Advises That Util 880523 Response to Generic Ltr 88-03, Steam Binding of Auxiliary Feedwater Pumps, Acceptable. Satisfactory Implementation of Procedures Verified by Insp Repts 50-275/88-13 & 50-323/88-12
ML16341F012
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 02/23/1989
From: Rood H
Office of Nuclear Reactor Regulation
To: Shiffer J
PACIFIC GAS & ELECTRIC CO.
References
GL-88-03, GL-88-3, TAC-67234, TAC-67235, NUDOCS 8903030279
Download: ML16341F012 (8)


See also: IR 05000275/1988013

Text

February

23,

1989

Docket Nos.

50-275

and 50-323

Mr. J.

D. Shiffer, Vice President

Nuclear Power Generation

c/o Nuclear

Power

Generation,

Licensing

Pacific Gas

and Electric Company

77 Beale Street,

Room 1451

San Franci sco,

Ca 1 ifornia

94106

Dear

Mr. Shiffer:

DISTRIBUTION

hR

d

NRC 8

LPDRs

'Olshan

MVirgi1 io

ACRS (10)

JLee .,

EJordan

BGrimes

GKnighton

PDV Plant File GHolahan

OGC (for,information only)

SUBJECT:

CLOSEOUT

OF GENERIC

LETTER 88-03,

"STEAM BINDING OF, AUXILIARY

FEEDWATER

PUMPS

(TAC NOS.

67234

AND 67235)

On February

17, 1988, Generic Letter 88-03 was issued.

This letter requested

all licensees

of operating

PHRs

and holders of construction

permits for PWRs

to confirm that appropriate

procedures

are in place,

and will be maintained

to minimize the occurrence

of steam binding of the auxiliary feedwater

(AFWf

pumps.

The recommended

procedures

would require the plant operators

to (1)

monitor fluid conditions within the

AFW system

each shift during times when

the system is required to be operable,

and (2) recognize

steam binding and

restore

the

AFW system to operable

status if steam binding occurs.

Your response,

dated

May 23, 1988,

confirmed that you have in place,

and will

maintain, the necessary

procedures.

Thus, your response

to Generic Letter 88-03 is satisfactory

and

no further action is necessary.

Satisfactory

implementation of these

procedures

has

been verified by

NRC Region

V

(reference

Inspection

Reports

50-275/88-13

and 50-323/88-12,

dated

May 26,

1988).

This completes

our efforts under

TAC NOS.

67234

and 67235.

S in cere ly,

original signed

by

Harry Rood, Senior Project Manager

Project Directorate

V

Division of Reactor Projects - III,

IV, V and Special Projects

cc w/encl:

See next page

P/PD5

D

PD5

HRood

ton

02/Q/89

2//I'/89

OFFICIAL RECORD

COPY

8903030279

890223

PDR

ADOCK 05000275

P

PDC

P

~

, ~

Mr>>

'M

P

.li

Il

)

P

~'~)

(

)

P

)

"

I

~

hh

~

~

M'f

P

P

P,

Qg)

)

P

H

P

H

I

P

I

) I

ht

P

g

'M

I

P

P

M

P

P

f

Ih

I H

h

M)h

H

) P

~

~

ll

II

P

H

II

hf r)

)

y

) l

P

I

)

Pt

M'

~PS REOIj,

(4

Mp

~c

n

C

O

o~+

Cy

/gn

pX

+**++

UNITEDSTATES

NUCLEAR REGULATORY COMMISSION

WASHINGTON, D. C. 20555

February

23,

1989

Docket Nos.

50-275

and 50-323

Mr. J.

D. Shiffer, Vice President

Nuclear Power

Gener ation

c/o Nuclear Power Generation,

Licensing

Pacific Gas

and Electric Company

77 Beale Street,

Room 1451

San Francisco, California

94106

Dear Hr. Shiffer:

SUBJECT:

CLOSEOUT

OF GENERIC

LETTER 88-03,

"STEAN BINDING OF AUXILIARY

FEEDWATER PUMPS"

(TAC NOS.

67234

AND 67235)

On February

17,

1988, Generic Letter 88-03 was issued.

This letter requested

all licensees

of operating

PWRs and holders of construction

permits for PWRs

to confirm that appropriate

procedures

are in place,

and will be maintained,

to minimize the occurrence of steam binding of the auxiliary feedwater

(AFW)

pumps.

