Text
P
ACCEIZRATED
D1STKBUT3ON
DEMOYSTRXTlON
SYrrZM
l~
I I
REGULATORY XNFORMATION DISTRIBUTION SYSTEM (RIDS)
CCESSION NBR:8807210164
DOC.DATE: 88/07/12
NOTARIZED- NO
FACIL:50-275 Diablo Canyon Nuclear Power Plant, Unit 1, Pacific
Ga
50-323 Diablo Canyon Nuclear Power Plant, Unit 2, Pacific
Ga
AUTH.NAME
AUTHOR AFFILIATION
PATE,R.J.
Region 5, Ofc of the Director
RECIP.NAME
RECIPIENT AFFILIATION
SHIFFER,J.D.
Pacific Gas
& Electric Co.
DOCKET
05000275
05000323
SUBJECT:
Discusses
861215-19
DISTRIBUTION CODE:
TITLE: General
(50
NOTES:
Insp Repts
50-275/86-33
& 50-323/86-31
on
& forwards notice of violation.
IEOID
COPIES
RECEIVED:LTR J
ENCLi SIZE:
Dkt)-Insp Rept/Notice of Vino ation Response
INTERNAL:
RECIPIENT
XD CODE/NAME
PD5
DEDRO
NRR/DLPQ/PEB 11
NRR/DOEA DIR 11
NRR/DREP/RPB
10
NRR/PMAS/ILRB1 2
OE LIEBE
,J
L
02
FILE
01
COPIES
LTTR ENCL
1
1
2
2
1
1
1
1
1
1
2
2
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
ROOD,H
NRR MORISSEAU,D
NRR/DLPQ/QAB 10
NRR/DREP/EPB
10
NRR/DRIS DIR 9A
NUDOCS-ABSTRACT
OGC 15-B-18
RES/DSIR
DEPY
COPIES
LTTR ENCL
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
h
EXTERNAL: LPDR
2
2
1
1
NRC PDR
1
1
R
I
=
S
h
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
26 'NCL
26
JUL i 2
3988
Docket Nos.
50-275 and 50-323
Pacific Gas
and Electric
Company
77 Beale Street
Room 1451
San Franci sco,
Cal ifor ni a
94106
Attention:
Mr. J.
D. Shiffer, Vice President
Nuclear Power Generation
SUBJECT:
VIOLATION IDENTIFIED DURING INSPECTION NOS. 50-275/86-33
and
50-323/86-31
A team inspection
was conducted
by Mr.
S.
D. Alexander and other
NRC
representatives
during the period of December
15-19,
1986, at the Diablo
Canyon
Power Plant of activities authorized
by
NRC License
Nos.
DPR-80 and
The team's findings were discussed
with you and members of your staff
at the conclusion of the inspection
and documented
in Inspection
Report Nos.
50 275/86
33 and
50 323/86 31.
The inspection included reviews of your implementation of a program required
by 10 CFR 50.49 for establishing
and maintaining the qualification of electric
equipment within the scope of 10 CFR 50.49.
Based
on the results of the inspection,
one unresolved
item remained
outstanding
from the subject inspection report,
and was
under
review by the
Office of Nuclear Reactor Regulation
(NRR) for resolution.
NRR has
now
completed its review of this item; and it appears
that this activity was not
conducted
in full compliance with NRC requirements,
as set forth in the Notice
of Violation, enclosed
as Appendix A.
In accordance
with 10 CFR 2.790(a),
a copy of this letter and the enclosure
will be placed in the
NRC Public Document
Room.
The responses
directed
by this letter and the accompanying
Notice are not
subject to the clearance
procedures
of the Office of Management
and Budget as
required
by the Paperwork Reduction Act of 1980,
PL 96-511.
Should you have
any questions
concerning this Notice,
we will be glad to
discuss
them with you.
Ql"(
)A@5)
Reactor Safety Branch
8807210164
8807i2
ADOCK 05000275
9
1
SU/
1 2
)ggg
Enclosure:
Appendix
cc w/enclosure:
S.
M. Skidmore,
J.
D. Townsend,
R.
F.
Locke,
D. Taggart,
R. Weinberg,
T.
L. Grebel,
State of California
bcc w/enclosure:
Resident
Inspector
Project Inspector
docket file
G.
Cook
A. Johnson
B. Faulkenberry
'.
Martin
M. Smith
J. Zollicoffer
REGION V
JBurdoin/dot
SR c ards
7/i!/
7//~/88
AJoh son
7/
/88
UPotapovs
7 /
8po
RJPate
7//z
8
U ST
COPY ] RE/VEST
3
REQUEST
3
UEST
COPY
3
EQUEST
COPY
7
ES / ~
YES /
NO
YES /
NO'S
/
YES /
NO
S
D TO
3
ES /~