ML16342A438

From kanterella
Jump to navigation Jump to search
Exam Rept 50-275/OL-94-01 on 940216 for Units 1 & 2.Exam Results:Applicant Passed Written Exam Retake & Was Issued SRO License
ML16342A438
Person / Time
Site: Diablo Canyon  
Issue date: 02/28/1994
From: Morrill P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To:
Shared Package
ML16342A437 List:
References
50-275-OL-94-01, 50-275-OL-94-1, NUDOCS 9403150424
Download: ML16342A438 (4)


Text

Enclosure 1

Examination Report No.:

50-275/OL-94-01 Faci lity Licensee:

Pacific Gas and Electric Company (PG&E)

Faci 1 ity:.

Diablo Canyon Nuclear Power Plant, Units 1 and 2

Facility Docket Nos.:

50-275 and 50-323 Facility License Nos.:

DPR-80 and DPR-82 Licensed operator initial

'written retake examination admini'stered at Diablo Canyon,"near San Luis Obispo, Ca.

Examiners:

T. Meadows, Chief Examiner K. Erickson,

Examiner, PNL Approved by:

~Summar:

Phi li J.

Mo ill, Chief Operations Branch Date Signed On February 16, 1994 the NRC administered an initial written retake licensing examination to one Senior Reactor Operator upgrade (SROU) applicant at the Diablo Canyon. Nuclear Power Plant, Units 1 and 2.

The NRC granted this applicant a waiver for the operating portion of the examination in accordance with the Operator Licensing Examiner Standards, NUREG 1021, revision 7.

The SROU applicant passed the written examination retake and was subsequently issued a Senior Reactor Operator's license.

The licensee's training and operating staffs provided good technical support in the validation of the examination test materials.

They were particularly helpful during the validation reviews of the written examination.

The licensee's support in providing examination reference materials and other logistical assi stance was excellent.

9403150424 940301 PDR ADOCK 05000275 V

PDR

REPORT DETAILS Personnel Contacted NRC Personnel:

. "T. Meadows, Chief Examiner K., Erickson,

Examiner, PNL Diablo Can on Personnel:
  • J. Welsch, Supervisor, Nuclear Power Generation Business Unit Operations and Engineering Training
  • R. Glaza, Senior Instructor T. Pate, Instructor
  • NOTE:

Attended the exit meeting on February 16, 1994.

Mritten Test Administration The Chief Examiner reviewed and validated the SRO retake written examination at the Diablo Canyon site on February 1,

1994 with representatives from the licensee's staff.

Examination security was maintained in accordance with NUREG 1021.

On February 16, 1994 the Chief Examiner administered the initial written retake licensing examination to one Senior Reactor Operator upgrade (SROU) applicant at the Diablo Canyon site.

The SROU applicant passed the written examination retake and was subsequently issued a Senior Reactor Operator's license.

The licensee's training and operating staffs provided good technical support in the validation of the examination test materials.

They were particularly helpful during the validation reviews of the written examination.

The licensee's support in providing examination reference materials and other logistical assistance was excellent.

Immediately following the examination the Chief Examiner held a post examination review with the same licensee review team that had previously validated the examination.

The licensee staff stated that they had no further examination comments.

Exit Meetin An exit meeting was held by the Chief Examiner with representatives of the licensee's staff after the post examination review on February 16, 1994 to discuss the examination administration process.

The licensee staff affirmed that they had no further comments on the as given examination and that the test was as validated.

The licensee did not identify as proprietary any of the materials provided to or reviewed by the examiners during the examination.

n