ML16341C995

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-275/79-07 & 50-323/79-05 on 790326-29 & 0405-06.No Noncompliance Noted
ML16341C995
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 05/11/1979
From: Spencer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Crane P
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16341C996 List:
References
NUDOCS 7910240107
Download: ML16341C995 (4)


See also: IR 05000275/1979007

Text

~P,A R900 'Ip0

OOj

+**+4'NITED

STATES

NUCLEAR REGULATORY COMMISSION

REGION V

SUITE 202, WALNUTCREEK PLAZA

1990 N. CALIFORNIABOULEVARD

WALNUTCREEK, CALIFORNIA 94596

May 11,

1979

Docket Nos.

50-323

Pacific Gas

and 'Electric Company

77 Beale Street

San Francisco, California

94106

Attention:

Mr. Philip A. Crane, Jr.

Assistant

General

Counsel

Gentlemen:

Subject:

NRC Inspection of Diablo Canyon Units

1

and

2

This refers to the inspection

conducted

by Messrs.

D. F. Kirsch,

T.

W. Hutson,

D. P. Haist and

G. Hernandez of this office on March 26-

29, and April 5-6,

1979 of activities authorized

by

NRC Construction

Permit Nos.

CPPR-39

and

CPPR-69,

and to the discussion of our findings

held by Mr. Kirsch with Messrs.

R. Etzler, J.

Hoch and other members of

your staff at the conclusion of the inspection.

Areas

examined during this inspection

are described

in the enclosed

inspection report.

Within these

areas,

the inspection consisted of

selective examinations of procedures

and representative

records, in-

terviews with personnel,

and observations

by the inspectors.

No items of noncompliance with NRC requirements

were identified within

the scope of this inspection.

In accordance

with Section 2.790 of the

NRC's "Rules of Practice,"

Part 2, Title 10,

Code of Federal

Regulations,

a copy of this letter and

the enclosed

inspection report will be placed in the NRC's Public

Document

Room. If this report contains

any information that you belieI"

to be proprietary, it is necessary

that you submit a written appliI

Ion

'o this office, within 20 days of the date of this letter, requesting

that such .information be withheld from public disclosure.

Th'e application

must include

a full statement of the reasons

why it is claimed that the

information is proprietary.

The application should

be prepared

so that

Pacific Gas

and Electric Company

-2-

Hay 11, 1979

any proprietary information identified is contained in an enclosure

to

the application,

since the application without the enclosure will also

be placed in the Public Document

Room. If we do not hear from you in

this regard within the specified period,

the report will be placed in

the Public Document

Room.

Should you have any questions

concerning this inspection,

we will be

glad to discuss

them with you.

Sincerely,

Enclosure:

IE Inspection Report

Nos. 50-275/79-07

50-323/79-05

cc w/o enclosure

W. A. Raymond,

PGSE

J.

D. Worthington,

PGSE

'R.

D. Ramsay,

PGSE (Avila Beach)

cc w/enclosure

R.

D. Etzler,

PG8E (Diablo Canyon)

J.

B. Hoch, Project Engineer,

PG8E

G. S.

Sp neer, Chief

Reactor Construction and-

Engineering

Support Branch