g4~
A'CCESSI OiN NBR
FACIL: 50-275
50-323
A'JTH. NANE
I',IRSCHi D. F.
REC IP. NAYiE
SHIFFERi J. D.
REGULATORY IN ORYiATIQN DISTRIBUTION SYSTF"i (RIDS)
8704< 90266
DQC. DATE: 87/04/14
NOTARI ZED:, NO
Diablo Canuon Nuclear
Power Planti Unit. li Pacific
Ga
Diablo Canuon
Nucleav
Power Planti Unit 2
Pacific
Ga
AUTHOR *FFILIATI QN
Region
5i
Office of Director
REC IP IENT AFFILIATION
Pac i fic Gas
'.! Electric
Co.
DOCKET
05000275'5000323
SUBJECT:
Forwards
Insp
Repts
50-275/87-08
ic 50-323/87-07
on 8702'L'7-26
DISTRIBUTION CODE:
IE01D
COPIES
RECEIVED: LTR
ENCL
SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice
of Violation Response
NOTES:
RECIPiENT
I D CODE/NAf'IE
PD5 LA
SCHIERLING, H
I NTERNAL'.
DEDRO
ROE> N. L
NRR/DREP /EP B
I"RR/DR I S
D IR
QGC/HDS2
SPE IS) T
COPIES
LTTR ENCL
1
0
1
1
REC IP IENT
ID CODE/NAI"iE
PD5
TRAYiNELL~ C
AEQD
ENF LIEBERYiAN
NRR/DQEA DlR
NRR/DREP/RPB
'R
4
LRB
G
F II
RGN5
F ILE
01
COP IES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
RNAL'PDR
NRC
TOTAL NUYiBER Or
CQP IES REQUIRED:
LTTR
24
ENCL
23
C Q
APR i4 1987
Docket Nos.
50-275
and 50-323
Pacific
Gas
and Electric Company
77 Beale Street,
Room 1451
San Francisco,
94106
Attention;
Mr. J.
D. Shiffer, Vice President
Nuclear
Power Generation
Gentlemen:
Subject:
NRC Inspection of Diablo Canyon Units
1 and
2
This refers to the special
inspection,
conducted
by Messrs.
P.
P. Narbut,
J. L. Crews,
A. D. Johnson
and
R.
P. Correia during the period of February
19
through 26,
1987.
This inspection
examined your activities
as authorized
by
NRC License
Nos.
and DPR-82.
At the conclusion of the inspection,
discussions
of their findings were held with Mr. J.
M. Gisclon,
and other
members of your staff.
Areas
examined during this inspection
are described
in the enclosed
inspection
report.
Within these
areas,
the inspection consisted of selective
examinations
of procedures
and representative
records,
interviews with
personnel,
and observations
by the inspectors.
Based
on the results of this inspection, it appears
that
one of your
activities
was not conducted
in full compliance with NRC requirements,
as set
forth in the Notice of Violation, enclosed
herewith
as Appendix A.
Your
response
to this notice is to be submitted in accordance
with the provisions
of 10 CFR 2.201
as stated in Appendix A, Notice of Violation.
The violation identifi'ed in the enclosed
notice resulted
from a concern
brought to our inspectors'ttention
during the course of the current
inspection.
In pursuing the concern
brought to their attention our inspectors
concluded that ineffective communication
between
the
gC and Maintenance
departments
was
a significant factor contributing to the delay of
approximately
a year in resolving the
gC department's'oncern
in this
instance.
In your response
to the enclosed
notice you should discuss
the
significance of the circumstances
surrounding this violation, and the apparent
excessive
delays that have occurred in resolving adverse quality findings in
this instance
as well as similar instances
discussed
in Section
5.C of the
enclosed
inspection report.
8704wgQP+6
8704 1 4
ADOCK 05000275
t g
-2-
The enclosed
inspection report also includes
the observation
by our inspectors
of a need
on the part of PG&E management
at all levels to increase their
sensitivity to circumstances
which may suggest
the lack, or lessening,
of
appropriate
support for the quality organizations
associated
with the Diablo
Canyon plant.
In your response
to this letter, please
discuss
the steps
you
are taking, or plan to take, in this regard.
Your response
should describe
how you intend to seek out the root causes
for such circumstances
at all
levels of management,
and,
having
done so,
how you expect to improve the
performance of management
in acting in a timely and appropriately aggressive
way to correct those conditions.
In accordance
with 10 CFR 2.790(a),
a copy of this letter and the enclosures
will be placed in the
NRC Public Document
Room.
The responses
directed
by this letter are not subject to the clearance
procedures
of the Office of Management
and Budget
as required
by the Paperwork
Reduction Act of 1980,
PL 96-511.
Should you have
any questions
concerning this inspection,
we are willing to
discuss
them with you.
incerply,
.
riJina':(on.'9
by
'P,
1', J.'ir:cubi
D. F. Kirsch, Director
Division of Reactor
Safety
and Projects
Enclosures:
1.
Appendix
2.
Inspection
Report Nos. 50-275/87-08
and 50-323/87-07
cc w/enclosures:
S.
M. Skidmore,
R.
C. Thornberry,
PG&E (Diablo, Canyon)
R.
F. Locke,
D. Taggart,
PG&E (Diablo, Canyon)
R. Weinberg,
PG&E (Diablo Canyon)
State of CA
bcc w/enclosures:
RSB/Document Control
Desk
(RIDS)
Project Inspector
Resident
Inspector
G.
Cook
B. Faulkenberry
J. Martin
docket file
bcc enclosure
only:
Sandra Silver
t, w
I
-3-
bcc w/enclosure
1:
M. Smith
LFMB
REGION
giflsv I
/87
Narbut
g/( /87
MMendonca
gt)qts~
DKirsch
EQUES
C
P
REQUEST
C
PY
'ST
C
PY
R
VEST
C
PY
VEST
YES /
NO
YES /
NO
.
YES /
NO
YE
/
NO
YES /
NO
RMarsh
$/
/87QJ
YES /
NO
YES /
NO
8