March 31, 1989 Docket Nos.

50-275 and 50-323 Mr. J.

D. Shiffer, Vice President Nuclear Power Generation c/o Nuclear Power Generation, Licensing Pacific Gas and Electric Company 77 Beale Street, Room 1451 San Francisco, California 94106 DISTRIBUTION--

I~ t ACRS (la)

NRC

& LPDRs EJordan GHolahan BGrimes MVirgilio LCunningham GKnighton TEssig HRood MMeinke JLee PDV Plant File OGC (for information only)

Dear Mr. Shiffer:

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION ABOUT DIABLO CANYON OFFSITE DOSE CALCULATION MANUAL Enclosed is a r equest for a complete, legible copy of the current Offsite Dose Calculation Manual for Diablo Canyon for use at NRC Headquarters and the Regions, and the Public Document Room. If you have any questions about this request, please contact me.

S incerely, original signed by Harry Rood, Senior Project Manager Project Directorate V

Division of Reactor Projects - III, IV, V and Special Projects

Enclosure:

Request for Additional Information cc w/encl:

See next page DR P/PD5 HRood O3/y.q/89 D

on

/89 OFFICIAL RECORD COPY ol 8904100166 S9'0331 PDR ADOCK 05000275 P

PDC

v

) vv t

I II,) 'I > ) f v v)

~ I <<vr 3:f<ff J

~

v I

v I, o

~

<<) 1 I h

)V Ii )',>>,

vf

~ ~

)

"~

~ f J;P 3'lr o

~ vq vrrv)

I

=

)

I ;gv

)

~ II v 1

~ 1 I

Iv

)

o II

~

I W

.P"',I. 1) '.-

I'

')1

'-f >>) fvg))>

Ir

~

If IO) f I

~

ooo li J.v rr Jv I II v)II I

I v'rp vvivf, '

v ~

o)v> ',"

ll I

0

~

Y)

II ')

)

4

~

I

)yL '., l'lC)'j'~ of

<<,1)

'W f

.)) >vl v

o< "f iyrv k

"?,$

l'

~

~PS RECIj~

Vp,0 Cy

~

I cA O~

/y +**<<+

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 March 31, 1989 Docket Nos. 50-275 and 50-323 Mr. J.

D. Shiffer, Vice President Nuclear Power Generation c/o Nuclear Power Generation, Licensing Pacific Gas and Electric Company 77 Beale Street, Room 1451 San Francisco, California 94106

Dear Mr. Shiffer:

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION ABOUT DIABLO CANYON OFFSITE DOSE CALCULATION MANUAL Enclosed is a request for a complete, legible copy of the current Offsite Dose Calculation Manual for Diablo Canyon for use at NRC Headquarters and the Regions, and the Public Document Room. If you have any questions about this request, please contact me.

Sincerely, Harry Rood, Senior Project Manager Project Directorate V

Division of Reactor Projects - III, IV, V and Special Projects

Enclosure:

Request for Additional Information cc w/encl:

See next page

Mr. J.

D. Shiffer Pacific Gas and E 1ectri c Company Diablo Canyon CC:

Richard F. Locke, Esq.

Paci fic Gas 5

E 1ectri c Company Post Office Box 7442 San Francisco, California 94120 Janice E. Kerr, Esq.

California Public Utilities Commission 350 McAllister Street San Francisco, California 94102 Ms. Sandra A. Silver 660 Granite Creek Road Santa Cruz, California 95065 Mr. W. C. Gangloff Westinghouse Electric Corporation P. 0.

Box 355 Pittsburg, Pennsylvania 15230 Managing Editor San Luis Obis o Count

. Tele ram r1 une 13'Roinson Avenue P. 0.

Box 112 San Luis Obispo, California 93406 Mr. Leland M. Gustafson, Manager Federal Relations Pacific Gas and Electric Company 1726 M Street, N.

W.

Washington, DC 20036-4502 Dian M. Grueneich Marcia Preston Law Office of Dian M. Grueneich 380 Hayes Street, Suite 4

San Francisco, California 94102 NRC Resident Inspector Diablo Canyon Nuclear Power Plant c/o U.S. Nuclear Regulatory Commission P. 0.

