ML16342A178

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-275/93-05 & 50-323/93-05 on 930503- 0609.No Violations Noted
ML16342A178
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 06/28/1993
From: Miller L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Rueger G
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16342A179 List:
References
NUDOCS 9307260039
Download: ML16342A178 (6)


See also: IR 05000275/1993005

Text

~pS REgy

c"

0

Cy

0

C

O

I

cO0

/y

QN

/p +**<<+

UNITED STATES

NUCLEAR REGULATORYCOMMISSION

REGION V

1450 MARIALANE

WALNUTCREEK. CALIFORNIA94596-5368

JUN 28

3SS3

Docket Nos.

50-275

and 50-323

Pacific Gas

and Electric Company

Nuclear

Power Generation,

B14A

77 Beale Street,

Room 1451

P.O.

Box 770000

San Francisco,

California 94177

Attention:

Hr. Gregory H. Rueger,

Senior Vice President

and General

Hanager,

Nuclear

Power Generation

Business

Unit

SUBJECT:

NRC

INSPECTION OF DIABLO CANYON UNITS

1

AND 2

(REPORT

NO. 50-275,

50-323/93-05)

This refers to the routine announced

inspection

conducted

by Hr.

G. Johnston

of this office on Hay 3 through

Hay 7,

Hay

17 through

Hay 21,

and June

8

through 9,

1993.

This inspection

examined certain of your activities

authorized

by

NRC license

numbers

DPR-80

and DPR-82.

The results of this

inspection

were provided to .your staff on Hay 21

and June

9,

1993.

Areas

examined during this inspection

are described

in the enclosed

inspection

report.

Within these

areas,

the inspection consisted of selective

examinations of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspector.

No violations or deviations of NRC requirements

were identified within the

scope of this inspection.

In accordance

with 10 CFR 2.790(a),

a copy of this letter

and the enclosure

will be placed in the

NRC Public Document

Room.

Should you have

any questions

concerni,ng this inspection,

we will be pleased

to discuss

them with you.

Sin erely,

. F. Hiller, r

, Chief

actor Safety

ranch

9307260039

930628

PDR

ADOCK 05000275

8

PDR

~+() I

Enclosures:

l.

Inspection

Report Nos. 50-275/93-05

and 50-323/93-05

2.

Simulation Facility Report

cc w/enclosures

(I) and (2):

Dr. Richard Ferguson,

Energy Chair, Sierra

Club California

Ms. Nancy Culver,

San Luis Obispo Mothers for Peace

Ms. Jacquelyn

C. Wheeler

Managing Editor,

The County Telegram Tribune

Chairman,

San Luis Obispo County Board of Supervisors

Mr. Truman Burns, California Public Utilities Commission

Mr. Robert Kinosian, California Public Utilities Commission

Robert

R. Wellington, Esq.,

Diablo Canyon

Independent

Safety Committee

Mr. Steve

Hsu, Radiologic Health Branch,

State

Department

of Health Services

Mr. Peter

H. Kaufman,

Deputy Attorney General,

State of California

Michael

M. Strumwasser,

Esq.,

Special Assistant Attorney General,

State of California

Christopher J.

Warner,

Esq.,

PG&E

Mr. John Townsend,

Vice President

and Plant Manager,

Diablo Canyon

0

bcc w/enclosure:

P.

Johnson

Project Inspector

Resident

Inspector

G.

Cook

B. Faulkenberry

Docket File

bcc w/o enclosure:

H. Smith

J. Zollicoffer

J. Bianchi

G. Johnston

k /Nfl>>

P.

orrill

g/

/93

L. ilier

P.

o

on

fp /J/93

g /93

[REQUEST COPY]

ST COPY]

[REQUEST COPY]

[REQUEST

]

[YES /

NO

]

YES /

NO

]

[YES /

NO

]

[YES /

0]

TO

PDR ]

[YE

/

NO

]

0'