Forwards Insp Repts 50-275/87-44 & 50-323/87-45 on 871220- 880130 & Notice of Violation.Three Areas of Concern Identified Including 880108 Reactor Trip & Several Examples of Inadequate Configuration Controls
ML16341E557
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 02/17/1988
From: Zimmerman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Shiffer J
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16341E558 List:
References
NUDOCS 8803080101
Download: ML16341E557 (8)


See also: IR 05000275/1987044

Text

REGUL*!

Y INFORMATIOlIl DiSTR IBU! I 'YSTEM (R IDS)

ACCESSION

NBR: 8803080101

DQC. DATE: 88/02/17

NQT*RIZFD:

NQ

ACIL:50-275 Diablo Canyon Nuclear

Power Planti

Unit ii Pac ific

Qa

50-323 Diablo Canyon Nuclear

Power Plant.

Unit 2I Pacific

Qa

AUTH. M*ME

AUTHOR AFFILIATION

ZIMMERMANIR. P.

Rag ion

5I

Qf c of the Director

RECIP. NAME

RECIPIENT AFFILIATION

SHiFFER, J. D.

Pacific

Qas

~s Electric

Co.

DOCKET 0

O5O0O275

05000323

SUBJECT:

Formards

Insp Repts

50-275/87-44

ic 50-323/87-45

on 871220-

880130

8c notice of violation. Three areas

of concern

identi fied including 880108 reactor trip

8i sever al

examples

of inadequate

conf igura bion controls.

DISTRIBUTION CODE:

IEOID

COPIES

RECEIVED: LTR

I

ENCL J

SIZE:

TITLE: Genei al

(50 Dkt)-Insp Rept/Notice of Violation Response

NOTES:

REC IP IENT

ID CODE/NAME

PD5

PD

CQP IES

LTTR El'lCL

1

1

REC IP IENT

ID CODE/NAME

ROOD'

CQP IES

LTTR ENCL

INTERNAL

  • CRS

DEDRQ

NRR/DLPG/PEB11B

NRR/DQEA DIRiiE

NRR/DREP/RPB 10A

NRR/PMAS/ ILRB12

OQC 15-8-18

RES/DRPS

DIR

2

2

1

1

2

1

1

2

1

1

  • EOD

NRR

MOR ISSEAUi D

NRR/DLPG/G*B10A

NRR/DREP/EPB10D

NRR/GRIS DIR9A2

QE LIEBERMANiJ

FILE

01

1

1

1

1

1

f

1

1

1

1

EXTERNAL:

LPDR

NSIC

NRC

PDR

TOTAL NUMBER OF CQPiES

REGUTRED:

LTTR

25

ENCL

25

~

~

r

/

<<=Q

g

II

~

Q /

Docket Nos.

50-275

and 50-323

Pacific Gas

and Electric Company

77 Beale Street,

Room 1451

San Francisco,

California 94106

Attention:

Mr. J.

D. Shiffer, Vice President

Nuclear

Power Generation

Gentlemen:

Subject:

NRC Inspection of Diablo Canyon Units

1 and

2

This refers to the

a routine inspection

conducted

by Messrs.

L.

M.

Padovan

and

K.

E. Johnston

during the period of December

20,

1987 through January

30,

1988.

This inspection

examined your activities

as authorized

by

NRC License

Nos

~

DPR-80 and

DPR-82.

At the conclusion of the inspection,

discussions

of

their findings were held with Mr. J.

D. Townsend,

and other members of your

staff.

Areas

examined during this inspection are described

in the enclosed

inspection

report.

Within these

areas,

the inspection consisted

of selective

examinations

of procedures

and representative

records,

interviews with

personnel',

and observations

by the inspectors.

Based

on the results of this inspection, it appears

that one of your

activities

was not conducted

in full compliance with NRC requirements,

as set

forth in the Notice of Violation, enclosed

herewith as Appendix A.

Your

response

to this notice is to be submitted in accordance

with the provisions

of 10 CFR 2.201

as stated

in Appendix A, Notice of Violation.

In addition, three

areas of concern

were identified in this report and

discussed

in the exit meeting for assessment

by plant management.

First,,the

described

January

8, 1988, reactor trip represents

another

example of failure

to provide

a thorough

and in-depth assessment

of a first-of-a-kind operation,

and obtain higher level supervision or management

guidance

before proceeding

in the face of uncertainty.

Secondly,

several

examples

of inadequate

configuration controls are provided,

suggesting

the

need for improvements

in

the configuration control

system at Diablo Canyon.

Thirdly, documented

recent

examples of inadequate

root cause

analysis

and untimely corrective actions

indicate plant management

must take additional

steps

to assure

an atmosphere

whereby your staff members insist upon

a thorough explanation

and in-depth

understanding

of plant problems in a. timely manner.

Further management

attention to address

these

issues

and implement

and enhance

the corrective

actions described

in your June

15,

1987, letter to the

NRC appears

to be

warranted.

In accordance

with 10 CFR 2.790 (a),

a copy of this letter and the enclosures

will be placed in the

NRC Public Document

Room.

203p80io

PUP

<><

1

SSOP~~

6

<H

OGOOO~~>

>~OR

Tea 7

"2-

The responses

directed

by this letter are not subject to the clearance

procedures

of the Office of Management

and Budget as required

by the Paperwork

Reduction Act o'f 1980,

PL 96-511.

Should you have

any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

Sincerely,

R.

P.

Zimmerman,

C ief

Reactor Projects

Branch

Enclosures:

A.

Appendix A, Notice of Violation

BE

Inspection

Report Nos.

50-275/87-44

and 50-323/87-45

cc w/enclosures:

S.

D. Skidmore,

PG&E

R.

F.

Locke,

PG&E

J.

D. Townsend,

PG&E (Diablo Canyon)

D.

A. Taggert,

PG&E (Diablo- Canyon)

R.

S. Weinberg,

PG&E (Diablo Canyon)

T.

L. Grebel,

PG&E (Diablo Canyon)

State of California

Sandra Silver (Report Only)

bcc w/enclosures:

RSB/Document Control

Desk (RIDS) (IE01)

D. Persinko,

NRR

Project Inspector

Resident

Inspector

Randy

Huey

(SONGS)

G.

Cook

B. Faulkenberry

J.,Martin

Docket File

bcc w/o enclosure

B:

LFMB

M. Smith

Region V/norma

L fgQUEST

COPY ]

EQUEST

COPY ] REqUEST

COPY ] RE(VEST

COPY ]

gUEST

COPY ]

!YES j/

NO

]

ES) /

NO

/It'ES /

NO

] YES /

NO

YES'

NO

]

LMPadovan

2/ '/88

yq Iv

KEJohnston

2/]q /88

MMMendonca

2/I1 /88

i>,scv m~ 4<

j~ihi"<<w

AJohnson

2/

/88

[ S

O'O

PDR

7

YES /

NO

RPZimmdrman

2//7/88

0