Forwards Insp Repts 50-275/87-10 & 50-323/87-09 on 870208-0314.No Violations Noted.Rept Identifies Two Examples When Informal or Second Hand Communications Adversely Affected Quality of Work or Operations
ML16341E160
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 03/31/1987
From: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Shiffer J
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16341E161 List:
References
NUDOCS 8704210095
Download: ML16341E160 (6)


See also: IR 05000275/1987010

Text

REGULATORY INFORNATION DISTRIBUTION SYSTEN

(R IDS)

I

ACCESSION

NBR: 8704210095

DOC. DATE: 87/03/31

NOTARIZED:

NO

DOCKET ll

FACIL: 50-275 Diablo Canyon Nucleal

Pcuer

Plant>

Unit I>

Pac jfic Ga

05000275

~

50-323 Diablo Canyon Nuclear

Pouer

Plant'>

Unit 2>

Paci fic Ca

05000323

H. NANE

AUTHOR AFFILIATION

SCH> D. F.

Regi on

5> OfFice of Director

REC IP. NAI'1E

REC 1P IENT AFFILIATI OJN

SHIFFER> J. D.

Pacific

Gas

h Electric

Co.

SUBJECT:

Forwards

Insp Repts

50-275/87-10

5 50-323/87-09

on

870208-0314.

No. violations noted. Rept identifi es

two exarp les

when inFormal or second

hand

communications

adverse lg

affected quality of work or operations.

DISTRIBUTION CODE:

IEOID

COPIES

RECEIVED: LTR

I

ENCL

1

SIZE: 8+~9

TITLE: General

<50 Dkt)-Insp Rept/Notice of Violation Response

NOTES:

RECIPIENT

ID CODE/NAl'1E

PD5 LA

SCHIERLING> H

INTERNAL:

ACRS

DEDRO

NRR

ROE> ll. L

NRR/DOEA DIR

NRR/DREP/RPB

1'LRB

RGN5

FILE

01

EXTERNAL:

LPDR

NSIC

COPIES

LTTR ENCL

1

0

1

2

2

1

1

1

1

1

2

2

1

1

1

1

1

2

2

1

1

RECIPIENT

ID CODE/NANE

PD5

PD

TRAMMEL>C

AFOD

EN

LIEBERMAN

NRR/ADT

NRR/DREP/EPB

NRR/DRIS DIR

OGC/HDS2

RES

SPEISJ T

NRC

PDR

COP IES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1

1

1

1

TOTAL NUl")BER OF COPIES

REQUIRED:

LTTR

25

ENCL

24

0

) N

0

Docket Nos.'0-275

and 50-323

Pacific

Gas

and Electric Company

77 Beale Street,

Room 1451

San Francisco,

California 94106

Attention:

Nr. J.

D. Shiffer, Vice President

Nuclear

Power Generation

Gentlemen:

Subject:

NRC Inspection of Diablo Canyon Units

1 and

2

This refers to the

a routine inspection,

conducted

by Messrs.

P.

P. Narbut,

L. N. Padovan,

and

K. E. Johnston

during the period of February

8 through

March 14,

1987.

This inspection

examined your activities

as authorized

by

NRC

License

Nos.

DPR-80

and DPR-82.

At the conclusion of the inspection,

discussions

of their findings were held with kr.

R.

C. Thornberry,

and other

members of your staff.

Areas

examined during this inspection

are described

in the enclosed

inspection

report.

Within these

areas,

the inspection consisted of selective

examinations

of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspectors.

This inspection report identifies

two examples of instances

where informal or

second

hand communicatiors

adversely affected quality of'ork or operations.

Specifically,

1) miscommunications

between

maintenance

engineering

and

maintenance

mechanics

resul.ted

in an inaccurate quality evaluation for Unit

1

auxiliary saltwater valve 1-FCV-602,

and 2) miscommunications

between

a shift

foreman

and

a control operator resulted in

a Unit 2 reactor trip when turbine

roll-up was

begun while the shift foreman

and other operators

were involved in

a shift briefing.

Previous

examples of adverse

miscommunications

affects

include operations

placing the control

rods in automatic control while ISC

technicians

had automatic control in a test condition (Inspection

Report

Nos. 50-275/87-04

and 50-323/87-04)

and erroneous

corrective actions listed in

the nonconformance

report issued for the containment air lock door incident

(Inspection

Report Nos. 50-275/86-29

and 50-323/86-27).'ccordingly,

we

request that you provide

a written response

describing appropriate

actions

to prevent the repetition of further instances

of informal or second

hand

comounications

in order to preclude additional

adverse affects

on plant

operations

or the quality of work performed at Diablo Canyon.

No violations of NRC requirements

were identified within the scope of this

inspection.

In accordance

with 10 CFR 2.790 (a),

a copy of this letter and the enclosures

will be placed in the

NRC Public Document

Room.

87p~pg0095

870331

PDR

POOCH 05000275

G

PQR

Should you have

any questions

concerning this inspection,

we are willing to

discuss

them with you.

Sincerely,

D. F. Kirsch, Dir ctor

Division of Reactor Safety

and Projects

Enclosures:

Inspection Report Nos. 50-275/87-10

and'50-323/87-09

cc w/enclosure:

S.

D. Skidmore,

PG&E

R.

F. Locke,

PG&E

R.

C. Thornberry,

PG&E (Diablo Canyon)

D. A. Taggert,

PG&E (Diablo Canyon)

R. S. Weinberg,

PG&E (Diablo Canyon)

State of California

Sandra Silver (Report Only)

bcc w/enclosure:

RSB/Document Control

Desk

(RIDS)

( IE01)

Project Inspector

Resident

Inspector

R. Huey

(SONGS)

G.

Cook

B. Faulkenberry

J. Hartin

Docket File

bcc w/o enclosure:

LFHB

H. Smith

Region

V

ST

COPY

EST

COPY

R

ST

COPY

ST

COPY

YES

NO

YES

NO

E

NO

-

YES

NO

w+

LHPadovan

KEJohnston

PPNarbut

MHHendonca

3/3b /87

3Q u /87

3/ K/87

3/g o/87

ST

COPY

YES

NO

T

PDR

YES

NO

ff

3/f

87