C 4
March 19, 1992 Uocket Nos.
50-275 50-323 Mr. James D. Shiffer Senior Vice President and General Manager Nuclear Power Generation Pacific Gas and Electric Company 77 Beale -Street San Francisco, CA 94106
Dear Mr. Shiffer:
The U.S. Nuclear Regulatory Commission (NRC) has reviewed the Emergency
Response
Data System (ERDS) implementation plan which you submitted in a letter dated October 25, 1991.
Based upon this review, the NRC has found that your implementation plan provides the basis for an acceptable implementation of ERDS at your facility.
Be advised that the testing phase of EROS implementation involves all licensees testing with the NRC contractor, Halliburton NUS Environmental Corporation.
Since the contractor does not have unlimited resources for testing multiple ERDS links simultaneously, close coordination with the Halliburton NUS personnel in scheduling your ERDS testing will be a key element in the successful completion of EROS implementation.
The project manager at Halliburton NUS is Mr. Tony LaRosa, and he may be reached at (208) 524-9227.
If you have any questions or problems in implementing the ERDS program, please contact Mr. John Jolicoeur, the NRC EROS project manager, at (301) 492-4155 or your NRR Project Manager.
Sincerely, Original Signed By:
9203200417 920319 I
'DR ADOCK 05000275' cc:
See next page Harry Rood, Project Manager Project Directorate V
Division of Reactor Projects
- III, IV, V, and Special Projects Office of Nuclear Reactor Regulation DISTRIBUTION ELJordan EWWeiss
+DCSj
- JDyer, NRR IR A:AEOD J
olicoeur g/~i /92 ms DFRoss IRB r/f Local PDR SShankman, EDO IRBg@HAEOD F ~b.
~ /g/92 RLSpessard JRJolicoeur NRC PDR
- EGarcia, RV IRB'AEOD EWW
'he/92 pD v r/f g fgfg~
- HRood, NRR D:DO
.AEOD RLSpessard p /lf/92 24 GOO~
k p
~S RE0y (4
P
~4 0
I 0O Cy
+~
gO
+a*++
UNITEDSTATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 March 19, 1992 Docket Nos.
50-275 50-323 Hr. James D. Shiffer Senior Vice President and General Manager Nuclear Power Generation Pacific Gas and Electric Company 77 Beale Street San Francisco, CA 94106
Dear Hr. Shiffer:
The U.S. Nuclear Regulatory Commission (NRC) has reviewed the Emergency
Response
Data System (ERDS) implementation plan which you submitted in a letter dated October 25, 1991.
Based upon this review, the NRC has found that your implementation plan provides the basis for an acceptable implementation of EROS at your facility.
Be advised that the testin'g phase of ERDS implementation involves all licensees testing with the NRC contractor, Halliburton NUS Environmental Corporation.
Since the contractor does not have unlimited resources for testing multiple ERDS links simultaneously, close coordination with the Halliburton NUS personnel in scheduling your ERDS testing will be a key element in the successful completion of ERDS implementation.
The project manager at Halliburton NUS is Hr. Tony LaRosa, and he may be reached at (208) 524-9227.
If you have any questions or problems in implementing the ERDS program, please contact Hr. John Jolicoeur, the NRC ERDS project manager, at (301) 492-4155 or your NRR Project Manager.
Sincerely, cc:
See next page Harry Rood, Project Manager Project Directorate V
Division of Reactor Projects
- III, IV, V, and Special Projects Office of Nuclear Reactor Regulation
V
Mr. Gregory M. Rueger Pacific Gas and Electric Company Diablo Canyon CC:
NRC Resident Inspector Diablo Canyon Nuclear Power Plant c/o U.S. Nuclear Regulatory Commission P. 0.
Box 369 Avila Beach, California 93424 Dr. Richard Ferguson, Energy Chair Sierra Club California 6715 Rocky Canyon Creston, California 93432 Ms. Sandra A. Silver Mothers for Peace 660 Granite Creek Road Santa Cruz, California 95065 Ms. Jacquelyn C. Wheeler 3303 Barranca Court San Luis Obispo, California 93401 Managing Editor The County Telegram Tribune 1321 Johnson Avenue P. 0.
Box 112 San Luis Obispo, California 93406 Chairman San Luis Obispo County Board of Supervisors Room 370 County Government Center San Luis Obispo, California 93408 Mr. John Hickman Senior Health Physicist Environmental Radioactive Mgmt. Unit Environmental Management Branch State Department of Health Services 714 P Street, Room 616 Sacramento, California 95814 Regional Adminstrator, Region V
U.S. Nuclear Regulatory Commission 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 Mr. Peter H.
Kaufman Deputy Attorney General State of California 110 West A Street, Suite 700 San
- Diego, Gal iforni a 92101 Ms. Nancy Culver 192 Luneta Street San Luis Obispo, California 93401 Michael M. Strumwasser, Esq.
Special Assistant Attorney General State of California Department of Justice 3580 Wilshi re Boulevard, Room 800 Los Angeles, California 90010 Richard F. Locke, Esq.
Pacific Gas 8 Electric Company Post Office Box 7442 San Francisco, California 94120
~
p
~