ML16341B857
| ML16341B857 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 10/06/1982 |
| From: | Eisenhut D Office of Nuclear Reactor Regulation |
| To: | Ahearne J, Gilinsky V, Palladino N NRC COMMISSION (OCM) |
| Shared Package | |
| ML16340C902 | List: |
| References | |
| TASK-AS, TASK-BN82-102 BN-82-102, NUDOCS 8211010092 | |
| Download: ML16341B857 (6) | |
Text
'1 Docket No.:
50-275 FROM:
YZIIORAtJDUtt FOR:
Chairman Pall adino Commissioner Gi1insky Commissioner Ahearne Commissioner Roberts Commissioner Asselstfne Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation
SUBJECT:
INFORMATION ITEMS REGARDING THE DESIGN VERIFICATION-PROGRAM - PHASE I FOR DIABLO CANYON, UNIT 1 (Board tJotf ficatfon No. 82-/o4 In accordance with present NRC procedures for Board Notifications, the following is enclosed for information of the Commfssion:
1.
Teledyne Engineering Services, IDVP Semi-tIonthly Report, September 24, 1982.
2.
Teledyne Engineering Services, Program Plan for Construction guality Assurance Audit, September 25, 1982.
Enclosure 1 provides information on the status of activities performed under the Independent Design Verification Program - Phase I and Phase II by all IDVP organizations.
Enclosure 2 presents the program plan for an audit of the quality assurance program of Diablo Canyon Unit 1 construction activities and the implementation of tt>e program.
This gA audit was dfscussed by Pacific Gas and Electric Company at.a meeting with the NRC on September 1,
1982 (See Board Notification 82-95).
The information is relevant to the safety issue on the design adequacy of Diablo Canyon Unit 1.
This is the subject of Commission Order CLI-81-30 whfct> is the basis for the IDVP.
The staff fs evaluating the information as part of its ongoing review of the IDVP efforts and will report on the results f 8211010092 82g00g PDR *DOCK 05000275 PDR OFFICE/
SURNAME $
DATE 5
~ G 43nta etI0 ~ ~ 0 ~ 0 ~
..Hans..Baht.ar.
X27238 0 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ ~ ~ ~ ~ ~
~ ~ ~
~ ~ ~ ~ 0 ~ 02
~ 0 ~ ~ 0 ~ ~ ~ ~
~\\ ~ ~ ~ ~ ~ ~
..J
~ ~ ~ ~ ~ ~ ~
0
~ ~It~ 0 ~ 0 ~ ~ ~ ~ 00 ~ 0 ~ ~ ~ ~ 0 ~ 0 ~
(
~ ~ ~
~
0 ~ 0 ~ ~ 0 ~ 0 ~ 00 ~
~ 0 F06
~ 0 otot tooted oooo t
~ hatt 00
~ ~ ~
~ ~ ~
~ 0 ~ 0 ~ 0 ~\\ ~ 0 ~ 0 ~ 0 ~ 0 ~ 0 ~\\ ~ 0 ~ ~
0'0 00Vfee ootto ~
0 ~ 0 F 0
~
~ 0 ~ ~ ~ ~
~ 0 ~ ~ 0 ~ oooteoooee ~ 0000000 NRG FORM 318 (10-80) NRCM 0240 OFFICIAL RECORD COPY USQ PD: 1281~t260
I q V
,E
4 The CotFmission prior to reinstatement of the license.
The material does not pertain to those matters that were resolved by ALAB 64II.
lHZ Sle,Ded bV 6 pgsEanutJ Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation
Enclosures:
As stated cc:
ASLB ASLBP SECY OGC OPE Board Service List OFFICEI SUANAME$
DATE0
.Ol.:.I.APB..
chierlin 9/ $a/82 I,.
~
~
~
~ ~
~ o J
i
~ os
~
o ~ o ~ ~ ~ ~ ~ ~
82 o \\
~ ~ \\ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~
1
~ o ~ ~ ~ ~ ~ o ~\\
T ak
~ o
\\ ~
o ~ oooo ~ o ~ o ~\\ ~ o ~ ~ ~
/82 OLLl
~
oo ~ ~
~ ~ o ~ oo D
ut
~ ~ o ~
o ~ ooo\\oo ~ oo ~ oooo
//82
~ ~ oR5 ~ ~ ~ ~ ~ ~ ~ ~ ~ o ~ ~ ~ ~ ~ ~ o ~
~
~ o ~ ~ ~
~ os
~ ~ o ~ ~ ~ ~
~ ~ ~ ~
~ os
~ ~
~ o ~ ~ ~ o ~ ~ ~ o ~
~ oo ~ ~ ~ o ~ ~ ~ ~ ~ ooooo ~ o ~ ooo ~
o ~ ~ o ~ ~ o ~ ~ o ~ ~ ~ ~ o ~ ~ ~ ~ ~ ~ ooo
~ o ~ ~ ~ ~ ~ ~ ~ ~ ~
~ ~ ~ ~ oo ~ o ~ o ~ O NAG FOAM 318 00-80) NACM 0240 0 FF ICIAL R ECOR D CO PY VSGPO: 1981~5.960
~
4
'I 1
J'I
+
7
~ ~
Date:
6GT 6 1982 BOARD NOTIFICATION PLANT:
Diabl o Canyon BN No: 82-102 DISTRIBUTION
- W/Enclosure sj QDocoment Control ("50- 275) 7 NRC PDR*
L PDR*
PRC System*
NSIC*
LBg3 Reading File*
JKerrigan Acting B/C PM*
gHSchierling JLee TNovak/SChestnut LBerry DEisenhut/RPurple MWilliams HDenton/ECase*
PPAS JYoungblood ASchwencer EAdensam CThomas, Acting B/C RMattson RVollmer HThompson SHanauer
- Attorney, OELD*:
OI glE Regional Administrator, Resident Inspector
- WJDircks, EDO (3 cys)
- ABennett, OELD (2 cys)
EChristenbury, OELD*
JScinto*
Board Service List Region
~ g