ML16341F495
| ML16341F495 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 12/28/1989 |
| From: | Chaffee A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Shiffer J PACIFIC GAS & ELECTRIC CO. |
| References | |
| NUDOCS 9001090146 | |
| Download: ML16341F495 (2) | |
Text
ACCELERATED DISTBJBUTION DEMONSTFNTION SYSTEM 0,
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9001090146 DOC.DATE: 89/12/28 NOTARIZED: NO DOCKET g
FACIL:50-275 Diablo Canyon Nuclear Power Plant, Unit 1, Pacific Ga 05000275 50-323 Diablo Canyon Nuclear Power Plant, Unit 2, Pacific Ga 05000323 AUTH.NAME AUTHOR AFFILIATION CHAFFEE,A.E.
Region 5, Ofc of the Director RECIP.NAME RECIPIENT AFFILIATION SHIFFER,J.D..
Pacific Gas
& Electric Co.
SUBJECT:
Encourages submission of change to QAP per 10CFR50.54(3),if Sexton appointed QA manager.
DISTRIBUTION CODE:
IE01D COPIES RECEIVED:LTR ENC~Q SIZE:
TITLE: General (50 Dkt)-Insp Rept/Notice of Vio ation es onse NOTES:
RECIPIENT ID CODE/NAME PD5 PD INTERNAL: ACRS AEOD/DEIIB DEDRO NRR/DLPQ/LPEB10 NRR/DREP/PEPB9D NRR/DRIS/DIR NRR/PMAS/ILRB1 2 OE E
N,J E
RGN5 FILE 01" EXTERNAL: LPDR NSIC COPIES LTTR ENCL 2
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME ROOD,H AEOD AEOD/TPAD NRR SHANKMAN,S NRR/DOEA DIR 11 NRR/DREP/PRPB11 NRR/DST/DIR 8E2 NUDOCS-ABSTRACT OGC/HDS2 RES MORISSEAU,D NRC PDR COPIES LTTR ENCL 1
1 NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM PI-37 (EXT. 20079) TO ELIMINATEYOUR NAMEFROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED)
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 26 ENCL
Pacific Gal-and Electric Company 77 Beale Street San Francisco, Calf fornfa 94106
()EC 2 8 fggg P.!z i I
Attention:
Mr. James O. Shfffer, Vice President Nuclear Power Generation
Subject:
gualfty Assurance Program Description for Diablo Canyon In that Hr. Sexton does not have one year of f)ualfty Assurance experience gained within the f)A organization, it appears that his selection would not,be consistent with your f)A program requfrements.
Thus, ff you wfsh to appoint Mr. Sexton as Oualfty Assurance
- Manager, we would encourage you to submft a
change to your quality Assurance
- program, in accordance with 10 CFR 50.54a(3).
Upon receipt of your submittal, the NRC will review the acceptability of thfs change and so advise you of our determination.
Should you have any questions regarding this request or if we can provide assfstance",
please contact W. J.
Wagner at (415) 943-3731.
Sincerely, p<( g,//~
A. E.
Ch ffee, Deputy Director Division of Reactor Safety and Projects bcc:
Docket File Resident Inspector Project Inspector G. Cook B. Faulkenberry J. Martin H. Smith CC:
J.
G. Spraul, f)AB H. Rood, NRR B. H. Vogler, OGC P.
P. Harbut, RV R. Zfmnerman,- RV S. Rfchards, RV H. Mendonca, RV D. Kfrsch, RV R. Huey, RV RSB/Document Control Desk (RIDS)
CONCURREHCES:
WWag r
MHend ca/nw AChaffee 12/
/89 12/
/89 12/
/89 We have reviewed your letter dated December 5, 1989, to Hr. J.
B. Martin from Hr.
G. A. Haneatfs requestfng our concurrence in your selection of Mr. Sexton as f)ualfty Assurance Hanager.
The request involves a change to one of your f)ualfty Assurance program requiremerits, [i.e.
FSAR page 17.1-6,. dated September 1988, Revision 4, states in part:
"At the time of
.... assignment to the active position, the Manager, Oualfty Assurance, shall have six years experience fn the field of qualfty assurance....
At least one of these sfx years of experfence shall be nuclear power plant experience in the overall" implementation of the OA Program.
(This experience shall be obtained under the f)A organization)."3 ES /
NO ES NO YES /
NO YES /
HO YES /
NO c~
C>>
CC'.
G. Spraul, OAB H. Rood, NRR 8, H. Vogler',
OGC P.
P. Narbut, RV Section Chiefs Branch Chiefs RSB/Document Control Desk CONCURRENCES:
WWagner gs MMendonca/nw 12/x $/89 12/g7/89
($r>!
AChaffee-12/g()/89 ill<<
YES ~HO QA',(" >s u/u<l~'i
(</zdf)ag i'/rc,
~Y)'h ~~
89~ '+~
Y U
Y OU ES /
NO ES HO YES /
NO 1
YES HO YES NO
>Qpipf 5ppp275 6!PI228 pDp ADQCK
'Q pDC P
YES /
HO w~g t