ML16341E666
| ML16341E666 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 05/03/1988 |
| From: | Pate R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Shiffer J PACIFIC GAS & ELECTRIC CO. |
| Shared Package | |
| ML16341E667 | List: |
| References | |
| NUDOCS 8805270033 | |
| Download: ML16341E666 (6) | |
See also: IR 05000275/1988010
Text
-ACCELERATED
DISTRIBUTION
DEMONSTRATION
SYSTEM
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
CESSION NBR:8805270033
DOC.DATE: 88/05/03
NOTARIZED: NO
FACIL:50-275 Diablo Canyon Nuclear Power Plant, Unit 1, Pacific
Ga
50-323 Diablo Canyon Nuclear Power Plant, Unit 2, Pacific
Ga
AUTH.NAME
AUTHOR AFFILIATION
PATE,R.J.
Region 5, Ofc of the Director
RECIP.NAME
RECIPIENT AFFILIATION
SHIFFER,J.D.
Pacific Gas
& Electric Co.
SUBJECT:
Forwards Insp Rats
50-275/88-10
& 50-323/88-09
on
880328-0401.No violations noted:
DISTRIBUTION CODE:
IE01D
COPIES
RECEIVED:LTR
l
ENCL
SIZE
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation R sponse
NOTES
DOCKET
05000275
05000323
RECIPIENT
ID CODE/NAME
PD5
INTERNAL: ACRS
DEDRO
NRR/DLPQ/PEB ll
NRR/DOEA DIR 11
NRR/DREP/RPB
10
NRR/PMAS/ILRB12
OE L
,J
BILE
02
E
01
E TERNAL: LPDR
COPIES
LTTR ENCL
1
1
2
2
1
1
1
1
1
1
2
2
1
1
1
1
1
1
1
1
2
2
1
1
RECIPIENT
ID CODE/NAME
ROOD,H
NRR MORISSEAU,D
NRR/DLPQ/QAB 10
NRR/DREP/EPB
10
NRR/DRIS DIR 9A
NUDOCS-ABSTRACT
OGC 15-B-18
RES/DRPS
DEPY
NRC PDR
COPIES
LTTR ENCL
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
/
A
8
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
26
ENCL
26
MAY 8-
398&
Docket Nos. 50-275
and 50-323
Pacific
Gas
and Electric Company
77 Beale Street,
Room 1451
San Francisco,
Ca'lifornia
94106
Atten'tion:
Mr. J.
D. Shiffer, Vice President
Nuclear Power Generation
Gentlemen:
SUBJECT:
NRC INSPECTION
OF DIABLO CANYON UNITS I AND 2
This refers to the inspection
conducted
by Mr. C.
Ramsey of this office during
March 28 through April', 1988, of activities authorized
by
NRC License
Nos.
and to the discussion
of our findings with
Mr. R. Thornberry,
and other members of your staff on April 1, 1988.
Areas
examined during this inspection
are described
in the enclosed
inspection
report.
Within these
areas,
the inspection consisted of selective
examinations of procedures
and representative
records,
interviews with
personnel,
and observations
by the inspector.
As discussed
in paragraphs
2.A
of the report,
concern
was expressed
by the inspector regarding potential
impact
on the plant resulting from wildland fires.
The voluntary steps
you
are taking to address
this concern will be reviewed during future
NRC
inspections.
No violations of NRC requirements
were identified within the scope of this
inspection.
In accordance
with 10 CFR 2.790(a),
a copy of this letter and the enclosure
will be placed in the
NRC Public Document
Room.
Should you have any questions
concerning this inspection,
we will be glad to
discuss
them with you.
Sincerely,
O'C~
tA~ bl'P~
Reactor Safety Branch
Enclosure:
Inspection
Report Nos. 50-275/88-10
and 50-323/88-09
8805270033
880503
ADOCK 05000275
g
DCQ
"i z-Q
-2-
MAY 3-
1988
bcc w/enclosure:
Resident
Inspector
Project Inspector
G.
Cook
B.
Faul kenberry
J. Martin
docket file
State of California
D. Persinko,
J.
Wiseman,
Region IX
J. Ulie, Region III
A. Singh,
Region IV
D. Kubicki, NRR
D. Notley,
J. Petrosino,
A. Datta,
bcc w/o enclosure:
LFMB
M. Smith
REGION V
/i~pc'Ramsey/dot
SRfch
ds
MMendonca
RJPate
5/W/88
5/2
88
5/3
5~/88
fug-
RE
VEST COPY
7
R
VEST COPY ]
T
CO
Y ]
COPY ]
/
NO
YES /
NO
YES /
YE
/
NO
SEND TO
7
ES /
NO