ML16341E388
| ML16341E388 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 07/30/1987 |
| From: | Pate R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Shiffer J PACIFIC GAS & ELECTRIC CO. |
| Shared Package | |
| ML16341E389 | List: |
| References | |
| NUDOCS 8708140109 | |
| Download: ML16341E388 (6) | |
See also: IR 05000275/1987027
Text
PEGULATORY I NFORiMATION
D ISTR I BUT ION SYSTEM
( R IDS )
ACCESSION
NBR
FACIL: 50-275
I
50-323
AUTH. NAME
PATEI R. T.
RECIP. NAME
SH IFFER i J. D.
870614010?
DOC. DATE: 87/07/30
NOTARIZED:
NO
Diablo Canyon
Nuc lear
Power
Plant'ni t
1 i PaciFic
Ga
Diablo
Canlg on
Nuc lear
Power
P lant'nit 2i
Pac ifi c
Ga'UTHOR
AFFII IATION
Region
Si
Office of DiTector
REC IP IENT AFFILIATION
Pacific
Gas
5 Electric
Co.
4
DOC/ET
05000275
05000323
SUBJECT:
Forwards
lnsp Repts
50-275/87-27
& 50-323/87-27
on
87070&-10, No violations noted.
DISTRIBUTION CODE;
IE01D
COPIES
RECEIVED: LTR
ENCL
SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
REC IP IEflT
I D CODE/tuAME
COP IES
LTTR ENCL
1
RECIPIENT
ID CODE/NAME
TRAMMELLED C
COPIES
LTTR ENCL
2
2
INTERNAL:
DEDRO
NPR/DOEA DIR
NRR/DREP/RPB
NRR/PMiAS/ ILRB
OGC/HDS2
Di PY
1
1
1
1
1
1
MORISSEAUi D
NRR/DREP/EPB
NRR/DRIS DIR
9
BERMANiJ
EG FI
RGN5
FILE
01
1
1
1
1
1
1
1
1
1
1
1
1
1
1
'TERNAL:
LPDR
NRC
TOTAL NUMBER OF
COP lES REGUIPED;
LTTR
23
ENCL
23
~
'
'
JUL 30 l987
Docket No. 50-275,
50-323
Pacific Gas
and Electric Company
77 Beale Street,
Room 1451
San Francisco,
California 94106
Attention:
Mr. J.
D. Shiffer, Vice President
Nuclear
Power Generation,
Licensing
Gentlemen:
SUBJECT:
NRC INSPECTION
OF DIABLO CANYON UNITS 1 AND 2
This refers to the inspection
conducted
by Mr.
C.
Ramsey of this office
during July 6 through 10, 1987, of activities authorized
by NRC License
Nos.
DPR-80 and
and to the discussion
of our findings with
Mr.
R. Thornber ry, and other
members of your staff on July 10,
1987.
Areas
examined during this inspection
are described
in the enclosed
inspection report.
Mithin these
areas,
the inspection consisted of selective
examinations
of procedures
and representative
records,
interviews with
personnel,
and observations
by the inspector.
As discussed
in paragraphs
3.A(3) and 3.A(4) of the report,
concern
was expressed
by the inspector
regarding the availability of manpower for manual firefighting in plant vital
areas
as
a result of expanded fire brigade responsibilities
away from the
immediate plant site
and the reliability of offsite fire department
assistance.
The voluntary steps
you have taken to address
this concern will
be reviewed during future
NRC inspections.
No violations of NRC requirements
were identified within the scope of this
inspection.
In accordance
with 10 CFR 2.790(a),
a copy of this letter and the enclosure
will be placed in the
NRC Public Document
Room.
Should you have
any questions
concerning this inspection,
we will be glad to
discuss
them with you.
Sincer ely,
Robe
J.
Pate,
hief
Reactor Safety Branch
Enclosure:
Inspection
Report
Nos.
50-275/87-27,
50-323/87-27
e>Oe>4O>
O<z a7OnO
ADGCl( 05000. 'i'5
6
Pl)rl
i l
/Egg
JUL 30 1987
-2-
cc w/enclosure:
S.
M. Skidmore,
R.
C. Thornberry,
Plant Manager,
PG8E (Diablo Canyon)
R.
F.
Locke,
PG8 E
D. Taggart,
PG&E (Diablo Canyon)
R. Weinberg,
PG8E (Diablo Canyon)
T.
L. Grebel,
PG&E (Diablo Canyon)
State of California
S. Silver (Report only)
bcc w/enclosure:
RSB/Document Control
Desk (RIDS) (IEOl)
Project Inspector
Resident
Inspector
G.
Cook
B. Faulkenberry
J. Martin
Docket File
bcc w/o enclosure:
LFMB
M. Smith
Region
V
E VEST COPY ]