ML16341E268

From kanterella
Jump to navigation Jump to search
Grants Concurrence for Unit to Return to mid-loop Operations for Current Outage.Insps Have Verified That Util Has Acceptably Completed Actions for mid-loop Operations,Per NRC 870506 Confirmation of Actions Noted in
ML16341E268
Person / Time
Site: Diablo Canyon Pacific Gas & Electric icon.png
Issue date: 05/30/1987
From: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Shiffer J
PACIFIC GAS & ELECTRIC CO.
References
EA-87-067, EA-87-67, NUDOCS 8706100091
Download: ML16341E268 (4)


Text

ACCESSION NBR:

FAC IL: 50-323 AUTH. NAME MARTINiJ. B.

RECIP. NAME SHIFFER. J. D.

REGULATORY '%FORMATION DISTRIBUTION SY~

EM (RIDS) 8706100091 DOC. DATE: 87/05/30 NOTARIZED:

NO DOCKET Diablo Canyon Nuclear Power Plant'nit 2i Paci fic Ca 05000323 AUTHOR AFFILIATION Reg ion Si Office of Direc tor RECIPIENT AFFILIATION Paci fic Qas 8r Electric Co.

SUBJECT:

Grants concurrence for Unit 2 to return to mid-loop operations for current outage. Insps have verified that util has acceptably completed actions for mid-loop operations.

DISTRISUTION CODE:

IE35D COFIES RECEIVED: LTR I

ENCL D SIIE:

TITLE: Emergency Preparedness-Appraisal/Confirmatory Action Ltr/Exercise Rep NOTES:

RECIPIENT ID CODE/NAME PD5 LA SCHIERLINQi H INTERNAL: ARM/DAF/LFMB NRR/PMAS/ ILRB RQN5 FILE EXTERNAL:

LPDR NSIC COPIES LTTR ENCL RECIPIENT ID CODE/NAME PD5 PD TRAMMELLJ C N

R P/EPB EG FILE 02 RGN2/DRSS/EPRPB NRC PDR COPIES LTTR ENCL 0

TOTAL NUMBER OF COPIES REQUIRED:

LTIR 14.

ENCL

l

MPiY 3 0 1987 Docket No. 50-323 Pacific Gas 5 Electric Company 77 Beale Street, Room 1451 San Francisco, California 94106 Attention:

Mr. J.

D. Shiffer, Vice President Nuclear Power Generation Gentlemen:

Subject:

Rescission of Confirmatory Action Letter on Return to Mid-Loop Operation By letter dated May 6, 1987 (EA-87-67), this office confirmed actions taken or to be taken by Pacific Gas and Electric prior to the return to mid-loop operations on Diablo Canyon Unit 2 in accordance with your letter of May 4, 1987.

PGIEE's letter dated May 18, 1987 confirmed that those actions would be completed prior to resumption of mid-loop operation.

Our inspections have verified that PGdmE has acceptably completed the actions for mid-loop operations.

Therefore, in accordance with our May 6 letter, concurrence is granted for Unit 2 to return to mid-loop operations for the current outage.

Sincerely, J.

B. Martin Regional Administrator CC:

R.

C. Thornberry, PGIIE (Diablo Canyon)

State of CA F. J. Miraglia, NRR/ADP C.

M. Trammell, NRR/PD5 P.

P. Narbut, RV (Diablo Canyon) 8 E.e.

6

~ C~k, R'~

RV/jk S

CPY YES /

NO C

YES /

NO

&~+~ NENOONCA W

CNAFFEE r

5 giP 2

5/Pf/87 5/

/87 870610007l 870530 PDR ADOCK 05000323 PDR KIRSCH El+/87 CREWS 5/Zw/87 MARTIN 5/g /87 Q

YES /

NO YES /

NO YES /

NO TO PDR YES NO 7j /p~k~

~gs r r~pss Pipes /QAA, soF Ciufc4~

~j>i181

~p r sr/ n