Text
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR: 87i i090093
DOC. DATE: 87/i0/2i
NOTARIZED:
NO
DOCKET ¹
FACIL: 50-275 Diablo Canyon Nuclear
Power Plant.
Unit ii Pacific
Ga
05000275
50-323 Diablo Canyon Nuclear
Power Plant.
Unit 2i Pacific
Ga
05000323
AUTH. NAME
AUTHOR AFFILIATION
ZIMMERMANiR. P.
Region
5i
Ofc of the Director
RECIP. NAME
RECIPIENT AFFILIATION
SHIFFERi J. D.
Pacific
Gas
Sc Electric
Co.
SUBJECT:
Forwards
Insp Rept 50-275/87-34
0 50/323/87-34
on
87008i6-i003. No violations noted.
DISTRIBUTION CODE:
IEOiD
COPIES
RECEIVED: LTR
~
ENCL J
SIZE: +
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:
REC IPIENT
ID CODE/NAME
PD5
INTERNAL: ACRS
DEDRO
NRR/DOE* DIR
NRR/DREP /RP B
NRR/PMAS/ILRB
OGC/HDS2
DEPY GI
TERNAL:
LPDR
COPIES
LTTR ENCL
i
i
2
2
i
ii
2
2i
i
i
i
i
2
2
i
i
RECIPIENT
ID CODE/NAME
TRAMMELLED C
NRR MORISSEAUi D
NRR/DREP/EPB
NRR/DRIS DIR
OE LIEBERMANiJ
G F
5
FILE
Oi
NRC
COPIES
LTTR ENCL
2
2
i
i
i
i
i
1
ii
i
i
i
i
i
i
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
23
ENCL
23
'
OCT 211987
Docket Nos.
50-275
and 50-323
Pacific Gas
and Electric Company
77 Beale Street,
Room 1451
San Francisco,
California 94106
Attention:
Mr. J.
D. Shiffer, Vice President
Nuclear
Power Generation
Gentlemen:
Subject:
NRC Inspection of Diablo Canyon Units 1 and
2
This refers to the
a routine inspection
conducted by'essrs.
P.
P. Narbut,
L.
M.
Padovan,
and
K.
E. Johnston
during the period of August 16 through October
3,
1987.
This inspection
examined your activities as authorized
by NRC
License
Nos.
At the conclusion of the inspection,
discussions
of their findings were held with Mr. J.
D. Townsend,
and other
members of your staff.
Areas
examined during this inspection
are described
in the enclosed
inspection
report.
Within these
areas,
the inspection consisted of selective
examinations
of procedures
and representative
records,
interviews with
personnel,
and observations
by the inspectors.
No violations of NRC requirements
were identified within the scope of this
inspection.
In accordance
with 10 CFR 2.790 (a),
a copy of this letter and the enclosures
will be placed in the
NRC Public Document
Room.
Should you have any questions
concerning this inspection,'e
would be pleased
to discuss
them with you.
Sincerely,
~
~
~
~
R.
P.
Zimmerman, Chief
Reactor Projects
Branch
Enclosures:
Inspection
Report Nos.
50-275/87-34
and 50-323/87-34
871g0900~~
85000275
87i021
@DR
@DOCK, 0
pDH
OCT 21 198?
-2"
cc w/enclosure:
S.
D. Skidmore,
R.
F.
Locke,
J.
D. Townsend,
PG&E (Diablo Canyon)
D.
A. Taggert,
PG&E (Diablo Canyon)
R.
S. Meinberg,
PG&E (Diablo Canyon)
T.
L. Grebel,
PG&E (Diablo Canyon)
State of California
Sandra Silver (Report Only)
bcc w/enclosure:
docket file
Resident Inspector
Project Inspector
G.
Cook
B. Faulkenberry
J. Martin
D. Persinko,
bcc w/o enclosure:
LFMB
M. Smith
REGION V/dot
LPadovan tt P
KJohnaton
10/~/87
10/W/87
gPR
PNarbut
MMendonca
RZimmerman
10/+/87
. 10/W/87
10/a I/87
COPY ]
EST
COPY ]
RE
COPY ]
COPY ] REqUEST
OPY ]
YES /
NO
YES /
NO
ES /
NO
YES /
NO
YES /
TO
YES /
NO