Text
ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEM
I
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
SSION NBR:9010150179
DOC.DATE: 90/09/24
NOTARIZED: NO
DOCKET
ACIL:50-275 Diablo Canyon Nuclear Power Plant, Unit 1, Pacific
Ga
05000275
50-323 Diablo Canyon Nuclear Power Plant, Unit 2, Pacific
Ga
05000323
AUTH.NAME
AUTHOR AFFILIATION
ZIMMERMAN,R.P.
Region
5 (Post
820201)
RECIP.NAME
RECIPIENT AFFILIATION
SHIFFER,J.D.
Pacific Gas
& Electric Co.
SUBJECT:
Forwards Insp Repts 50-275/90-19
6 50-323/90-19
on 900722-
0901.No violations noted.Mgt meeting will be scheduled.
DISTRIBUTION CODE:
IEOID
COPIES
RECEIVED: LTR g ENCL /
SIZE: ++ I ~
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:
D
INTERNAL:
RECIPIENT
ID CODE/NAME
PD5
AEOD/DEIIB
DEDRO
NRR SHANKMAN,S
NRR/DOEA DIR 11
NRR/DRIS/DIR
NRR/PMAS/ILRB12
E DKR
REG
F
02
COPIES
LTTR ENCL
1
1
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
ROOD,H
AEOD/TPAD
NRR MORISSEAUgD
NRR/DLPQ/LPEB10
NRR/DREP/PEPB9D
NRR/DST/DIR 8E2
NUDOCS-ABSTRACT
OGC/HDS2
RGN5
FILE
01
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
A
.D
D
EXTERNAL: NRC PDR
1
1
1
1
D
NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK,
ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION
LISTS FOR DOCUMENTS YOU DON'T NEED!
AL NUMBER OF COPIES
REQUIRED:,LTTR
23
ENCL
23
A
D
D
~
'
~g% REay,
(4
Mp0
t
Oc
.'
Cy
++*sr+
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION V
1460 MARIALANE, SUITE 210
WALNUTCREEK, CALIFORNIA846964368
2 4
1990
Docket Nos.
50-275
and 50-323
Pacific Gas
and Electric Company
77 Beale Street,
Room 1451
San Francisco, California 94106
Attention:
Mr. J.
D. Shiffer, Senior Vice President
Nuclear
Power Generation
Business Unit
Gentl emen:
Subject:
NRC Inspection of Diablo Canyon Units 1 and
2
This refers to the routine inspection conducted
by Messrs.
P.
P. Narbut and
K.
E. Johnston
during the period of July 22 through September
1, 1990.
Mr. L.
E.
Whitney of the
NRC Office of Nuclear Reactor Regulation also participated in
the inspection during the period.
This inspection
examined your activities
as
authorized
by
NRC License
Nos.
At the conclusion of the
inspection,
discussions
of their findings were held with Mr. J.
D. Townsend,
and other members of your staff.
Areas
examined during this inspection
are described in the enclosed
inspection
report.
Within these
areas,
the inspection consisted of selective
examinations of procedures
and representative
records,
interviews with
personnel,
and observations
by the inspectors.
No violations of NRC requirements
were identified as
a result of this
inspection.
However, your attention is directed to paragraph
4 of the
enclosed report, which discusses
several
occurrences
where your identification
of problems
was slow, or where given that a problem was
known to your
organization,
the efforts to address
known deficiencies
were either lacking in
scope
or lacking appropriate coordination.
Examples
include not adequately
dealing with numerous past weld failures apparently
caused
by the operation of
the positive displacement
charging
pumps,
and the failure of a reactor coolant
pump motor heater,
which could have
been avoided based
on the information
available to your staff.
Although none of 'the instances
discussed
in the
enclosed report resulted in a significant safety problem,
we are concerned in
that similar issues
were identifsed in inspection reports 50-275/90-13
and
50-275/90-08.
We intend to discuss this area with you during a future
management
meeting.
In accordance
with 10 CFR 2.790 (a),
a copy of this letter and the enclosure
will be placed in the
NRC Public Document
Room.
A laMB I
90101
0179 900924
ADQCK 05000275
9
~
'
-2-
SLP
2 4 19M
Should you have
any questions
concerning this inspection,
we will be pleased
to discuss
them with you.
Sincerely,
i
F'oP-
R.
P.
Zimmerman, Director
Division of Reactor Safety
and
Projects
Enclosure:
Inspection Report Nos. 50-275/90-19
and 50-323/90-19
cc w/enclosure:
J.
A. Sexton,
R.
F.
Locke,
J.
D. Townsend,
PG&E (Diablo Canyon)
D.
A. Taggert,
PG&E (Diablo Canyon)
T.
L. Grebel,
PG&E (Diablo Canyon)
R. Weinberg,
News Services,
State of California
Sandra Silver (Report Only)
2 4
1S90
bcc w/encl osure:
Project Inspector
Resident Inspector
docket file
G.
Cook
B. Faulkenberry
J. Martin
R. Barr, SRI, Trojan
bcc w/o enclosure:
M. Smith
J. Zollicoffer
N. Nestern
gs
REGION $/Let
P]r
PPNarbut
KEJohnston
9/>u'9O
9/i>/go
PJ orrill
9/i>/go
EST
COPY
EST
COPY
REQUEST
E
/
NO
]
ES /
NO
] YES /
N
SARichards
pl/f/90
Y
EST
COPY
]
ES /
NO
j
YES /
NO
]