'EGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ESSION NBR:8905110312
DOC.DATE: 89/04/19
NOTARIZED:
NO
CIL:50-275 Diablo Canyon Nuclear Power Plant, Unit 1, Pacific
Ga
50-323 Diablo Canyon Nuclear Power Plant, Unit 2, Pacific
Ga
AUTH.NAME
AUTHOR AFFILIATION
ZIMMERMAN,R.P.
Region 5, Ofc of the Director
RECIP.NAME
RECIPIENT AFFILIATION
SHIFFER,J.D.
Pacific Gas
& Electric Co.
SUBJECT:
Forwards Insp Repts 50-275/89-13
& 50-323/89-13
on
890123-0317.No vz.olations noted.
DISTRIBUTION CODE:
IE01D
COPIES
RECEIVED:LTR L ENCL L
SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice of Vio ation Response
NOTES:
DOCKET
g
05000275
05000323
R
I
+No
RECIPIENT
ID CODE/NAME
PD5
INTERNAL: ACRS
AEOD/DEIIB
DEDRO
NRR/DEST DIR
NRR/DLPQ/QAB 10
NRR/DREP/EPB
10
NRR/DRIS DIR 9A
NUDOCS-ABSTRACT
OGC/HDS2
RGN5
FILE
01
EXTERNAL: LPDR
COPIES
LTTR ENCL
1
1
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
ROOD,H
4
AEOD/TPAD
NRR SHANKMAN,S
NRR/DLPQ/PEB 11
NRR/DOEA DIR 11
NRR/DREP/RPB
10
NRR/PMAS/ILRB12
- BERMAN,J
EG FIL
02
NRC PDR
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
2
2
1
1
1
1
1
1
1
1
R
I
S
~ 'IO ALL "RZDS" RECIPZEVIS:
PIZASE HELP US 'IO RHXKZ WASTE!
CGNI'ACr 'IHE DOQ3M!KI'ORIBDLDESK,
ROOM Pl-37
(EXZ. 20079) K) ELZMZNATE DER NME FBCH DZSTRIKlTIQN
LXSTS H)R DOCUMWZS YOU DON'T NEED.'
S
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
26
ENCL
26
APPi 19
-jgeg
Docket Nos. 50-275
and 50-323
Pacific
Gas
and Electric Company
77 Beale Street,
Room 1451
San Francisco,
California 94106
Attention:
Mr. J.
D. Shiffer, Vice President
Nuclear
Power Generation
Gentlemen:
Subject:
NRC Inspection of Diablo Canyon Units
1 and
2 - EA 89-85
This refers to
a special
inspection
conducted
by Messrs.
P.
P. Narbut and
K.
E. Johnston
during the period of January
23 through March 17,
1989.
Additionally, this report includes
the results of a meeting held in the
NRC
Region
V Offices in Walnut Creek, California on April 6, 1989.
This
inspection
examined your activities
as authorized
by
NRC License
Nos.
and
At the conclusion of the inspection,
discussions
of our findings
were held with you and other members of your staff.
The inspection
included
an examination of multiple problems involving the
inoperability of the Auxiliary Feedwater
System experienced
in December
1988
through February
1989.
Additionally, this report includes
an evaluation of
your Licensee
Event Reports written in response
to the
NRC findings pursuant
to
a special
team inspection,
as reported in NRC inspection report
50-275/89-01.
The specific areas
examined during this inspection
are described
in the
enclosed
inspection report.
Within these areas,
the inspection consisted of
selective
examinations of procedures
and representative
records,
interviews
with personnel,
and observations
by the inspectors.
Based
on the results of this inspection, it appears
that certain of your
activities were not conducted
in full compliance with
NRC requirements.
These
violations
have reenforced
our concerns
related to design basis
maintenance
and engineering
work.
Additionally, the adequacy of management
and quality
organization
followup and corrective actions
has
been identified as
a
potential continuing problem area
from these
inspection results.
Enforcement
related to these matters will be the subject of separate
correspondence.
In accordance
with 10 CFR 2.790 (a),
a copy of this letter and the enclosure
wi 11
be placed in the
NRC Public Document
Room.
85osi>0
~2
ADO
890
9
-00027$
QwQ
-2-
APR
J
9 '")9
Should you have
any questions
concerning this inspection,
we will be pleased
to discuss
them with you.
Division of Reactor Safety
and
Projects
Enclosure:
Inspection
Report Nos.
50-275/89-13
and 50-323/89-13
cc w/enclosure:
S.
M. Skidmore,
J.
D. Townsend,
PG8E (Diablo Canyon)
R.
F.
Locke,
PG8 E
D. Taggart,
PG&E (Diablo Canyon)
T.
L. Grebel,
PG&E (Diablo Canyon)
News Services,
PG8E (Diablo Canyon)
State of California
bcc w/enclosure:
Project Inspector
Resident
Inspector
docket file
G.
Cook
B. Faulkenberry
J. Martin
Rebecca
Nease,
bcc w/o enclosure:
J. Zollicoffer
M. Smith
REGION V
KEJohnaton/dot
PPNar ot
4/ff/89
4//0/89
MMMendonca
4/pf/89
EST
COPY ]
COPY ]
R
T COPY
YES /
NO
YES /
NO
NO
R
imme
an
AEChaffee
4/
/8
4/ l l/89
RENDU
T COPY ] REQUEST
Y ]
YES /
NO
YES /
NO
TO
]
YES /
NO
SRlchards
4/ 8/89
COPY
YE
/
NO
RH ey
4//7 /89
COPY ]
YES
NO