March 21, 1989 Docket Nos.

50-275 and 50-323 Mr. J.

D. Shiffer, Vice President Nuclear Power Generation c/o Nuclear Power Generation, Licensing Pacific Gas and Electric Company 77 Beale Street, Room 1451 San Francisco, California 94106

Dear Mr. Shiffer:

DISTRIBUTION Ed d

NRC 8

LPDR BGrimes GHolahan FAllenspach MVirgilio AGody JLee ACRS (10)

HRood GKnighton PDV Plant File EMcKenna OGC (for information only)

SUBJECT:

NRC STAFF POSITION REGARDING AMENDMENT RE(VEST LAR 89-01 REVISING TECHNICAL SPECIFICATION SECTION 6.0, "ADMINISTRATIVECONTROLS,"

(TAC NOS.

72706 AND 72707)

By letter dated February 28, 1989, Pacific Gas and Electric Company (PGIIE) submitted License Amendment Request (LAR) 89-01, which requested changes to Section 6.0 of the combined Technical Specifications (TS) for Diablo Canyon, Units 1 and 2.

The NRC staff has completed its initial review of this request and finds that some of the proposed changes are not acceptable without modifications.

The staff position regarding the unacceptable areas is described in Enclosure l.

The staff review of LAR 89-01 will not proceed until PGIIE submits a revised amendment request that addresses the items in Enclosure 1.

If you have any questions regarding this matter, please contact me.

t Sincerely,

/s/

Enclosure:

1. Staff Positions on LAR 89-01 Harry'ood, Senior Project Manager Project Directorate V

Division of Reactor Projects - III, IV, V and Special Projects cc w/encl:

See n

DRSP/PD5 D

HRood A

xt page PEB dy 89 03/P/89 03/z i OFFICIAL RECORD COPY GKnighton 03/zl/89 8903300010 890321 PDR ADOCK 05000275 P

PDC p0

~

4

~ ~

>'lt I( 4 I

4 I j I

4 I

Rl' P

I A I

lit',

'I f 4'I 4 hp I

R II R

4 It R" II f Jl

~ f 4

44 4

hh 4

il It

~.R

~ f

~ 'I 4

44(f'

+IIR I

J

'4 II

'l 4

I

~

4 RR I

~

41 4

V 4

h

r I

~

~g RE0Ir, tpo

~ >

  • n C

O IA0

/~

nL n ++*++

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 March 21, 1989 Docket Nos.

50-275 and 50-323 Mr. J.

D. Shiffer, Vice President Nuclear Power Generation c/o Nuclear Power Generation, Licensing Pacific Gas and Electric Company 77 Beale Street, Room 1451 San Francisco, California 94106

Dear Mr. Shiffer:

SUBJECT:

NRC STAFF POSITION REGARDING AMENDMENT. REQUEST LAR 89-01 REVISING TECHNICAL SPECIFICATION SECTION 6.0, "ADMINISTRATIVECONTROLS,"

(TAC NOS.

72706 AND 72707)

By letter dated February 28, 1989, Pacific Gas and Electric Company (PG&E) submitted License Amendment Request (LAR) 89-01, which requested changes to Section 6.0 of the combined Technical Specifications (TS) for Diablo Canyon, Units 1 and 2.

The NRC staff has completed its initial review of this request and finds that some of the proposed changes are not acceptable without modifications.

The staff position regarding the unacceptable areas is described in Enclosure 1.

The staff review of LAR 89-01 will not proceed until PGSE,submits a revised amendment request that addresses the items in Enclosure 1.

If you have any questions regarding this matter, please contact me.

Sincerely,

Enclosure:

1. Staff Positions on LAR 89-01 cc w/encl:

See next page Harry Rood, Senior Project Manager Project Directorate V

Division of Reactor Projects - III, IV, V and Special Projects

Mr. J.

D. Shiffer Pacific Gas and Electric Company Diablo Canyon CC:

Richard F. Locke, Esq.

Pacific Gas 8 Electric Company Post Office Box 7442 San Fr ancisco, California 94120 Janice E. Kerr, Esq.

California Public Utilities Commission 350 McAllister Street San Francisco, California 94102 Ms. Sandra A. Silver 660 Granite Creek Road Santa Cruz, California 95065 Mr. W. C. Gangloff Westinghouse Electric Corporation P. 0.

Box 355 Pittsburg, Pennsylvania 15230 Managing Editor San Luis Obis o Count Tele ram ri une 13221 Jo Inson Avenue P. 0.

Box 112 San Luis Obispo, California 93406 Mr. Leland M. Gustafson, Manager Federal Relations Pacific Gas and Electric Company 1726 M Street, N. W.

Washington, DC 20036-4502 Dian M. Grueneich Marcia Preston Law Office of Dian M. Grueneich 380 Hayes Street, Suite 4

San Francisco, California 94102 NRC Resident Inspector Diablo Canyon Nuclear Power Plant c/o U.S. Nuclear Regulatory Commission P. 0.

Box 369 Avila Beach, California 93424 Mr. Dick Blakenburg Editor 5 Co-Publisher South County Publishing Company P. 0.

Box 460 Arroyo Grande, California 93420 Bruce Norton, Esq.

c/o Richard F. Locke, Esq.

Pacific Gas and Electric Company Post Office Box 7442 San Francisco, California 94120 Dr. R. B. Ferguson Sierra Club - Santa Lucia Chapter Rocky Canyon Star Route Creston, California 93432 Chairman San Luis Obispo County Board of Supervisors Room 270 County Government Center San Luis Obispo, California 93408 Director Energy Facilities Siting Division Energy Resources Conservation and Development Commission 1516 9th Str eet Sacramento, California 95814 Ms. Jacquelyn Wheeler 3033 Barranca Court San Luis Obispo, California 93401

Pacific Gas 8 Electric Company Diablo Canyon CC:

Ns. Laurie NcDermott, Coordinator Consumers Organized for Defense

- of Environmental Safety 731 Paci'fic Street, Suite 42 San Luis Obispo, California 93401 Mr. Paul Szalinski, Chief Radiological Health Branch State Department of Health Services 714 P Street, Office Building f8 Sacramento, California 95814 Regional Administrator, Region V

U.S. Nuclear Regulatory Commission 1450 Maria Lane Suite 210 Walnut Creek, California 94596 Ns.

Nancy Culver 192 Luneta Street San Luis Obispo, California 93401 President California Public Utilities Commission California State Building 350 NcAllister Street San Francisco, California 94102 Michael M. Strumwasser, Esq.

Special Assistant Attorney General State of California Department of Justice 3580 Wilshire Boulevard, Room 800 Los Angeles, California 90010

e f

S'

ENCLOSURE I STAFF. POSITIONS ON LAR 89-01 1.

Revised TS Section 6.5.1, "TECHNICAL REVIEW AND CONTROL," does not-define the qualification requirements that must be met in order for a reviewing individual to be considered "qualified."

These qualification requirements should be included in the proposed TS.

2.

Revised TS Section 6.5.2.5, "QUORUM," should state that a quorum consists of a majority (more than half) of the members of the Plant Staff Review Committee.

As proposed, this TS would define a quorum as five, which could be less than a majority if the PSRC consists of more than nine members, as would be permitted by 'revised TS Section 6.5.2.2.

3.

Revised TS Section 6.5.2.6.b is a deviation from the current Standard Technical Specifications.

The proposed change is not acceptable without defining who would review the proposed tests and experiments that would not receive PSRC review under the revised TS.

~

h y

~