous fire watch as a 15-minute fire watch roving patrol

'without further explanation of limitations of its use.

Because of this program inadequacy, the

revised definition of a continuous fire watch was used inappropriately on several occasions.

The violation is cited in the enclosed Notice of Violation (Notice) and the circumstances

surrounding this violation are described in detail in the enclosed report. The NRC has

concluded that information regarding the reason for the violation and the corrective actions

taken and planned to correct the violation and prevent, recurrence is already adequately

addressee'n

the docket in the enclosed report. Therefore, you are not required to respond to

the violation unless the description therein does not accurately reflect your corrective actions or

your position.

In that case, or if you choose to provide additional information, you should follow

the instructions specified in the enclosed notice.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and

its

enclosures,

willbe placed in the NRC Public Document Room (PDR).

'PBiOi40072 98f

006'DR

ADQCK 05000275

8

PDR

Pacific Gas and Electric Company

-2-

Should you have any questions concerning this inspection, we willbe pleased to discuss them

with you.

Sincerely,

&o. PX

G. A. Pick, Acting Chief

Reactor Projects Branch E

Division of Reactor Projects

Docket Nos.:

50-275

50-323

License Nos.: DPR-80

DPR-82

Enclosures:

1.

Notice of Violation

2.

NRC Inspection Report

50-275/98-14; 50-323/98-14

cc w/enclosures:

Dr. Richard Ferguson

Energy Chair

Sierra Club California

1100 lith Street, Suite 311

Sacramento,

California 95814

Ms. Nancy Culver

San Luis Obispo Mothers for Peace

P.O. Box 164

Pismo Beach, California 93448

Chairman

San Luis Obispo County Board of

Supervisors

Room 370

County Government Center

San Luis Obispo, California 93408

Mr. Truman BurnshMr. Robert Kinosian

California Public Utilities Commission

505 Van Ness, Rm. 4102

San Francisco, California 94102

0

0

Pacific Gas and Electric Company

-3-

Robert R. Wellington, Esq.

Legal Counsel

Diablo Canyon Independent Safety Committee

857 Cass Street, Suite D

Monterey, California 93940

Mr. Steve Hsu

Radiologic Health Branch

State Department of Health Services

P.O. Box 942732

Sacramento,

California 94234

Christopher J. Warner, Esq.

Pacific Gas and Electric Company

P.O. Box 7442

San Francisco, California 94120

David H. Oatley, VicePresident-

Diablo Canyon Operations and

Plant Manager

P.O. Box 3

Avila Beach, CA 93424

Managing Editor

Telegram-Tribune

1321 Johnson Avenue

P.O. Box 112

San Luis Obispo, California 93406

0

Pacific Gas and Electric Company

E-Mail report to T. Frye (TJF)

E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

E-Mail report to Richard Correia (RPC)

E-Mail report to Frank Talbot (FXT)

bcc to DCD (IE01)

bcc distrib. by RIV:

Regional Administrator

DRP Director

Branch Chief (DRP/E, WCFO)

Senior Project Inspector (DRP/E, WCFO)

Branch Chief (DRP/TSS)

WCFO File

Resident Inspector

DRS-PSB

MIS System

RIV File

DOCUMENTNAME'A DC'tDC814RP.DLP

To receive co

of document, Indicate in box: "C = Co

without enclosures

"E" = Co

with enclosures "N" = No co

RIV:RI

DBAllen*

10/2/98

C:DRS/OB

JLPellet

10/

/98

Rl

DGAcker*

10/1/98

AC:DRP

GAPic

10

98

RI

JGKramer*

9/30/98

SRI

DLProulx*

10/5/98

PE

BO!son*

9/29/98

  • Previously Concurred

OFFICIALRECORD COPY

Pacific Gas and Electric Company

E-Mail report to T. Frye (TJF)

E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

E-Mail report to Richard Correia (RPC)

E-Mail report to Frank Talbot (FXT)

bcc to DCD (IE01)

bcc distrib. by RIV:

Regional Administrator

DRP Director

Branch Chief (DRP/E, WCFO)

Senior Project Inspector (DRP/E, WCFO)

Branch Chief (DRP/TSS)

WCFO File

Resident Inspector

DRS-PSB

MIS System

RIV File

DOCUMENT NAME: R:QDC>DC814RP.DLP

To receive co

of documen

Indicate In box: "C" = Co

without enclosures

"E" ~ Con

with enclosures "N ~ No co

RIV:RI

DBAIlen*

10/2/98

C:DRS/OB

JLPellet

10/

/98

RI

DGAcker*

10/1/98

AC:DRP

GAPic

10

98

Rl

JGKramer*

9/30/98

SRI

DLProulx*

10/5/98

BOlson*

9/29/98

  • Previously Concurred

OFFICIAL RECORD COPY