Text
gCCELEWTEP QSTRIBU'EON
DEMONSTRA'TION
SYSTEM
ACCESSION NBR:9001050182
DOC.DATE: 89/12/14
NOTARIZED: NO
DOCKET
CIL:50-275 Diablo Canyon Nuclear
Power Plant, Unit 1, Pacific
Ga
05000275
~
~
50-323 Diablo Canyon Nuclear
Power Plant, Unit 2, Pacific
Ga
05000323
AUTH.NAME
AUTHOR AFFILIATION
ZIMMERMAN,R.P.
Region
5, Ofc of the Director
RECIP.NAME
RECIPIENT AFFILIATION
SHIFFER,J.D.
Pacific Gas
& Electric Co.
SUBJECT:
Forwards
Insp Repts
50-275/89-29
& 50-323/89-29
on
891120-22.Violations
noted.
DISTRIBUTION CODE:
IE42D
COPIES
RECEIVED:LTR L ENCL L
SIZE
TITLE: Operator Licensing Examination Reports
NOTES:
RECIPIENT
ID CODE/NAME
PD5
INTERNAL: ACRS
NRR SHANKMANiS
N
LP=
LOLB10
F LE
02
EXTERNAL: LPDR,
COPIES
LTTR ENCL
1
1
2,
2
'1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
ROODPH
AEOD/DSP/TPAB
NRR/DLPQ/LHFBll
NUDOCS-ABSTRACT
RGN5
FILE
Ol
NRC
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
R
I
D
S
NAZE IO ALL "RIDS" RECIP~:
PIZASE HELP US IO REDOCE HASTE
CGHIACT IHE DOCUMEÃZ CONTROL DESKS
RDCN Pl-37
(EÃZ. 20079)
'IO IKZMI2QZB K%K NAME FBCH DIPHGBUTIQN
LISTS Pcja DOCUMERIS YOU DOHiT NEEDf
h
D
D
S
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
14
ENCL
14
Docket Nos.
50-275
50-323
EA 89-240
Pacific
Gas
and Electric
Company
77 Beale Street,
Room
1451
San Francisco,
California 94106
Attention:
J.
D. Shiffer, Vice President
Nuclear
Power Generation
Dear Sir or Madam:
Subject:
NRC Inspection
This refers to the inspection
conducted
by Mr. L. F. Miller, Jr. of this
office on November 20-22,
1989 of activities authorized
by
NRC Operating
Licenses
DPR-80 and 82,
and to the discussion of the findings of the
inspection
held with Mr. J.
Townsend
and other members of his staff at the
conclusion of the inspection.
This was
a special,
announced
inspection to review how Pacific
Gas
and
Electric had staffed the Shift Supervisor position at Diablo Canyon Units
1
and 2.
In particular,
the apparent
assignment
of an unlicensed
person
to this
position from September
1,
1988 to January 6,
1989
was reviewed.
'Within this
area,
the inspection consisted
of selective
examinations
of procedures
and
representative
records,
interviews with personnel
and observations
by the
inspector.
The inspection
determined that
PGImE had apparently
not assigned
a senior licensed
person to be onsite at all times in overall plant control, from initial
licensing in April 1985 until the continuous
manning of the Shift Supervisor
position in January
1988.
(However, it is recognized that the required total
numbers of licensed
operators
and senior operators
were stationed at all times.)
The inspection
determined further that the position of Shift Supervisor,
formally created
in October
1987 at Diablo Canyon,
had authority to direct
licensed operators
on shift, and, therefore,
apparently
should
have
been
a
senior licensed position.
Finally, the inspection
concluded that from
September
1,
1988 to January
6,
1989,
an improper exception to your manning
practices
was
made to permit
an unlicensed
person
to assume
the senior licensed
responsibility of the Shift Supervisor.
Enforcement action associated
with the findings of this inspection will be
the subject of separate
correspondence.
An enforcement
conference
to review
this occurrence
and any additional'nformation or explanation
which you can
provide is scheduled
for December
19,
1989 at 9:00 a.m.
in the Region
V offices.
900>050~8
89~
r4
ADOC)( 050002?5
J.
D. Shiffer
0EC1og
In accordance
with 10 CFR 2.790(a)
a copy of this letter, will be placed
in-
the
NRC Public Document
Room.
Enclosure
2 will be withheld as per'sonal
privacy information (10 CFR 2.790(a)(6));
Should you have
any questions
concerning this inspection,
we will be pleased
to discuss
them with you.
Sincerely,
Roy P.
Z>mmerman, Director
Division of Reactor Safety
and Projects
Enclosures:
(1)
Inspection
Repor t
Nos.
50-275/89-29,
50-323/89-29
(2)
Addendum (Identification of Persons
Involved)
cc w/enclosures
(1) and (2):
K. Perkins,
J. Zwolinski,
F. Allenspach,,
J.
D.
Townsend,
PGRE (Diablo Canyon)
cc w/enclosure
(1):
State of .Cal ifor ni a
T. Martin,
PG8E Training
S.
A. Sexton,
PGLE
R.
F.
Locke,
PG8;E
D.
A. Taggert,
PGKE (Diablo Canyon)
T.
L. Grebel,
PGE:E (Diablo Canyon)
bcc w/enclosures
(1) and (2):
8. Faulkenberry
J. Martin
J.
Lieberman
(QE)
bcc w/enclosure
(1) only:
docket file
Resident
Inspector
Project Inspector
G.
Cook
A. Johnson
R.
Nease,
N. Mestern
bcc w/o enclosures:
M. Smith
J. Zollicoffer
~
~
J.
D. Shiffer
0"-C I '9M
U
S
/
0
YES /
NO
YES
/
0
YES /
NO
ES /
NO
]
LMILLER
12//c/i 89
RE(UES
C
PY
YES
NO
MENDONCA ~
KI
SCH
12/
/89
12/
/89
CHAFFEE
ZIMMERMAN~~
12/l</89
12/iq/89
p g,l(.~~ 4.~
.
(~ I /9/pt
.
N
2/
/89
]g, $/u~ 4
pu
TO
YES /
NO
(~z~s...
-~)