Notice of Violation from Insp on 871004-1114.Violation Noted:Rcs Leakage Detection Surveillance Program Did Not Include Acceptance Criteria for Operation of Containment Fan Cooler Collection Monitoring Sys
ML16341E491
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 12/28/1987
From: Zimmerman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To:
Shared Package
ML16341E492 List:
References
50-275-87-38, 50-323-87-38, NUDOCS 8801130034
Download: ML16341E491 (2)


See also: IR 07100004/2011014

Text

APPENDIX A

NOTICE OF VIOLATION

Pacific Gas

and Electric Company

Diablo Canyon Nuclear

Power Plant

Docket Nos.

50-275

and 50-323

License

Nos.

DPR-80 and

DRP-82

During an

NRC inspection

conducted

on October

4 through

November 14,

1987,

a

violation of NRC requirements

was identified.

In accordance

with the "General

Statement

ot Policy and Procedure for NRC Enforcement Actions",:

10 CFR Part 2, Appendix

C (1987),

the violation is listed below:

10 CFR Part 50, Appendix B, Criterion V, states,

in part, that:

Activities

affecting quality shall

be prescribed

by documented

instructions,

procedures,

or drawings.

These instructions,

procedures,

or drawings shall include

appropriate quantitative or qualitative acceptance

criteria.

Contrary to the above, prior to October 14,

1987,

the licensee's

Reactor

Coolant System

leakage detection surveillance

program did not include

acceptance criteria for the operation of the containment

fan cooler

collection monitoring system.

The containment

fan cooler collection

monitoring system is specified

as

a reactor

coolant system

leakage

detection

system in Technical Specification 3.4.6. 1.

This is

a Severity Level IV violation (Supplement I) applicable to Units

1 and 2.

Pursuant to the provisions of 10 CFR 2.201, Pacific Gas

and Electric Company

is hereby required to submit a written statement

or explanation to the U.S.

Nuclear Regulatory

Commission,

ATTN:

Document Control Desk, Washington,

DC

20555 with,a copy to the Regional Administrator,

Region V, and

a copy to the

NRC Senior

Resident

Inspector,

Mr.

P.

P. Narbut, within 30 days of the date of

the letter transmitting this Notice.

This reply should

be clearly marked

as

a

"Reply to a Notice of Violation" and should include for each violation:

(1)

the reason for the violation if admitted,

(2) the corrective steps that have

been taken

and the results

achieved,

(3) the corrective steps that will be

taken to avoid further violations,

and (4) the date

when full compliance will

be achieved.

If an adequate

reply is not received within he time specified in

this Notice,

an order

may be issued to show cause

why the license

should not

be modified, suspended,

or revoked or why such other actions

as

may be proper

should not be taken.

Consideration

may be given to extending the response

time for good cause

shown.

FOR THE NUCLEAR REGULATORY COMMISSION

Dated at Walnut Creek, California

2 8 1937

R.

P.

Zimmerman,

Chief

Reactor

Projects

Branch

801130034

871228

PDR

ADOCK 05000275

0

DCD

h