Forwards Insp Repts 50-275/88-10 & 50-323/88-09 on 880328-0401.No Violations Noted
ML16341E666
Person / Time
Site: Diablo Canyon  
Issue date: 05/03/1988
From: Pate R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Shiffer J
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16341E667 List:
References
NUDOCS 8805270033
Download: ML16341E666 (6)


See also: IR 05000275/1988010

Text

-ACCELERATED

DISTRIBUTION

DEMONSTRATION

SYSTEM

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

CESSION NBR:8805270033

DOC.DATE: 88/05/03

NOTARIZED: NO

FACIL:50-275 Diablo Canyon Nuclear Power Plant, Unit 1, Pacific

Ga

50-323 Diablo Canyon Nuclear Power Plant, Unit 2, Pacific

Ga

AUTH.NAME

AUTHOR AFFILIATION

PATE,R.J.

Region 5, Ofc of the Director

RECIP.NAME

RECIPIENT AFFILIATION

SHIFFER,J.D.

Pacific Gas

& Electric Co.

SUBJECT:

Forwards Insp Rats

50-275/88-10

& 50-323/88-09

on

880328-0401.No violations noted:

DISTRIBUTION CODE:

IE01D

COPIES

RECEIVED:LTR

l

ENCL

SIZE

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation R sponse

NOTES

DOCKET

05000275

05000323

RECIPIENT

ID CODE/NAME

PD5

PD

INTERNAL: ACRS

DEDRO

NRR/DLPQ/PEB ll

NRR/DOEA DIR 11

NRR/DREP/RPB

10

NRR/PMAS/ILRB12

OE L

,J

BILE

02

E

01

E TERNAL: LPDR

NSIC

COPIES

LTTR ENCL

1

1

2

2

1

1

1

1

1

1

2

2

1

1

1

1

1

1

1

1

2

2

1

1

RECIPIENT

ID CODE/NAME

ROOD,H

AEOD

NRR MORISSEAU,D

NRR/DLPQ/QAB 10

NRR/DREP/EPB

10

NRR/DRIS DIR 9A

NUDOCS-ABSTRACT

OGC 15-B-18

RES/DRPS

DEPY

NRC PDR

COPIES

LTTR ENCL

2

2

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

/

A

8

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

26

ENCL

26

MAY 8-

398&

Docket Nos. 50-275

and 50-323

Pacific

Gas

and Electric Company

77 Beale Street,

Room 1451

San Francisco,

Ca'lifornia

94106

Atten'tion:

Mr. J.

D. Shiffer, Vice President

Nuclear Power Generation

Gentlemen:

SUBJECT:

NRC INSPECTION

OF DIABLO CANYON UNITS I AND 2

This refers to the inspection

conducted

by Mr. C.

Ramsey of this office during

March 28 through April', 1988, of activities authorized

by

NRC License

Nos.

DPR-80 and DPR-82,

and to the discussion

of our findings with

Mr. R. Thornberry,

and other members of your staff on April 1, 1988.

Areas

examined during this inspection

are described

in the enclosed

inspection

report.

Within these

areas,

the inspection consisted of selective

examinations of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspector.

As discussed

in paragraphs

2.A

of the report,

concern

was expressed

by the inspector regarding potential

impact

on the plant resulting from wildland fires.

The voluntary steps

you

are taking to address

this concern will be reviewed during future

NRC

inspections.

No violations of NRC requirements

were identified within the scope of this

inspection.

In accordance

with 10 CFR 2.790(a),

a copy of this letter and the enclosure

will be placed in the

NRC Public Document

Room.

Should you have any questions

concerning this inspection,

we will be glad to

discuss

them with you.

Sincerely,

O'C~

tA~ bl'P~

Reactor Safety Branch

Enclosure:

Inspection

Report Nos. 50-275/88-10

and 50-323/88-09

8805270033

880503

PDR

ADOCK 05000275

g

DCQ

"i z-Q

-2-

MAY 3-

1988

bcc w/enclosure:

Resident

Inspector

Project Inspector

G.

Cook

B.

Faul kenberry

J. Martin

docket file

State of California

D. Persinko,

NRR

J.

Wiseman,

Region IX

J. Ulie, Region III

A. Singh,

Region IV

D. Kubicki, NRR

D. Notley,

NRR

J. Petrosino,

NRR

A. Datta,

RES

bcc w/o enclosure:

LFMB

M. Smith

REGION V

/i~pc'Ramsey/dot

SRfch

ds

MMendonca

RJPate

5/W/88

5/2

88

5/3

5~/88

fug-

RE

VEST COPY

7

R

VEST COPY ]

T

CO

Y ]

ST

COPY ]

/

NO

YES /

NO

YES /

YE

/

NO

SEND TO

PDR

7

ES /

NO