ML16342A528
| ML16342A528 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 10/06/1998 |
| From: | Greg Pick NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Rueger G PACIFIC GAS & ELECTRIC CO. |
| Shared Package | |
| ML16342A529 | List: |
| References | |
| 50-275-98-14, 50-323-98-14, NUDOCS 9810140072 | |
| Download: ML16342A528 (12) | |
See also: IR 05000275/1998014
Text
UA.i'i GUKY
4
REGULATORY INFORMATION DISTRIBUTION SYSTEM
(RIDS)
ACCESSION NBR:9810140072
DOC.DATE: 98/10/06
NOTARIZED: NO
FACIL:50-275 Diablo Canyon Nuclear Power Plant, Unit 1, Pacific
Ga
50-323 Diablo Canyon Nuclear Power Plant, Unit 2, Pacific
Ga
AUTH.NAME
AUTHOR AFFILIATION
ICK,G.A.
.
Region
4 (Post
820201)
RECIP.NAME
RECIPIENT AFFILIATION
RUEGER,G.M.
Pacific Gas
& Electric Co.
SUBJECT:
Forwards insp repts 50-275/98-14
6 50-323/98-14
on
980802-0912
&, NOV.Violation involved failure to maintain
DISTRIBUTION CODE: IE01F
COPIES
RECEIVED:LTR
ENCL
SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:
DOCKET
0500027'5
05000323
RECIPIENT
ID CODE/NAME
PD4-2
COPIES
LTTR ENCL
1
1
RECIPIENT
ID CODE/NAME
BLOOM,S
COPIES
LTTR ENCL
1
1
C
INTERNAL: ACRS
AEOD/TTC
NRR/DRPM/PECB
NUDOCS-ABSTRACT
OGC/HDS3
ERNAL: LITCO BRYCE,J H
NRC PDR
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
AEOD/SPD/RAB
DEDRO
NRR/DRCH/HOHB
NRR/DRPM/PERB
OE DIR
RGN4
FILE
01
NOAC
NUDOCS FULLTEZT
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE.
TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LIST
OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTRO
DESK
(DCD)
ON EXTENSION 415-2083
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
19
ENCL
19
0
~p,R Afgy
'Fp
s >(
0
Ij'
~**4
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
611 RYAN PLAZAORIVE. SUITE 400
ARLINGTON.TEXAS 76011.8064
OCT -6
l998
Gregory M. Rueger, Senior Vice President
and General Manager
Pacific Gas and Electric Company
Nucle'ar Power Generation
Diablo Canyon Nuclear Power Plant
P.O. Box 3
Avila Beach, California 93424
SUBJECT: NRC INSPECTION REPORT 50-275/98-14; 50-323/98-14 AND NOTICE OF
VIOLATION
Dear Mr. Rueger:
From August 2 through September
12, 1998, a routine inspection was conducted at your Diablo
Canyon Nuclear Power Plant, Units 1 and 2, reactor facilities. The enclosed report presents the
scope and results of that inspection.
During the 6-week period covered by this inspection period, your conduct of activities at the
Diablo Canyon Nuclear Power Plant facilitywas generally characterized by safety-conscious
operations, sound engineering and maintenance practices, and good radiation protection
support.
Based on the results of this inspection, a violation of NRC requirements was identified. This
violation involved failure to maintain the fire protection program appropriately, in that your fire.
protection program defined a continuous fire watch as a 15-minute fire watch roving patrol
'without further explanation of limitations of its use.
Because of this program inadequacy, the
revised definition of a continuous fire watch was used inappropriately on several occasions.
The violation is cited in the enclosed Notice of Violation (Notice) and the circumstances
surrounding this violation are described in detail in the enclosed report. The NRC has
concluded that information regarding the reason for the violation and the corrective actions
taken and planned to correct the violation and prevent, recurrence is already adequately
addressee'n
the docket in the enclosed report. Therefore, you are not required to respond to
the violation unless the description therein does not accurately reflect your corrective actions or
your position.
