Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-275/88-07.Actions Re Item a Concerning Cleanliness Controls Will Be Evaluated in Conjunction W/Response to Ref Subsequent Violation
ML16341E702
Person / Time
Site: Diablo Canyon 
Issue date: 06/22/1988
From: Zimmerman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Shiffer J
PACIFIC GAS & ELECTRIC CO.
References
NUDOCS 8806290108
Download: ML16341E702 (4)


See also: IR 05000275/1988007

Text

ACCELERATED

DISTRIBUTION

DEMONSTRATION

SYSTEM

SUBJECT:

Ack receipt of 880606 ltr informing NRC of steps

taken to

correct violations noted in Insp Rept 50-275/88-07.

DISTRIBUTION CODE: IEOID

COPIES

RECEIVED: LTR

I

ENCLI

SIZE:

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

1~6

NOTES

tI

4

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

CESSION NBR:8806290108

DOC.DATE: 88/06/22

NOTARIZED: NO

DOCKET I

FACIL:50-275 Diablo Canyon Nuclear Power Plant, Unit 1, Pacific

Ga

05000275

AUTH.NAME

AUTHOR AFFILIATION

ZIMMERMAN,R.

Region 5, Ofc of the Director

RECIP.NAME

RECIPIENT AFFILIATION

SHIFFER,J.D.

Pacific Gas

& Electric Co.

RECIPIENT

ID CODE/NAME

PD5

PD

INTERNAL: ACRS

DEDRO

NRR/DLPQ/PEB 11

NRR/DOEA DIR 11

NRR/DREP/RPB

10

NRR/PMAS/ILRB12

E,J

REG FIL

02

FILE

01

ERNAL: LPDR

NSIC

COPIES

LTTR ENCL

1

1

2

2

1

1

1

1

1

1

2

2

1

1

1

1

1

1

1

1

2

2

1

1

RECIPIENT

ID CODE/NAME

ROOD,H

AEOD

NRR MORISSEAU,D

NRR/DLPQ/QAB 10

NRR/DREP/EPB

10

NRR/DRIS DIR 9A

NUDOCS-ABSTRACT

OGC 15-B-18

RES/DRPS

DEPY

NRC PDR

COPIES

LTTR ENCL

2

2

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

/'

A

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

26

ENCL

26

SUiV 2

<

(."".

Oocket

No. 50-275

Pacific Gas

and Electric Company

77 Beale Street,

Room 1451

San Francisco,

California

94106

Attention:

Mr. J.

D. Shiffer, Vice President

Nuclear Power Generation

Gentlemen:

Thank you for your letter dated

June 6, 1988, in response

to our Notice of

Violation and Inspection Report

No. 50-275/88-07,

dated

May 5, 1988, informing

us of the steps

you have taken to correct the items which we brought to your

attention.

The actions you describe

in your June 6, 1988, letter regarding

Item A of the

subject Notice of Violation, on cleanliness

controls will be evaluated

in

conjunction with your response

to a subsequent

apparent violation regarding

ineffective, corrective actions

on the

same general

program area.

This

subsequent,

apparent violation was described

to you in the exit interview of

May 28, 1988,

and issued with Inspection Report 50-275/88-11

on June

17,

1988.

Your corrective actions for Notice of Violation on items

B and

C, dealing with

overpressurizing

the

RCOT and with calculational

errors in determining the

reactor vessel

vent path, will be verified in a future inspection.

Your cooperation with us is appreciated.

lANA

RRV

AOQ

40

OO

MlA

MO

00M

OV

wQ

OA

bcc w/copy of letter dated 6/6/88:

Resident

Inspector

Project Inspector

G.

Cook

A. Johnson

B. Faulkenberry

J. Martin

J. Zollicoffer

Oocket File

REGION V

Joan/

MMendonca

06/~88

Zimmerman

06/9 3 88

bcc w/o copy of letter dated 6/6/88:

M. Smith

Sincerely,

Ori q( n'a.'l Signed

R.

Zimmerman, Chief

Reactor Projects

Branch

RE

EST

COPY

g

REQUEST

C

Y

g

ES /

NO

YES /

NO

S

TO

POR

]

YES /

NO

0