The recommended

procedures

would require the plant operators

to (1)

monitor fluid conditions within the

AFW system

each shift during times when

the system is required to be operable,

and (2) recognize

steam binding and

restore

the

AFW system to operable

status if steam binding occurs.

Your response,

dated

May 23, 1988,

confirmed that you have in place,

and will

...,....maintain,

the necessary

procedures.

Thus, your response

to Generic Letter 88-03 is satisfactory

and

no further action is necessary.

Satisfactory

implementation of these

procedures

has

been verified by

NRC Region

V

(reference

Inspection

Reports 50-275/88-13

and 50-323/88-12,

dated

Hay 26,

1988).

This completes

our efforts under

TAC NOS.

67234

and 67235.

Sincerely,

Harry

Ro d, Senior Project Nanager

Project Directorate

V

Division of Reactor Projects - III,

IV, V and Special Projects

cc w/encl:

See next page

V

I

~

l

~

~

Mr. J.

D. Shiffer Pacific Gas

and Electric Company

Diablo Canyon

CC:

Richard F. Locke,

Esq.

Pacific Gas

5 Electric Company

Post Office Box 7442

San Francisco,

California

94120

Janice

E. Kerr, Esq.

California Public Utilities Commission

350 HcAllister Street

San Francisco, California

94102

Ms. Sandra

A. Silver

660 Granite Creek

Road

Santa

Cruz, California

95065

Mr. W. C. Gangloff

Westinghouse Electric Corporation

P. 0.

Box 355

Pittsburgh,

Pennsylvania

15230

Managing Editor

San Luis Obispo County Telegram

Tribune

1321 Johnson

Avenue

P. 0.

Box 112

San Luis Obispo, California

93406

Mr. Leland H. Gustafson,

Manager

Federal

Relations

Pacific Gas

and Electric Company

1726

M Street,

N.

W.

Washington,

DC

20036-4502

Dian H. Grueneich

Marcia Preston

Law Office of Dian M. Grueneich

380 Hayes Street,

Suite

4

San

Fr ancisco, California

94102

NRC Resident

Inspector

Diablo Canyon Nuclear Power Plant

c/o U.S. Nuclear Regulatory

Commission

P. 0.

Box 369

Avila Beach, California

93424

Mr. Dick Blakenburg

Editor 5 Co-Publisher

South County Publishing

Company

P. 0.

Box 460

Arroyo Grande, California

93420

Bruce Norton, Esq.

c/o Richard F. Locke, Esq.

Pacific Gas

and Electric Company

Post Office Box 7442

San Francisco, California

94120

Dr. R. B. Ferguson

Sierra

Club - Santa

Lucia Chapter

Roclgr Canyon Star Route

Creston, California

93432

Chairman

San Luis Obispo County Board of

Supervisors

Room 270

County Government Center

San Luis Obispo, California

93408

Director

Energy Facilities Siting Division

Energy Resources

Conservation

and

Development

Commission

1516 9th Street

Sacr amento, California

95814

Hs. Jacquelyn

Wheeler

3033 Barranca

Court

San Luis Obispo, California

93401

h

4

~ J

~

~

~ ~

I

Pac ific Gas

8

E 1 ectr ic Company

- 2 -

Diablo Canyon

CC:

Ms. Laurie McDermott, Coordinator

Consumers

Organized for Defense

of Environmental Safety

731 Pacific Street,

Suite

42

San Luis Obispo, California

93401

Mr. Jack McGurk, Acting Chief

Radiological Health Branch

State

Department of Health

Services

714

P Street, Office Building 88

Sacramento,

California

95814

Regional Administrator, Region

V

U.S. Nuclear Regulatory

Commission

1450 Maria Lane

Suite 210

Walnut Creek, California

94596

Ms.

Nancy Culver

192 Luneta Street

San Luis Obispo, California

93401

President

California Public Utilities

Commission

California State Building

350 McAllister Street

Sari Francisco,

Califor nia

94102

Michael

M. Strumwasser,

Esq.

Special Assistant Attorney General

State of California

Department of Justice

3580

Wi lshire Boulevard,

Room 800

Los Angeles, California

90010

'V

gv

~ ri