Forwards Insp Repts 50-275/92-22 & 50-323/92-22 on on 920714-0824 & Nov.Violation Involves Inadequate Test Procedure Used During Installation Testing of Sixth Emergency Diesel Generator
ML16341G703
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 09/25/1992
From: Richards S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Rueger G
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16341G704 List:
References
NUDOCS 9210090074
Download: ML16341G703 (6)


See also: IR 05000275/1992022

Text

i

gp,~ Ilfeo,

(4

ip0

Op

o

I

'5

0

'~

Cy

+**+~

UNITED STATES

NUCLEAR REGULATORYCOMMISSION

REGION V

1450 MARIAONE

WAI NUT CREEK. CAUFORNIA94596-5368

SKP S5iW-

Pacific

Gas

and Electric Company

Nuclear

Power Generation,

B14A

77 Beale Street,

Room

1451

P. 0.

Box 770000

San Francisco, .California 94177

Attention:

Hr.

G.

H. Rueger,

Senior Vice President

and General

Hanager

Nuclear

Power Generation

Business

Unit

(IeI

Gentlemen:

Subject:

.NOTICE OF VIOLATION

(NRC

INSPECTION

REPORT

NOS. 50-275/92-22

AND 50-323/92-22)

This refers to the routine inspection

conducted

by C. Hyers,

H. Hiller and

P.

Horrill during the period from July 14 through August 24,

1992.

This

inspection

examined your activities

as authorized

by

NRC License

Nos.

DPR-80

and DPR-82.

At the conclusion of the inspection,

the inspectors

discussed

their findings with members of the

PGEE st'aff.

Areas

examined during this inspection

are described

in the enclosed

inspection

report.

Within these

areas,

the inspection consisted of selective

examinations of procedures

and representative

records,

interviews with

personnel,

and obse'rvations

by the inspectors.

Based

on the results of this inspection, it appears

that certain of your

activities were not conducted

in full compliance with NRC requirements,

as set

forth in the enclosed

Notice of Violation (Notice).

The violation of NRC requirements

involves

an inadequate test procedure

used

during installation testing of the sixth emergency

diesel

generator

(EDG), in

that the fuel oil system test procedure

did not contain acceptance

criteria

for system

performance

requirements.

During the latter portion of this

inspection period, the inspectors

also identified additional

apparent

weaknesses

in program controls

and quality oversight associated

with the test

program for the

new

EDG.

These

issues

are still being inspected,

and will be

addressed

in our next inspection report.

You are required to respond to this letter and should follow the instructions

specified in the enclosed

Notice when preparing your response.

In your

response,

you should

document

the specific actions

taken

and

any additional

actions

you plan to prevent recurrence.

After reviewing your response

to this

Notice, including your proposed corrective actions

and the results of future

inspections,,the

NRC will determine

whether further

NRC enforcement

action is

necessary

to ensure

compliance with NRC regulatory requirements.

9210090074

920'F25

PDR

ADOCK 05000275

G

PDR

g( ol

~

~

e

q

i

~

'

In accordance

with 10 CFR 2.790(a),

a copy of this letter,

the enclosures,

and

your response will be placed in the

NRC Public Document, Room.

This letter

and its enclosures

are not subject to the clearance

procedures

of

the Office of Management

and Budget

as required

by the Paperwork Reduction Act

of 1980,

Pub.

L.96-511.

Should you have

any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

Sincerely,

S. A. Richards,

Chief

'eactor

Projects

Branch

Enclosures:

1.

Notice of Violation

2.

Inspection

Report

Nos. 50-275/92-22

and 50-323/92-22

cc w/enclosures:

J.

A. Sexton,

PG&E

C. J.

Warner,

PG&E

J.

D. Townsend,

PG&E (Diablo Canyon)

D. A. Taggart,

PG&E (Diablo Canyon)

T. L; Grebel,

PG&E (Diablo Canyon)

C.

B. Thomas,

News Services,

PG&E

State of California

R. Hendrix, County Administrator

Sandy Silver

-3-

bcc w/copy of enclosure

1 and 2:

Docket Fi,le

Project Inspector

Resident

Inspector

B. Faulkenberry

- J. Hartin

R.

Huey

P. Johnson

H. Rood,

NRR

G.

Cook

bcc of Report Cover

Page

and paragraph

6:

Chief, Inspection

and Licensing

Program

Branch (ILPB),

NRR

(OWFN 12-E-4)

Director,

OE

bcc w/o enclosure:

H. Smith

J.

Bianchi

J. Zollicoffer

i

REGION

V

or ll

9/2.5/92

S

OP

ES

.

'NO

9/z,g/92

(Para.

10)

9/ZS/92

C

NO

0

ES

NO

YES

P

n

9/Z

2

YE

NO

guRHuey

9/p /92

YES

SRi cbirds

9/gge2

OP

R

S

C

NO

ES

NO

ES

NO

I