ML16342A436

From kanterella
Jump to navigation Jump to search
Forwards Exam Rept 50-275/OL-94-01 on 940216.No Violations Noted
ML16342A436
Person / Time
Site: Diablo Canyon  
Issue date: 03/01/1994
From: Richards S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Rueger G
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16342A437 List:
References
NUDOCS 9403150414
Download: ML16342A436 (8)


Text

pe REGy, tp0 O

Ih0 Cy I~ +**y4 UNITED STATES NUCLEAR REGULATORYCOMMISSION REGION V 1450 MARIALANE WALNUTCREEK, CALIFORNIA94596-5368 Docket Nos.

50-275/323 NR i tyg Pacific Gas and Electric Company Nuclear Power Generation, B14A 77 Beale'Street, Room 1451 P. 0.

Box 770000 San Francisco, California 94177 Attention:

Hr. Gregory H. Rueger Senior Vice President and General

Hanager, Nuclear Power Generation Business Unit

Subject:

INITIAL WRITTEN RETAKE EXAHIHATIOH (EXAHIHATION REPORT NUHBER 50-275/OL-94-01)

On February 16, 1994 the NRC administered an initial licensing written retake examination to one Senior Rea'ctor Operator (SRO) upgrade applicant who had reapplied to operate your Diablo Canyon Nuclear Power Plant, Units 1 and 2.

The NRC granted this applicant a waiver for the operating portion of the examination in accordance with the "Operator Licensing Examiner Standards,"

NUREG 1021, Revision 7.

The applicant passed the written examination retake and was subsequently issued a Senior Reactor Operator's license.

Your training and operating staffs provided good technical support in the validation of the examination test materials.

They were particularly helpful in providing all appropriate examination.reference materials, scheduling examination review and administration, and thoroughly validating the written examination.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and Enclosure (1) will be placed in the NRC Public Document Room.

If, you have any questions or comments concerning the NRC identified issues or examination criteria for individual operators, please contact us.

Sincerely, Stuart A. Richards, Acting Director Division of Reactor Safety and Projects 9403~50414 950002 pDR ADOCK o pDR V

Enclosures:

l.

Examination Report 50-275/OL-94-01 2.

Answer Sheets and Answer Key (SRO) cc w/enclosure 1 only:

Dr. Richard Ferguson, Energy Chair, Sierra Club California Ns.

Nancy Culver, San Luis Obispo Mothers for Peace Ns. Jacquelyn C. Wheeler Managing Editor, The County Telegram Tribune

Chairman, San Luis Obispo County Board of Supervisors Nr. Truman Burns, California Public Utilities Commission Nr. Robert Kinosian, California Public Utilities Commission Robert R. Wellington, Esq.,

Diablo Canyon Independent Safety Committee Nr. Steve Hsu, Radiologic Health Branch, State Department of Health Services Nr. Peter H. Kaufman, Deputy Attorney General, State of California Christopher J.

Warner, Esq.,

PG&E Nr. John Townsend, Vice President and Plant Manager, Diablo Canyon cc w/enclosures (1) and (2):

W. Mclane, Diablo Canyon, Director, NPGBU Training J.

Welsch, Diablo Canyon, Supervisor, NPGBU Operations and Engineering Training

H

bcc w/enclosure 1 only:

D. Kirsch, RV K. Perkins, RV S. Richards, RV M. Miller, 'Senior Resident Inspector B. Gallo, NRR/HOLB S. Peterson, Project Manager T. Quay, NRR/PDV P. Morrill, RV T. Meadows, RV P. Morrill, RV J. Pellet, RIV M. Morgan, PNL K. Erickson, PNL CONCURRENCES:

[

UEST COPY

]

REQUES PY

]

T COPY

]

REQUES

]

NO YES N

ES NO YES NO TMEADOWS ~~

DKIRS H

z./~S /94

~/

/94 ORRILL SRICHARDS

g. /yg/94 9/ i /94

[

COPY TO PDR COPY TO DCS E /NO]

NO -P 4d aO7 rZ-~y E~~cazc gZ 2 Pd< w gcf'/Py/9 cg FILE LOCATION:

G:QRSB~. DC c 4~aF Exawr~gg,

r

ENCLOSURE 1

EXAMINATION REPORT 50-275/OL-94-01

61