ML16341G203
| ML16341G203 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 07/26/1991 |
| From: | Rood H Office of Nuclear Reactor Regulation |
| To: | Kempton K SAN LUIS OBISPO COUNTY, CA |
| References | |
| NUDOCS 9108010202 | |
| Download: ML16341G203 (4) | |
Text
Ci) g Mr. karl Kempton Energy Division Department of Planning and Building San Luis Obispo County City Government Center San Luis Obispo, CA 93408
Dear Mr. Kempton:
July 26, 1991 In your letter to the NRC dated October 1, 1990, you requested that we send you a copy of the draft USGS report on the Diablo Canyon seismic re-evaluation program.
In our response of November 7, 1990, we indicated that a team of NRC staff experts was conducting the overall review of the PG&E's Long-Term Seismic Program (LTSP),
and that a number of consultants, including the U.S.
Geological
- Survey, had been retained by the NRC to assist in the review.
In our letter we stated that Agency policy precludes release of draft material, but we promised to send you a copy of the NRC staff's safety evaluation report on the LTSP when issued.
The staff 's safety evaluation report on the LTSP has recently been issued, and a copy is enclosed.
As we indicated in our November 7, 1990 letter, the USGS report on its review of the LTSP geological and geophysical interpretations is included as Appendix C of the safety evaluation report.
I hope that the enclosed safety evaluation report is of use to you in evaluating the seismic characteristics off the coast of San Luis Obispo County.
Sin cere ly,
Enclosure:
As stated
.ORIGINAL SIGNED BY Harry Rood, Senior Project Manager Project Directorate V
Division of Reactor Projects III/IV/V Office of Nuclear Reactor Regulation
/
Docket File/
OGC NRC 8( LPDR EJordan PD5 Pl ant File ACRS (10)
RCesaro PD5 Reading File HRood RZimmerman, RV JDyer PMorrill, RV MVirgilio
- GCook, RV BBoger
,RRothman OFC DRPW D5: PM DRPW/PD5: LA NAME HRood RCesaro~
DATE 07/25/91 07/4/91 DRPW/PD5:D JDyer ~
07/)@91 OFFICIAL RECORD COPY Document Name:
SSER34 COPY TO KEMPTON IICfez gpggg qg 9i08020202 910726 PDR"'DOCK 05000275 H"'DR
Mli V
IIII<<1 1 <<r
.M
$. I Itl
~'I'll,t,
. IMN.
~ I
~ <<
'I
. I, N
.'l '
fj 1,,>> pl< ~
r
~ '
I
>><<."VI<<<
'4 t
I
. Ii r,t
~
ll Chr>>>>
I '. ~
I
'tt N
Mt".Ct
~
M L<<M,
I
~ ll 0 If, tt Mt Ml e
pl fl 4 Mv>>,'I
~,
N il >>,N.C I
l.
N l I 0 h
ll I
N, v
MM N
N
'I -
il PMM>>t
) f.J 4i'P'>>C
MN
.PV 4
it 4
1 ii I,>>
'1
.N
'C
>>1 ll NN>>r 4
,,4
'I
'.li
~ N I'i
"'f If ~
4 r
il M
1 I
't f 'I 11
~
N It It
'I I
1
~ps AEC(
g
~
w P Wp0
~o%:
'>>>>**<<'r.
Karl Kempton Energy Division Department of Planning and Building San Luis Obispo County City Government Center San Luis Obispo, CA 93408 Gl 0 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555 July 26, 1991
Dear Mr. Kempton:
In your letter to the NRC dated October 1, 1990, you requested that we send you a copy of the draft USGS report on the Diablo Canyon seismic re-evaluation program.
In our response of November 7, 1990, we indicated that a team of NRC staff experts was conducting the overall review of the PG&E's Long-Term Seismic Program (LTSP), and that a number of consultants, including the U.S.
Geological
- Survey, had been retained by the NRC to assist in the review.
In our letter we stated that Agency policy precludes release of draft material, but we promised to send you a copy of the NRC staff's safety evaluation report on the LTSP when issued.
The staff's safety evaluation report on the LTSP has recently been issued, and a,copy is enclosed.
As we indicated in our November 7, 1990 letter, the USGS report on its review of the LTSP geological and geophysical interpretations is included as Appendix C of the safety evaluation report.
I hope that the enclosed safety evaluation report is of use to you in evaluating the seismic characteristics off the coast of San Luis Obispo County.
S incerely,
Enclosure:
As stated Harry Roo, Senior Project Manager Project Directorate V
Division of Reactor Projects III/IV/V Office of Nuclear Reactor Regulation
~ ~
1 C 1 I y 1
v r
1 I'
)
l
(