AUG 1 9 1982 Nr.
G. A. Naneatis, Senior Vice President Facil ities Development Pacific Gas Im Electric Company 77 Beale Street San Francisco, California 94106
Dear Clr. Maneatis:
At our meeting on August 6, 1982, you described your corrective action program for Diablo Canyon Unit 1, to respond to findings from the Teledyne Independent Design Verification Program (IDVP) and your Internal Technical Program (ITP).
In order for the staff to appropriately consider this program and its results in our review effort, we request that you provide the following detailed information.
1.
Provide a description of the corrective action program that identifies all elements of the program, such as seismic analyses for specific structures, piping analyses and development or verification of appropriate Hosgri spectra.
The scope of the corrective actions in each element should be clearly identified.
Discuss how the results of the corrective actions will be documented.
2.
Identify those elements of the corrective action program that will respond to specific error or open items (EOIs) which have been identified by the IDVP and also by the ITP.
For each EOI (IDVP and ITP) a clear record is required.
This includes a description of the original concern, method of resolution and a conclusive statement of the specific resol ution.
3.
Provide a detailed schedule for the completion of specific work-packages on each element and define such packages, e.g.,
by structure.
This information is needed to establish our integrated schedule for audits of such work-packages by the IDVP and the staff..
Based on the information you provided at the August 6 meeting, it is our understanding that some of these elements are near their completion; for example, the Blume Internal Review (BIR). the analysis of the containment annulus structure and the intake structure.
It is our intent to audit these completed activities as soon as reasonably completed work-packages are available at your offices.
8209130458 820819 PDR ADOCK 05000275 P
PDR.
OFFICE/
SURNAME/
OATE$
NRC FORM 318 (1040) NRCM 0240 OFFlClAL RECORD COPY VSGPO: 1981~~960
. 0
,<>8 k f
4
Hr. G. A. Haneatis 2
M 4.
The schedule you discussed at the August 6 meeting was based, in part, on systems you deem to be required for fuel loading.
Provide a detailed list of those safety-related system, structures and components that in your opinion are required for fuel loading, criticality, low power testing and full power operation.
Provide the bases for judging the sufficiency of each such list for each mode of operation.
Ife request that you provide the above information as early as possible in order for the staff to review this information prior to the late August meeting with you and the IDVP organizations.
Sincerely, Origiaa1'Sigmoid Byc Darre)1 G. Eisenhut, Director Division of Licensing cc:
Dr. lI. E. Cooper Teledyne Engineering Services 130 Second Avenue Maltham, Hassachusetts 02254 Hr. R.
F.
Reedy 236 North Santa Cruz Avenue Los Gatos, California 95030 fir. R. L. Cloud 125 University Avenue Berkeley. California 94710 Service List DISTRIBUTION Document Co n trol (50-275/323)
NRC PDR L PDR PRC SYSTEH LB83 Reading FHirag1 i.a JLee HSchierl i.ng BBuckley OELD I&E ACRS06)
BVollmer JPKni:ght TNovak LChandler BJones PKuo RBosnak FSchauer TBishop,R-V' Crews, R-V DEisenhut/RPurple OFFICEP OL:.LB'...
9 3......
)thMAME> N0hiexl.......E.'..(Eal!E E*EE y 08LI.. 82.......... 08/g/.. 2..
- .C.
T ak JP ight 08/ )482 08/
/82
..D........ ~.
RVo r
08 /
2 DB hut,,
08j
/82 NRC FORM 318 (10.80) NRCM 0240 OFFICIAL R EGO R D COPY USGPO; 1881-880-060
0 L
LQ h.
Mr. Malcolm H. Furbush Vice President
- General Counsel Pacific Gas h Electric Cvnpany P.O.
Box 7442
~
San Francisco, Cali fornia 94120 cc:
Philip A. Crane, Jr.,
Esq.
Pacific Gas h Electric Company P.O.
Box 7442 San Francisco, California 94120 Janice E. Kerr, Esq.
California Public Utilities Commission 350 McAllister Street San Francisco, California 94102 Mr. Frederick Ei ssl er, President Scenic Shorel ine Preservation Conference, inc.
4623 More fmesa Drive Santa
- Barbara, Cali fornia 93105 Ms. Elizabeth Apfelberg 1415 Cozadero San Luis Obispo, California 93401 ilr. Gordon A. Sil ver Ms. Sandra A. Silver 1760 Alisal Street San Luis Obispo, California 93401 Harry M. h'i 1 1 is, E sq.
Seymour E Willis 601 California Street, Suite 2100 San Fran i sco, California 94 108 Nr. Richard Hubbard tlHB Technical. Associates Suite V
1723 Hamilton
'venue San Jose, Ca 1 i forni a 95125 Hr. John 'larrs, t'anaaing Editor
'San Luis Obispo County Telegram-Tribune 1321 Johnson Avenue P.
0.
Box 112 San Luis Obispo, California 93406 0)A'LO CAWY0ll
Hr. I'malcolm H. Furbush cc:
Resident inspector/Diabl o Canyon HPS c/o U. S. Huclear Regulatory Commission P.
0.
Box 369 Avila Beach, California 93424 Hs.
Raye Fleming 1920 r;attic Road Shell beach, California 93440 Joel
- Reynolds, Esp.
John R. Phillips, Esq.
Center for Law in the Public interest 10951 L'est Pico Boulevard Thiro Floor Los Angel es, Ca 1 iforni a 900b4 Paul C. Valentine, Esq.
321 Ls ttun r venue Palo Alto, California 94302 Mr. 'byron S.
Georgio u Legal Affai rs Secret ary Governor's Office State Capitol Sacran nto, California 95814 Herbert H. Brown, Esq.
Hill, Christopher 6 Phillips, P.C.
1900 I" Street, "ashirigton, D.C.
2OU36 rrr. DicL'lankenburg, E di tor h Co-Publ i sher Souttr County Publ i shing Corrpany P.
Q. box 460 Arroyo Granoe, Cali forni a 9342U Mr. Jan.
s 0. Schuyler Vice F resi oent Hucl ear Genera ti orr Department Pacific Gas 5 Electric Company P.U.
box 7442 San Francisco, California 94120 P
bruce horton, Esq.
Suite 2U2 32lb Horth 3rd Street Phoenix, Arizona 85012