ML16341E557
| ML16341E557 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 02/17/1988 |
| From: | Zimmerman R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Shiffer J PACIFIC GAS & ELECTRIC CO. |
| Shared Package | |
| ML16341E558 | List: |
| References | |
| NUDOCS 8803080101 | |
| Download: ML16341E557 (8) | |
See also: IR 05000275/1987044
Text
REGUL*!
Y INFORMATIOlIl DiSTR IBU! I 'YSTEM (R IDS)
ACCESSION
NBR: 8803080101
DQC. DATE: 88/02/17
NQT*RIZFD:
NQ
ACIL:50-275 Diablo Canyon Nuclear
Power Planti
Unit ii Pac ific
Qa
50-323 Diablo Canyon Nuclear
Power Plant.
Unit 2I Pacific
Qa
AUTH. M*ME
AUTHOR AFFILIATION
ZIMMERMANIR. P.
Rag ion
5I
Qf c of the Director
RECIP. NAME
RECIPIENT AFFILIATION
SHiFFER, J. D.
Pacific
Qas
~s Electric
Co.
DOCKET 0
O5O0O275
05000323
SUBJECT:
Formards
Insp Repts
50-275/87-44
ic 50-323/87-45
on 871220-
880130
8c notice of violation. Three areas
of concern
identi fied including 880108 reactor trip
8i sever al
examples
of inadequate
conf igura bion controls.
DISTRIBUTION CODE:
IEOID
COPIES
RECEIVED: LTR
I
ENCL J
SIZE:
TITLE: Genei al
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:
REC IP IENT
ID CODE/NAME
PD5
CQP IES
LTTR El'lCL
1
1
REC IP IENT
ID CODE/NAME
ROOD'
CQP IES
LTTR ENCL
INTERNAL
- CRS
DEDRQ
NRR/DLPG/PEB11B
NRR/DQEA DIRiiE
NRR/DREP/RPB 10A
NRR/PMAS/ ILRB12
OQC 15-8-18
RES/DRPS
DIR
2
2
1
1
2
1
1
2
1
1
- EOD
MOR ISSEAUi D
NRR/DLPG/G*B10A
NRR/DREP/EPB10D
NRR/GRIS DIR9A2
QE LIEBERMANiJ
FILE
01
1
1
1
1
1
f
1
1
1
1
EXTERNAL:
LPDR
NRC
TOTAL NUMBER OF CQPiES
REGUTRED:
LTTR
25
ENCL
25
~
~
r
/
<<=Q
g
II
~
Q /
Docket Nos.
50-275
and 50-323
Pacific Gas
and Electric Company
77 Beale Street,
Room 1451
San Francisco,
California 94106
Attention:
Mr. J.
D. Shiffer, Vice President
Nuclear
Power Generation
Gentlemen:
Subject:
NRC Inspection of Diablo Canyon Units
1 and
2
This refers to the
a routine inspection
conducted
by Messrs.
L.
M.
Padovan
and
K.
E. Johnston
during the period of December
20,
1987 through January
30,
1988.
This inspection
examined your activities
as authorized
by
NRC License
Nos
~
DPR-80 and
At the conclusion of the inspection,
discussions
of
their findings were held with Mr. J.
D. Townsend,
and other members of your
staff.
Areas
examined during this inspection are described
in the enclosed
inspection
report.
Within these
areas,
the inspection consisted
of selective
examinations
of procedures
and representative
records,
interviews with
personnel',
and observations
by the inspectors.
Based
on the results of this inspection, it appears
that one of your
activities
was not conducted
in full compliance with NRC requirements,
as set
forth in the Notice of Violation, enclosed
herewith as Appendix A.
Your
response
to this notice is to be submitted in accordance
with the provisions
of 10 CFR 2.201
as stated
in Appendix A, Notice of Violation.
In addition, three
areas of concern
were identified in this report and
discussed
in the exit meeting for assessment
by plant management.
First,,the
described
January
8, 1988, reactor trip represents
another
example of failure
to provide
a thorough
and in-depth assessment
of a first-of-a-kind operation,
and obtain higher level supervision or management
guidance
before proceeding
in the face of uncertainty.
Secondly,
several
examples
of inadequate
configuration controls are provided,
suggesting
the
need for improvements
in
the configuration control
system at Diablo Canyon.
Thirdly, documented
recent
examples of inadequate
root cause
analysis
and untimely corrective actions
indicate plant management
must take additional
steps
to assure
an atmosphere
whereby your staff members insist upon
a thorough explanation
and in-depth
understanding
of plant problems in a. timely manner.
Further management
attention to address
these
issues
and implement
and enhance
the corrective
actions described
in your June
15,
1987, letter to the
NRC appears
to be
warranted.
In accordance
with 10 CFR 2.790 (a),
a copy of this letter and the enclosures
will be placed in the
NRC Public Document
Room.
203p80io
PUP
<><
1
SSOP~~
6
<H
OGOOO~~>
>~OR
Tea 7
"2-
The responses
directed
by this letter are not subject to the clearance
procedures
of the Office of Management
and Budget as required
by the Paperwork
Reduction Act o'f 1980,
PL 96-511.
Should you have
any questions
concerning this inspection,
we will be pleased
to discuss
them with you.
Sincerely,
R.
P.
Zimmerman,
C ief
Reactor Projects
Branch
Enclosures:
A.
Appendix A, Notice of Violation
BE
Inspection
Report Nos.
50-275/87-44
and 50-323/87-45
cc w/enclosures:
S.
D. Skidmore,
R.
F.
Locke,
J.
D. Townsend,
PG&E (Diablo Canyon)
D.
A. Taggert,
PG&E (Diablo- Canyon)
R.
S. Weinberg,
PG&E (Diablo Canyon)
T.
L. Grebel,
PG&E (Diablo Canyon)
State of California
Sandra Silver (Report Only)
bcc w/enclosures:
RSB/Document Control
Desk (RIDS) (IE01)
D. Persinko,
Project Inspector
Resident
Inspector
Randy
Huey
(SONGS)
G.
Cook
B. Faulkenberry
J.,Martin
Docket File
bcc w/o enclosure
B:
LFMB
M. Smith
Region V/norma
L fgQUEST
COPY ]
EQUEST
COPY ] REqUEST
COPY ] RE(VEST
COPY ]
gUEST
COPY ]
!YES j/
NO
]
ES) /
NO
/It'ES /
NO
] YES /
NO
YES'
NO
]
LMPadovan
2/ '/88
yq Iv
KEJohnston
2/]q /88
MMMendonca
2/I1 /88
i>,scv m~ 4<
j~ihi"<<w
AJohnson
2/
/88
[ S
O'O
7
YES /
NO
RPZimmdrman
2//7/88
0