Forwards Insp Repts 50-275/90-08 & 50-323/90-08 on 900311-0421 & Notice of Violation.Violation Failed to Evaluate & Correct Problem Identified W/Auxilary Feedwater Sys Check Valve During Second Refueling Outage of Unit
ML16341F727
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 05/24/1990
From: Richards S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Shiffer J
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16341F728 List:
References
NUDOCS 9006120011
Download: ML16341F727 (6)


See also: IR 05000275/1990008

Text

lÃAY 2 4

]ggg

Docket Nos.

50-275

and 50-323

Pacific

Gas

and Electric Company

77 Beale Street,

Room 1451

San Francisco,

California 94106

Attention:

Mr. J.

D. Shiffer, Senior Vice President

and General

Manager

Nuclear

Power Generation

Gentlemen:-

Subject:

NRC Inspection of Diablo Canyon Units 1 and

2

This refers to the routine inspection

conducted

by Messrs,

P.

P.

Narbut and

K.

E. Johnston

during the period of March 11 through April 21,

1990.

This

inspection

examined your activities

as authorized

by

NRC License

Nos.

DPR-80

and

DPR-82.

At the conclusion of the inspection,

discussions

of their

findings were held with Mr. J.

D.

Townsend

and other members of your staff.

Areas

examined during this inspection

are described

in the enclosed

inspection

report.

Within these

areas,

the inspection consisted of selective

examinations

of procedures

and representative

records,'nterviews

with

person"el,

and observations, by the inspectors.

Based

on the results of this inspection, it appears

that one of your

activities was not conducted

in full compliance with NRC requirements,

as set

forth in the Notice of Violation, enclosed

herewith as Appendix A.

Your

response

to this notice is to be submitted in accordance

with the provisions

of 10 CFR 2.201

as stated

in Appendix A, Notice of Violation.

The enclosed

report describes

several

occurrences

where the significance or

scope of applicability of technical

issues

were apparently

not fully thought

out initially.

Examples include:

Failure to maintain the Fuel Handling Building Ventilation System barrier

doors closed

such that the system could establish

the required negative

pressure.

Engineering

reviews in 1989 recognized

the need to control the

system barrier, but then only considered

a limited number of openings in

the barrier.

Improper blowdown settings of several relief valves,

which were

identified during the Unit 1 outage in October to December,

1989, yet the

full extent of the issue

as it applied to other relief valves in the

plant was not determined until March,

1990.

Failure to evaluate .and correct

a problem identified with an Auxiliary

Feedwater

System

check valve during the second refueling outage of Unit

2.

During the third refueling outage,

the valve was found stuck open

during maintenance,

and then the problem subsequently

was fully

addressed.

Excessive

leakage

past three Unit 2 Residual

Heat

Removal

valves not

being fully assessed

when discovered

during the outage

and not being

promptly brought to the attention of management.

Problems with the operation of the Fuel Handling Building Brid~e Crane

during the Unit 2 outage,

which were not brought to management

s

attention

and were addressed

in a weakly coordinated

manner.

Although none of the above

examples

resulted in a significant safety issue,

these

examples

indicate that plant problems

are not always being fully and

promptly assessed.

- In accordance

with 10 CFR 2.790 (a),

a copy of this letter and the enclosures

will be placed in the

NRC Public Document

Room.

The responses

directed

by this letter are not subject to the clearance

procedures

of the Office of Management

and Budget as required

by the Paperwork

Reduction Act of 1980,

PL 96-511.

Should you have

any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

Sincerely,

S.

A. Richards,

Chief

Reactor Projects

Branch

Enclosures:

1.

Appendix A, Notice of Violation

2

~

Inspection

Report

Nos.

50-275/90-08

and 50-323/90-08

cc w/enclosure:

J.

A. Sexton,

PG8:E

R.

F.

Locke,

PGLE

J.

D. Townsend,

PG8E (Diablo Canyon)

D.

A. Taggert,

PGEE (Diablo Canyon)

.

News Services,

PG8E

'T.

L. Grebel,

PG&E (Diablo. Canyon)

State of California

Sandra Silver (Report Only)

MAY? <

1ggg

bcc w/enclosure:

docket file

Project Inspector

Resident

Inspector

G.

Cook

A. Chaffee

R.

Zimmerman

B. Faulkenberry

J. Martin

bcc w/o enclosure

2:

M. Smith

J. Zollicoffer

N. Mestern

REGION V/dot

KJohnston

PNarbut

5/></$0+

5/x'I/9P ~

MMMendonca

AJ

nson

5ivt/9

/Sf/90

SARichards

5/>0/9O

n

YES /

NO

YES /

NO

]

ES /

NO

] YES /

0

]

ES

NO

]

%00 M

46o~. r4aho~

W4~ a:c.4

J

/

NO

]

0