Box 369 Avila Beach, California 93424 Mr. Dick Blakenburg Editor 5 Co-Publisher South County Publishing Company P. 0.

Box 460 Arroyo Grande, California 93420 Bruce Norton, Esq.

c/o Richard F. Locke, Esq.

Pacific Gas and Electric Company Post Office Box 7442 San Francisco, California 94120 Dr. R. B. Ferguson Sierra Club - Santa Lucia Chapter Roc'anyon Star Route Creston, California 93432 Chairman San Luis Obispo County Board of Supervisors Room 270 County Government Center San Luis Obispo, California 93408 Director Energy Facilities Siting Division Energy Resources Conservation and Development Commission 1516 9th Street Sacramento, California 95814 Ms. Jacquelyn Wheeler 3033 Barranca Court San Luis Obispo, California 93401

Pacific Gas 8 Electric Company Diablo Canyon CC:

Ms. Laurie McDermott, Coordinator Consumers Organized for Defense of Environmental Safety 731 Pacific Street, Suite 42 San Luis Obispo, California 93401 Mr. Paul Szalinski, Chief Radiological Health Branch State Department of Health Services 714 P Street, Office Building 88 Sacramento, California 95814 Regional Administrator, Region V

U.S. Nuclear Regulatory Commission 1450 Maria Lane Suite 210 Walnut Creek, California 94596 Ns.

Nancy Culver 192 Luneta Street San Luis Obispo, California 93401 President California Public Utilities Commission Califor nia State Building 350 NcAllister Street San Francisco, Cali for nia 94102 Michael N. Strumwasser, Esq.

Special Assistant Attorney General State of California Department of Justice 3580 Wilshire Boulevard, Room 800 Los Angeles, California 90010

"C

RE(VEST FOR ADDITIONALINFORMATION (RAI)

PACIFIC GAS AND ELECTRIC COMPANY DIABLO CANYON POMER PLANT UPDATED OFFSITE DOSE CALCULATION MANUAL (ODCH)

ENCLOSURE By letter. dated March 1, 1989, Pacific Gas and Electric Company (licensee) submitted the Semiannual Radioactive Effluent Release Report for Diablo Canyon covering the period from July 1, 1988 through December,31, 1988.

As Attachments 2 and 3 to this report, the licensee submitted updated copies respectively of Revision 4 to the Diablo Canyon Environmental Radiological Monitoring Procedure (ERHP) and Revision 7 to the Diablo Canyon Offsite Dose Calculation Procedure (ODCP) as required by Diablo Canyon TS 6.14.2.

The combination of these two documents would comprise the "Offsite Dose Calculation Manual (ODCM)" referred to in Generic Letter 89-01 dated January 31, 1989.

Our survey of the original copy of these Attachments 2 and 3 submitted by the licensee to the NRC Document Control Desk shows that a number of pages are illegible.

In particular several of the figures and some of the equations are unreadable.

Page 20 of 20 of the ERMP was missing.

The importance of the ODCH as a stand-alone document of licensee commitments for radiological effluents and environmental monitoring has been emphasized by the publication of Generic Letter 89-01.

This Generic Letter dated January 31, 1989, established the mchanism for transferring the procedural details of a licensee's Radiological Effluent Technical Specifications (RETS)

to the ODCM in fulfillment of the Gomission's Policy Statement on Technical Specifications Improvements.

In view of this development it is essential that

~corn iete, ~le ib1e copies of a iicensee's current ODCH be available within the NRC and in the Public Document Room.

s Therefore it is requested that within two seeks of receipt of this RAI the licensee provide to the NRG Document Control Desk for copying and distribution a complete, legible copy of the current Diablo Canyon ODCH presently in use at the plant.

This ODCH would consist of the current Diablo Canyon ODGP and ERHP.

defined by TS 6.14 in one volume.

Since the remaining pages of the Semiannual Report are of acceptable legibility, there is no need to resubmit the entire report.

This request is for the current Diablo Canyon ODCH only.

4

~

ec I