In that case, or if you choose to provide additional information, you should follow
the instructions specified in the enclosed notice.
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and
its
enclosures,
willbe placed in the NRC Public Document Room (PDR).
'PBiOi40072 98f
006'DR
ADQCK 05000275
8
Pacific Gas and Electric Company
-2-
Should you have any questions concerning this inspection, we willbe pleased to discuss them
with you.
Sincerely,
&o. PX
G. A. Pick, Acting Chief
Reactor Projects Branch E
Division of Reactor Projects
Docket Nos.:
50-275
50-323
License Nos.: DPR-80
DPR-82
Enclosures:
1.
2.
NRC Inspection Report
50-275/98-14; 50-323/98-14
cc w/enclosures:
Dr. Richard Ferguson
Energy Chair
1100 lith Street, Suite 311
Sacramento,
California 95814
Ms. Nancy Culver
San Luis Obispo Mothers for Peace
P.O. Box 164
Pismo Beach, California 93448
Chairman
San Luis Obispo County Board of
Supervisors
Room 370
County Government Center
San Luis Obispo, California 93408
Mr. Truman BurnshMr. Robert Kinosian
California Public Utilities Commission
505 Van Ness, Rm. 4102
San Francisco, California 94102
0
0
Pacific Gas and Electric Company
-3-
Robert R. Wellington, Esq.
Legal Counsel
Diablo Canyon Independent Safety Committee
857 Cass Street, Suite D
Monterey, California 93940
Mr. Steve Hsu
Radiologic Health Branch
State Department of Health Services
P.O. Box 942732
Sacramento,
California 94234
Christopher J. Warner, Esq.
Pacific Gas and Electric Company
P.O. Box 7442
San Francisco, California 94120
David H. Oatley, VicePresident-
Diablo Canyon Operations and
Plant Manager
P.O. Box 3
Avila Beach, CA 93424
Managing Editor
Telegram-Tribune
1321 Johnson Avenue
P.O. Box 112
San Luis Obispo, California 93406
0
Pacific Gas and Electric Company
E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
E-Mail report to Richard Correia (RPC)
E-Mail report to Frank Talbot (FXT)
bcc to DCD (IE01)
bcc distrib. by RIV:
Regional Administrator
DRP Director
Branch Chief (DRP/E, WCFO)
Senior Project Inspector (DRP/E, WCFO)
Branch Chief (DRP/TSS)
WCFO File
Resident Inspector
DRS-PSB
MIS System
RIV File
DOCUMENTNAME'A DC'tDC814RP.DLP
To receive co
of document, Indicate in box: "C = Co
without enclosures
"E" = Co
with enclosures "N" = No co
RIV:RI
DBAllen*
10/2/98
C:DRS/OB
JLPellet
10/
/98
Rl
DGAcker*
10/1/98
AC:DRP
GAPic
10
98
RI
JGKramer*
9/30/98
DLProulx*
10/5/98
BO!son*
9/29/98
- Previously Concurred
OFFICIALRECORD COPY
Pacific Gas and Electric Company
E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
E-Mail report to Richard Correia (RPC)
E-Mail report to Frank Talbot (FXT)
bcc to DCD (IE01)
bcc distrib. by RIV:
Regional Administrator
DRP Director
Branch Chief (DRP/E, WCFO)
Senior Project Inspector (DRP/E, WCFO)
Branch Chief (DRP/TSS)
WCFO File
Resident Inspector
DRS-PSB
MIS System
RIV File
DOCUMENT NAME: R:QDC>DC814RP.DLP
To receive co
of documen
Indicate In box: "C" = Co
without enclosures
"E" ~ Con
with enclosures "N ~ No co
RIV:RI
DBAIlen*
10/2/98
C:DRS/OB
JLPellet
10/
/98
RI
DGAcker*
10/1/98
AC:DRP
GAPic
10
98
Rl
JGKramer*
9/30/98
DLProulx*
10/5/98
BOlson*
9/29/98
- Previously Concurred
OFFICIAL RECORD COPY