ML16341E484

From kanterella
Jump to navigation Jump to search
Forwards Corrected App a Notice of Violations Encl w/871221 Memo.Word Draft Should Have Been Deleted from Top of Page
ML16341E484
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 12/31/1987
From: Pate R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Shiffer J
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16341E485 List:
References
NUDOCS 8801060096
Download: ML16341E484 (4)


Text

ACCELERA.TED

.NRIBUTION DEMON TION SYFrEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8801060096 DOC.DATE: 87/12/31 NOTARIZED-NO DOCKET FACIL:50-275 Diablo Canyon Nuclear Power Plant, Unit 1, Pacific Ga 05000275 50-323 Diablo Canyon Nuclear Power Plant, Unit 2, Pacific Ga 05000323 AUTH.NAME AUTHOR AFFILIATION PATE,R.J.

Region 5, Ofc of the Director RECIP.NAME RECIPIENT AFFILIATION SHIFFER,J.D.

Pacific Gas

& Electric Co.

SUBJECT:

Forwards corrected page of 871221 App A,notice of violation.

Word draft inadvertently left at top of page.

DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR ENCL SIZE:

TITLE *General'(50 Dkt)-Insp Rept/Notice of Vio ation R sponse NOTES R

RECIPIENT ID CODE/NAME PD5 PD INTERNAL: ACRS DEDRO NRR/DLPQ/PEB NRR/DREP/EPB NRR/DRIS DIR OE LI N,J RGN5 FILE 01 EXTERNAL: LPDR NSIC COPIES LTTR ENCL 1

1 2

2 1

1 1

1 1

1 1

1 1

1 1

1 1

1 2

2 1

1 RECIPIENT ID CODE/NAME TRAMMELL,C AEOD NRR MORISSEAU,D NRR/DOEA DIR NRR/DREP/RPB NRR/PMAS/ILRB OGC/HDS2 RES DEPY GI NRC PDR COPIES LTTR ENCL 2

2 1

1 1

1 1

1 2

2 1

1 1

1 1

1, 1

1 S

j I

R

~

1 A

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 24 ENCL 24

~I,q aa0I, io Cy o

IIA V/

~t 0**

UNITED STATES NUCLEAR.REGULATORY COMMISSION REGION V 1450 MARIALANE,SUITE 210 WAI.NUTCREEK, CALIFORNIA94596 December 31, l987 Docket No. 50-275 and 50-323 Pacific Gas and Electric Company 77 Beale Street Room 1451 San Francisco, California 94106 Attention:

Mr. J.

D. Shiffer, Vice President Nuclear Power Generation Gentlemen:

SUBJECT:

REISSUANCE OF ENCLOSURE TO'OUR MEMORANDUM ON V10LATIONS IDENTIFIED DURING INSPECTION NOS 50-275/86-33 AND 50-323/86-31 Attached is the corrected page to be inserted into our memorandum dated December 21, 1987.

The word "DRAFT" was inadvertently left at the top of the APPENDIX A, NOTICE OF VIOLATION.

Please replace with the enclosed revision.

Enclosure:

Appendix A - Notice of Violation cc w/enclosure:

S.

M. Skidmore, PG&E J.

D. Townsend, PG&E (Diablo Canyon)

R. F. Locke, PG&E D. Taggart, PG&E (Diablo Canyon)

R. Weinberg, PG&E (Diablo Canyon)

T. L. Grebel, PG&E (Diablo Canyon)

State of CA Robert J.

Pate Chief Reactor Safety Branch 8801060096 871232 PDR ADOCK 05000275 0

DCa FZi