Forwards Insp Repts 50-275/90-22 & 50-323/90-22 on 901002-05.No Deficiencies or Violations Noted
ML16341F890
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 11/14/1990
From: Yuhas G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Shiffer J
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16341F891 List:
References
NUDOCS 9012030020
Download: ML16341F890 (6)


See also: IR 05000275/1990022

Text

~

+p,S REQy,

(4

Cqp

~4

0

Cy

I

.

~

,4

cA

'I

I

+a*+>>

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGIDN V

1450 MARIALANE,SUITE 210

WALNUTCREEK, CALIFORNIA94596

goy 14

Ls90

Docket Nos.

50-275 and 50-323

Pacific Gas

and Electric Company

77 Beale Street,

Room 1451

San Francisco,

Cali fornia

94106

Attention:

Mr. J.

D. Shiffer, Senior Vice President

Nuclear Power Generation

Business

Unit

Gentlemen:

SUBJECT:

NRC INSPECTION

This letter refers to the inspection

conducted

by Ms.

G.

M. Good,

Team Leader,

and other

NRC team members of this office on October 2-5, 1990, of activities

authorized

by NRC License

Nos.

DPR-80 and DPR-82,

and to the discussion of our

findings held by Ms.

Good with Mr. J.

D. Townsend

and other

members of your

staff at the conclusion of the inspection.

Areas examined during this inspection are described in the enclosed

inspection

report.

Within these

areas',

the inspection consisted of selective

examinations of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspectors.

No deficiencies

or violations of NRC requirements

were identified within the

scope of this inspection;

however,

one exercise

weakness

was identified.

The

exercise

weakness

is discussed

in Section

6 of the attached

report.

The

inspection findings indicate

a need for you to examine the effectivene'ss

of

your corrective action program to prevent issues

from recurring.

Sections

2,

6,

7 and

9 of the attached

report describe five issues that were identified

during previous

NRC inspections.

In accordance

with 10 CFR 2.790(a),

a copy. of this letter and the enclosure

will be placed in the

NRC Public Document

Room.

Should you have

any questions

concerning this inspection,

we will be glad to

discuss

them with you.

Sincerely,

4kc8kP Ag~ ~w

G.

P.

Yuhas, Chief

Reactor Radiological Protection

Branch

Enclosure:

Inspection

Report

Nos. 50-275/90-22

and 50-323/90-22

90i, 20300-0

901 1 i4

PDR

ADOCI< 0.= 000275

IV

PDI

~

'

cc w/enclosure:

J.

A. Sexton,

PG8E

J.

D. Townsend,

PG&E, Diablo Canyon

R.

F.

Locke,

PG8 E

D. A. Taggart,

PG8E, Diablo Canyon

B. Thomas,

PG8E, Diablo Canyon

T.

L. Grebel,

PG8E, Diablo Canyon

State of California

Sandra Silver (Report Only)

J.

Dominguez,

FEMA, Region IX

e

-3"

NOV i 4

1OOD

bcc w/enclosure:

H.

Rood,

NRR/PD5

R. Erickson,

NRR,

PEPB

Project Inspector

Resident Inspector

G.

Cook

B. Faulkenberry

J.'artin

bcc w/o enclosure:

M. Smith

J. Zollicoffer

REG/ON V/dot

gyAQ-

GGocA( D

KPrendergast

PQballs

ll/h+/90

ll/)y/90

11/(q /90

c~~~

VEST

COPY

REQUES

CP

Y

EST

OP

YES /

NO

] YES /

NO

]

ES /

NO

GPYuhas ~+~

11/~g/9o +F,~

EST

COPY

ES /

NO

]

ES /

NO

]

l'