Forwards Insp Repts 50-275/90-19 & 50-323/90-19 on 900722- 0901.No Violations Noted.Mgt Meeting Will Be Scheduled
ML16341F841
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 09/24/1990
From: Zimmerman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Shiffer J
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16341F842 List:
References
NUDOCS 9010150179
Download: ML16341F841 (8)


See also: IR 05000275/1990019

Text

ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEM

I

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

SSION NBR:9010150179

DOC.DATE: 90/09/24

NOTARIZED: NO

DOCKET

ACIL:50-275 Diablo Canyon Nuclear Power Plant, Unit 1, Pacific

Ga

05000275

50-323 Diablo Canyon Nuclear Power Plant, Unit 2, Pacific

Ga

05000323

AUTH.NAME

AUTHOR AFFILIATION

ZIMMERMAN,R.P.

Region

5 (Post

820201)

RECIP.NAME

RECIPIENT AFFILIATION

SHIFFER,J.D.

Pacific Gas

& Electric Co.

SUBJECT:

Forwards Insp Repts 50-275/90-19

6 50-323/90-19

on 900722-

0901.No violations noted.Mgt meeting will be scheduled.

DISTRIBUTION CODE:

IEOID

COPIES

RECEIVED: LTR g ENCL /

SIZE: ++ I ~

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

NOTES:

D

INTERNAL:

RECIPIENT

ID CODE/NAME

PD5

PD

ACRS

AEOD/DEIIB

DEDRO

NRR SHANKMAN,S

NRR/DOEA DIR 11

NRR/DRIS/DIR

NRR/PMAS/ILRB12

E DKR

REG

F

02

COPIES

LTTR ENCL

1

1

2

2

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

ROOD,H

AEOD

AEOD/TPAD

NRR MORISSEAUgD

NRR/DLPQ/LPEB10

NRR/DREP/PEPB9D

NRR/DST/DIR 8E2

NUDOCS-ABSTRACT

OGC/HDS2

RGN5

FILE

01

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

A

.D

D

EXTERNAL: NRC PDR

1

1

NSIC

1

1

D

NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK,

ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION

LISTS FOR DOCUMENTS YOU DON'T NEED!

AL NUMBER OF COPIES

REQUIRED:,LTTR

23

ENCL

23

A

D

D

~

'

~g% REay,

(4

Mp0

t

Oc

.'

Cy

++*sr+

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION V

1460 MARIALANE, SUITE 210

WALNUTCREEK, CALIFORNIA846964368

SEP

2 4

1990

Docket Nos.

50-275

and 50-323

Pacific Gas

and Electric Company

77 Beale Street,

Room 1451

San Francisco, California 94106

Attention:

Mr. J.

D. Shiffer, Senior Vice President

Nuclear

Power Generation

Business Unit

Gentl emen:

Subject:

NRC Inspection of Diablo Canyon Units 1 and

2

This refers to the routine inspection conducted

by Messrs.

P.

P. Narbut and

K.

E. Johnston

during the period of July 22 through September

1, 1990.

Mr. L.

E.

Whitney of the

NRC Office of Nuclear Reactor Regulation also participated in

the inspection during the period.

This inspection

examined your activities

as

authorized

by

NRC License

Nos.

DPR-80 and DPR-82.

At the conclusion of the

inspection,

discussions

of their findings were held with Mr. J.

D. Townsend,

and other members of your staff.

Areas

examined during this inspection

are described in the enclosed

inspection

report.

Within these

areas,

the inspection consisted of selective

examinations of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspectors.

No violations of NRC requirements

were identified as

a result of this

inspection.

However, your attention is directed to paragraph

4 of the

enclosed report, which discusses

several

occurrences

where your identification

of problems

was slow, or where given that a problem was

known to your

organization,

the efforts to address

known deficiencies

were either lacking in

scope

or lacking appropriate coordination.

Examples

include not adequately

dealing with numerous past weld failures apparently

caused

by the operation of

the positive displacement

charging

pumps,

and the failure of a reactor coolant

pump motor heater,

which could have

been avoided based

on the information

available to your staff.

Although none of 'the instances

discussed

in the

enclosed report resulted in a significant safety problem,

we are concerned in

that similar issues

were identifsed in inspection reports 50-275/90-13

and

50-275/90-08.

We intend to discuss this area with you during a future

management

meeting.

In accordance

with 10 CFR 2.790 (a),

a copy of this letter and the enclosure

will be placed in the

NRC Public Document

Room.

A laMB I

90101

0179 900924

PDR

ADQCK 05000275

9

PDC

~

'

-2-

SLP

2 4 19M

Should you have

any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

Sincerely,

i

F'oP-

R.

P.

Zimmerman, Director

Division of Reactor Safety

and

Projects

Enclosure:

Inspection Report Nos. 50-275/90-19

and 50-323/90-19

cc w/enclosure:

J.

A. Sexton,

PG&E

R.

F.

Locke,

PG&E

J.

D. Townsend,

PG&E (Diablo Canyon)

D.

A. Taggert,

PG&E (Diablo Canyon)

T.

L. Grebel,

PG&E (Diablo Canyon)

R. Weinberg,

News Services,

PG&E

State of California

Sandra Silver (Report Only)

SEP

2 4

1S90

bcc w/encl osure:

Project Inspector

Resident Inspector

docket file

G.

Cook

B. Faulkenberry

J. Martin

R. Barr, SRI, Trojan

bcc w/o enclosure:

M. Smith

J. Zollicoffer

N. Nestern

gs

REGION $/Let

P]r

PPNarbut

KEJohnston

9/>u'9O

9/i>/go

PJ orrill

9/i>/go

EST

COPY

EST

COPY

REQUEST

E

/

NO

]

ES /

NO

] YES /

N

SARichards

pl/f/90

Y

EST

COPY

]

ES /

NO

j

YES /

NO

]