.,; ACCELERATE DOCUMENT DISTRIBUTIONSYSTEM REGULAT INEORMATION DISTRIBUTIONISTEM (RIDE)
J 1
ACCES&ION KBR:9305200317 DOC.DATE: 93/05/07 NOTARIZED: YES DOCKET FACIL:50-275 Diablo Canyon Nuclear Power Plant, Unit 1, Pacific Ga 05000275 50-323 Diablo Canyon Nuclear Power Plant, Unit 2, Pacific Ga 05000323 AUTH.NAME AUTHOR AFFILIATION RUEGERiG.M.
Pacific Gas a Electric Co.
RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Forwards License Amend Request 93-01 to Licenses DPR-80 6
DPR-82,changing TS 3/4.3.3.5, "Remote-Shutdown Instrumentation" to add remote shutdown functions 6 increase allowed outage time for inoperable function to 30 days.
DISTRIBUTION CODE:
A001D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: OR Submittal:
General Distribution D
NOTES:
RECIPIENT ID CODE/NAME PDV LA PETERSONiS INTERNAL: ACRS NRR/DORS/OTSB NRR/DSSA/SCSB NRR/DSSA/SRXB OC/LFMB REG=F 01 COPIES LTTR ENCL 1
1 2
2 6
6 1
1 1
0 1
1 1
0 1
1 RECIPIENT ID CODE/NAME PDV PD NRR/DE/EELB NRR/DRCH/HICB NRR/DSSA/SPLB NUDOCS-ABSTRACT OGC/HDS1 COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 1
0 D
D
'XTERNAL:
NRC PDR 1
1 NSIC 1
1 D
D NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
D TOTAL NUMBER OF COPIES REQUIRED:
LTTR 22 ENCL 19
Pacific Gas and Etectrlc Company 77 Beale Street, Room1451 P.O. Box 770000 San Francisco, CA 94177 415/973-4684 Fax 415/973-2313 Gregory M. Rueger Senior Vice President and General Manager Nuclear Power Generation Hay 7, 1993 PG&E Letter No. DCL-93-114 U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.C.
20555 Re:
Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2
License Amendment Request 93-01 Revision of Technical Specification 3/4.3.3.5 - Revise Technical Specification for Remote Shutdown Instrumentation Gentlemen:
Enclosed is an application for amendment to Facility Operating License Nos.
The enclosed license amendment request (LAR) proposes to change Technical Specification (TS) 3/4.3.3.5, "Remote Shutdown Instrumentation,"
to add remote shutdown control functions, to increase the Allowed Outage Time (AOT) for an inoperable remote shutdown function (instrumentation and control) from 7 days to 30 days, to add an Action Statement that clarifies that separate entry is permitted for each function listed in Table 3.3-9, and to revise the associated TS Basis to incorporate enhanced basis information.
Since the changes proposed in this LAR are not required to address an immediate safety concern, PG&E believes that the NRC review and approval of this LAR should be low priority.
PG&E requests that the proposed changes become effective 30 days after issuance of the license amendment.
Sincerely, Grego y H. Rueger cc:
Edgar Bailey, DHS Ann P.
Hodgdon John B. Hartin Mary Hiller Sheri R. Peterson CPUC Diablo Distribution Enclosure 6100S/85K/PTN/19'
~>> O g 7 9305200327 930507 I'DR ADOCK 05000275 P