ML16341G328

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-275/91-32 & 50-323/91-32 on 910923-26.No Violations or Deviations Noted
ML16341G328
Person / Time
Site: Diablo Canyon  
Issue date: 10/10/1991
From: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Shiffer J
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16341G329 List:
References
NUDOCS 9110290208
Download: ML16341G328 (6)


See also: IR 05000275/1991032

Text

~p,S llfgy

c+

P0

+c

o

J

I

0

~4

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION V

1450 MARIALANE, SUITE 210

WALNUTCREEK, CALIFORNIA94596 5368

Docket Nos.

50-275

and 50-323

Pacific

Gas

5 Electric Company

77 Beale Street,

Room.

1451

San Francisco,

California 94106

Attention:

Mr. J.

D. Shiffer

Senior Vice President

and General

Manager

Nuclear

Power Generation

Gentlemen

SUBJECT:

NRC Inspection of Diablo Canyon Nuclear

Power Plant

(DCPP)

This refers to the routine inspection

conducted

by Mr. W. J.

Wagner of. this

office on September

23-26,

1991, of activities authorized

by NRC,License

Nos.

, DPR-80 and DPR-82,

and to the discussions

of our findings held with members of

your staff at the conclusion of the inspection.

Areas

examined during this inspection

are described

in the enclosed

inspection

report.

Within these

areas,

the inspection consisted. of selective

examinations, of procedures

and representative

records,

interviews with

, personnel,

and observations

by the inspector.

No. violations or deviations

were identified within the scope of this

inspection.

In accordance

with 10 CFR 2.790(a),

a copy of this letter and the enclosure

will be placed in the

NRC Public Document

Room.

Should you have

any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

Sincerely,

~

~

~

.

F. Kirsch, Chief

Reactor Safety Branch

Enclosure:

Inspection

Report Nos. 50-275/91-32

and 50-323/91-32

110290208

911010

PDR

ADOCK 05000275

8

PDR

'

1

cc w/enclosure:

J.

A. Sexton,

PGFE

J.

D. Townsend,

Vice President/Plant

Manager,

PGSE

R.

F. Locke, Esq.,

PGIWE

D. A. Taggart, Director, guality Support,

PGIKE'.

Thomas,

News Services,

PGSE

T. L. Grebel,

Regulatory Compliance Supervisor,

PGIIE

State of California (Gordon

K. Van Vleck)

Bob Hendrix, County Administrator

Sandra Silver

( report only)

-3-

bcc w/enclosure:

Project Inspector

" Resident

Inspector

Docket Fi'le

G.

Cook

B. Faulkenberry

J. Martin

R.

Zimmerman

bcc w/o

nc osure: P&(~

WJWagner

Pl corri 1 l

(0 / 2 /91

(0 / 2 /91

I

FRHuey

DKirsch

l0 / (

/91

0//0 /91

ST

C

PY

R QUEST

PY

R

ST

C

PY

REQUES

]

YES

HO

YES.

CHO

YES

HO

Y

HO

S 'O

PDR

YES

NO

k