ML16341E418

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-275/87-34 & 50/323/87-34 on 870816-1003.No Violations Noted
ML16341E418
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 10/21/1987
From: Zimmerman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Shiffer J
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16341E419 List:
References
NUDOCS 8711090093
Download: ML16341E418 (6)


See also: IR 05000275/1987034

Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR: 87i i090093

DOC. DATE: 87/i0/2i

NOTARIZED:

NO

DOCKET ¹

FACIL: 50-275 Diablo Canyon Nuclear

Power Plant.

Unit ii Pacific

Ga

05000275

50-323 Diablo Canyon Nuclear

Power Plant.

Unit 2i Pacific

Ga

05000323

AUTH. NAME

AUTHOR AFFILIATION

ZIMMERMANiR. P.

Region

5i

Ofc of the Director

RECIP. NAME

RECIPIENT AFFILIATION

SHIFFERi J. D.

Pacific

Gas

Sc Electric

Co.

SUBJECT:

Forwards

Insp Rept 50-275/87-34

0 50/323/87-34

on

87008i6-i003. No violations noted.

DISTRIBUTION CODE:

IEOiD

COPIES

RECEIVED: LTR

~

ENCL J

SIZE: +

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

NOTES:

REC IPIENT

ID CODE/NAME

PD5

PD

INTERNAL: ACRS

DEDRO

NRR/DOE* DIR

NRR/DREP /RP B

NRR/PMAS/ILRB

OGC/HDS2

RES

DEPY GI

TERNAL:

LPDR

NSIC

COPIES

LTTR ENCL

i

i

2

2

i

ii

2

2i

i

i

i

i

2

2

i

i

RECIPIENT

ID CODE/NAME

TRAMMELLED C

AEOD

NRR MORISSEAUi D

NRR/DREP/EPB

NRR/DRIS DIR

OE LIEBERMANiJ

G F

5

FILE

Oi

NRC

PDR

COPIES

LTTR ENCL

2

2

i

i

i

i

i

1

ii

i

i

i

i

i

i

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

23

ENCL

23

'

OCT 211987

Docket Nos.

50-275

and 50-323

Pacific Gas

and Electric Company

77 Beale Street,

Room 1451

San Francisco,

California 94106

Attention:

Mr. J.

D. Shiffer, Vice President

Nuclear

Power Generation

Gentlemen:

Subject:

NRC Inspection of Diablo Canyon Units 1 and

2

This refers to the

a routine inspection

conducted by'essrs.

P.

P. Narbut,

L.

M.

Padovan,

and

K.

E. Johnston

during the period of August 16 through October

3,

1987.

This inspection

examined your activities as authorized

by NRC

License

Nos.

DPR-80 and DPR-82.

At the conclusion of the inspection,

discussions

of their findings were held with Mr. J.

D. Townsend,

and other

members of your staff.

Areas

examined during this inspection

are described

in the enclosed

inspection

report.

Within these

areas,

the inspection consisted of selective

examinations

of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspectors.

No violations of NRC requirements

were identified within the scope of this

inspection.

In accordance

with 10 CFR 2.790 (a),

a copy of this letter and the enclosures

will be placed in the

NRC Public Document

Room.

Should you have any questions

concerning this inspection,'e

would be pleased

to discuss

them with you.

Sincerely,

~

~

~

~

R.

P.

Zimmerman, Chief

Reactor Projects

Branch

Enclosures:

Inspection

Report Nos.

50-275/87-34

and 50-323/87-34

871g0900~~

85000275

87i021

@DR

@DOCK, 0

pDH

OCT 21 198?

-2"

cc w/enclosure:

S.

D. Skidmore,

PG&E

R.

F.

Locke,

PG&E

J.

D. Townsend,

PG&E (Diablo Canyon)

D.

A. Taggert,

PG&E (Diablo Canyon)

R.

S. Meinberg,

PG&E (Diablo Canyon)

T.

L. Grebel,

PG&E (Diablo Canyon)

State of California

Sandra Silver (Report Only)

bcc w/enclosure:

docket file

Resident Inspector

Project Inspector

G.

Cook

B. Faulkenberry

J. Martin

D. Persinko,

NRR

bcc w/o enclosure:

LFMB

M. Smith

REGION V/dot

LPadovan tt P

KJohnaton

10/~/87

10/W/87

gPR

PNarbut

MMendonca

RZimmerman

10/+/87

. 10/W/87

10/a I/87

ST

COPY ]

EST

COPY ]

RE

ST

COPY ]

ST

COPY ] REqUEST

OPY ]

YES /

NO

YES /

NO

ES /

NO

YES /

NO

YES /

TO

PDR

YES /

NO