ML16341F836

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-275/90-18 & 50-323/90-18 on 900730-0817.No Violations Noted
ML16341F836
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 09/20/1990
From: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Shiffer J
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16341F837 List:
References
NUDOCS 9010110214
Download: ML16341F836 (6)


See also: IR 05000275/1990018

Text

~gR REGS

c<

+~

"

0

Ei

~i

i~

0o

C

I

gO

+a*++

UNITED STATES

NUCLEAR REGULATORY COMIVIISSION

REGION V

1460 MARIALANE, SUITE 210

WALNUTCREEK, CALIFORNIA94696-6368

SEP

2 0

1990

Docket Nos. 50-275

and 50-323

Pacific Gas

and Electric Company

77 Beale Street,

Room 1451

San Francisco,

Cali fornia

94106

Attention:

Hr. J.

D. Shiffer, Senior Vice President

Nuclear Power Generation

Business

Unit

Gentlemen:

SUBJECT:

NRC Inspection of Diablo Canyon Nuclear Power Plant

(DCPP)

This refers to the inspection

conducted

by Messrs.

F.

Huey,

B. Olson,

M. Wagner,

D. Proulx,

and

S.

de Haas of this office from July 30,

1990 through

August 17, 1990, of activities authorized

by NRC License

Nos.

DPR-80 and

DPR-82 and to the discussions

of our findings held with members of your staff

on August 17, 1990.

Areas examined during this inspection are described in the enclosed

inspection

report.

Within these

areas,

the inspection consisted of selective

examinations of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspectors.

No violations of NRC requirements

were identified as

a result of this

inspection.

In accordance

with 10 CFR 2.790(a),

a copy of this letter and the enclosures

will be placed in the

NRC Public Document

Room.

Should you have any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

Sincerely,

D.

F. Kirsch, Chief

Reactor Safety Branch

Enclosure:

Inspection Report Nos. 50-275/90-18

and 50-323/90-18

9010110214

900920

PDR

ADQCK 05000275

G

PNU

4

0

'

-2-

1

cc w/enclosure:

J.

A. Sexton,

PGLE

J.

D. Townsend,

PGBE (Diablo Canyon)

R.

F.

Locke,

PG8 E

D.;A. Taggart,

,

PGIIE (Diablo Canyon)

  • R; steinberg,

News Services,

PGKE (Diab'lo Canyon)

T.

L. Grebel,

,

PG&E (Diablo Canyon)

State of CA (Gordon

K. Van Vleck)

Sandra Silver (report only)

SEI

-'

193

0

bcc w/enclosure:

Project Inspector

Resident

Inspector

docket file

G.

Cook

B. Faulkenberry

J. Martin

bcc w/o enclosure:

N. Mestern

J. Zollicoffer

M. Smith

REGION V/d 0)

WWagner pj

/O'O1aon;;S'/ig'90

9/('- /90

DProulx Aw

SdeHaas

- 4L

RHu

'i'/9O

P"-

9i/isi/9~

9/tYi9O

VEST

COPY

REQUEST

CORY

REQUEST

CO

Y

R

VEST

COPY

R

UEST

COPY

YES /

NO

] YES /

NO.

] YES /

]~YES )/

NO

]

S /

NO

]

PMorril

9/8/9O

9~%0

0

YES /

NO

] YES /

NO

]

YES /

NO

]