ML16341D319
| ML16341D319 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 06/27/1985 |
| From: | Kirsch D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Shiffer J PACIFIC GAS & ELECTRIC CO. |
| Shared Package | |
| ML16341D320 | List: |
| References | |
| NUDOCS 8507230298 | |
| Download: ML16341D319 (2) | |
See also: IR 05000275/1985015
Text
JUN P"! )986
Docket No. 50-275/8~ I~
Pacific
Gas
and Electric Company
77 Beale Street,
Room 1435
San Francisco,
California 94106
Attention:
Mr. J.
D. Shiffer, Vice President
Nuclear Power Generation,
Licensing
Gentlemen:
Subject:
NRC Inspection of Containment Integrated
Leak Rate Test,
Diablo Canyon Unit
1
This refers to the inspection
conducted
by Mr. C. Clark of this office on
April 8-13'985, of activities authorized by NRC License
No. DPR-80 and to
the discussion of our findings held with Mr. L. Womack and other members of
your staff at the conclusion of the inspection.
Areas
examined during this inspection are'escribed
in the enclosed inspection
report.
Within these
areas,
the inspect'.ion consisted
of selective
examinations
of procedures
and representative
records,
interviews with
personnel,
and observations
by the inspector.
No violations of NRC requirements were'dentified within the scope of this
inspection.
e
In accordance
withe'10 CFR<<2.790(a)',
a copy of this letter and the enclosure
will be placed in the NRC'Public Document Room.
i
Should you h'ave any questions
concerning this, inspection
we will be glad to
discuss
them with you.
DKirsch
6/W /85
Sincerely,
D. F. Kirsch, Acting Director
Division of Reactor Safety and Projects
Enclosure:
Inspection Report No. 50-275 85-15
CC:
D. Vollmer, NRR
S.
D. Skidmore,
PGSZ
R.
C. Thornberry,
(Diablo Canyon)
P. A. Crane,
PGSE
C.
M. Seward,
(Diablo Canyon)
R. Weinberg,
(Diablo Canyon)
State of CA
Sandra Silver (report only)
bcc:
RSB/Document Control Desk
(RIDS
Mr. J. Martin;
Resident
Inspecto
RV
CClark:dh
TYou g
RDod
6/ZQ /85
6/gg /85
6/
/85
8507230298
850627
ADOCK 05000275
ig,
43
4J