Forwards Insp Repts 50-275/94-07 & 50-323/94-07 on 940217- 0319 & Nov.Violation Involves Failure to Appropriately Implement Requirements of Operating Procedure
ML16342A476
Person / Time
Site: Diablo Canyon  
Issue date: 04/01/1994
From: Perkins K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Rueger G
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16342A477 List:
References
NUDOCS 9404150134
Download: ML16342A476 (6)


See also: IR 05000275/1994007

Text

~t,R RKQy

~,

I

o

O

r

h

4

Oh

>>>>*+>>

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION V

1450 MARIALANE,

WALNUTCREEK, CALIFORNIA94595-5368

APR I

iog

Dockets:

50-275

50-323

Licenses:

DPR-80

DPR-82

Pacific

Gas

and Electric Company

ATTN:

G.

H. Rueger,

Senior Vice President

and General

Manager,

Nuclear

Power Generation

Business

Unit

P. 0.

Box 770000

San Francisco,

California 94177

SUBJECT:

NRC

INSPECTION

REPORT 50-275/94-07;

50-323/94-07

(NOTICE OF

VIOLATION)

This refers to the routine inspection

conducted

by H. Miller, and the

inspectors

identified in the enclosed

report, of this office on February

17,

through March 19,

1994.

The inspection

included

a review of activities

authorized for your Diablo Canyon Nuclear

Power Generating Station,

Units

1

and 2, facility.

At the conclusion of the inspection,

the findings were

discussed

with those

members of your staff identified in the enclosed

report.

Areas

examined during this inspection

are identified in the report.

Within

these

areas,

the inspection consisted of selective

examinations

of procedures-

and representative

records,

interviews with personnel,

and observation of

activities in progress.

=

Based

on the results of this inspection,

certain licensed activities were in

violation of NRC requirements,

as specified in the enclosed

Notice of

Violation (Notice).

This violation is of concern

because it involved

a

failure to appropriately

implement the requirements

of an operating

procedure

during reduced

reactor coolant

system inventory activities.

Operators

did not

properly vent the reactor vessel

head during

a draindown of the Unit

1 reactor

coolant system.

This resulted

in an abrupt

change

in

RCS level indication of

over six feet.

Although the reactor core

was never in any danger of becoming

uncovered during this event,

the event illustrates the need to positively

control operations

at reduced

inventory and the need for operators

to

anticipate the effects of their actions

before proceeding.

Regarding

an unrelated

issue,

while evaluating

an

NRC followup item during the

period of this inspection, it is our understanding

that Mr. M. Angus,

Manager,

Nuclear Engineering Services,

committed to install

ASME required tailpipe

'rains

in all relief valve tailpipes for which ASHE code

commitments

were

9404150i~

05pppg75

4 94040i

PDR

Q

~

'

Paci fi c Gas

And El ectri c

-2-

applicable.

If your understanding

of this commitment differs from ours,

please

contact

me immediately.

You are required to respond

to this letter and should follow the instructions

specified in the enclosed

Notice when preparing your response.

In your

response,

you should document the specific actions taken

and

any additional

actions you plan'to prevent recurrence.

After reviewing your response

to this

Notice, including your proposed corrective actions

and the results of future

inspections,

the

NRC will determine

whether further

NRC enforcement

action is

necessary

to ensure

compliance with NRC regulatory requirements.

In accordance

with 10 CFR 2.790(a) of the NRC's "Rules of Practice,"

a copy of

this letter

and its enclosure(s) will be placed in the

NRC Public Document

Room.

C

The responses

directed

by this letter

and the enclosed

Notice are not subject

to the clearance

procedures

of the Office of Management

and

Budget

as required

by the Paperwork Reduction Act of 1980,

Pub.

No.96-511.

Should you have

any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

Sincerely,

'iO~

K. E. Perkins

Acting Regional Administrator

Enclosures:

l.

Appendix A - Notice of Violation

2.

Appendix

B -

NRC Inspection

Reports

'0-275/94-07;

50-323/94-07

CC:

Dr. Richard Ferguson,

Energy Chair, Sierra

Club California

Ms. Nancy Culver,

San Luis Obispo Mothers for Peace

Ms. Jacquelyn

C. Wheeler

Managing Editor, The County Telegram Tribune

Chairman,

San Luis Obispo County Board of Supervisors

Mr. Truman Burns, California Public Utilities Commission

Mr. Robert Kinosian, California Public Utilities Commission

Robert

R. Wellington, Esq.,

Diablo Canyon

Independent

Safety

Committee

Mr. Steve

Hsu, Radiologic Health Branch,

State

Department

of Health Services

Mr. Peter

H. Kaufman,

Deputy Attorney General,

State of California

Christopher J. Warner,

Esq.,

PGRE

Mr. John

Townsend,

Vice President

and Plant Manager,

Diablo Canyon

0

Pacific Gas

And Electric

bcc w/copy of enclosures

I and 2:

Docket File

Project Inspector

Resident

Inspector

K. Perkins

S. Richards

R.

Huey

D. Kirsch

S. Peterson,

NRR

G.

Cook

bcc w/enclosure I only:

N. Smith

J.

Bianchi

D. Clevenger

D. Sullivan (electronic copy)

RIV:SRI:DRP I

/94

D:WCFO

KEper

'

C:DRP I

DFKi s

9/

94

SEND TO DCS

"

.SEND TO

PDR

YES

NO

YES

NO

File Location:

G: (PSl(DC( INSPRPTS)DC-94-07. FNL

0'