Discusses 811103 Meeting W/Util in Bethesda,Md Re Seismic Design Problems at Facility.False Statement Made by Util Re Existence of Draft Repts by Cloud Associates on Reverification Program.Notice of Violation Encl
ML16341B767
Person / Time
Site: Diablo Canyon Pacific Gas & Electric icon.png
Issue date: 02/11/1982
From: Deyoung R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Crane P
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16340C351 List:
References
EA-82-013, EA-82-13, NUDOCS 8203010366
Download: ML16341B767 (6)


Text

OW

~ <

FEQ 1 1 r982

+eel I /4 GAS~

p5L pea LPBk Docket No. 50-275 License No.

DPR-76 EA 82-13 Pacific Gas and Electric Company ATTN:

Mr. Phillip A. Crane, Jr.

Assistant General Counsel San Francisco, California 94106 Gentlemen:

Qf~lp o~~~

lggp~

~@pg @ Ajg~~

llpg

+Igf

/

On November 3, 1981 a meeting was held at Bethesda, Maryland, in which representatives of Pacific Gas and Electric Company (PGSE) attended.

This meeting was a continuing discussion of the seismic design problems at the Diablo Canyon Nuclear Power Plant and in particular the seismic reverification program being conducted by R. L. Cloud Associates, Inc. (Cloud Associates).

During this meeting, as a result of questions raised by the Nuclear Regulatory Commission (NRC) Staff, PGIEE representatives made responses which led the NRC Staff to believe that written reports dealing with the reverification program being conducted by Cloud Associates had not been provided to PG&E prior to the November 3, 1981 meeting.

However, in fact, draft reports had been prepared by Cloud Associates and had been submitted to PGItE for comments on October 21, 1981 and October 26, 1981.

The NRC Staff has conducted an investigation into the circumstances surrounding the existence of the October draft reports and the statements made by PGSE concerning them at the November 3, 1981 meeting.

We have concluded that a

false statement was made during this meeting by senior representatives from PGSE.

We have also concluded that the false statement is material.

It is material because the independence of the reverification program was a matter of concern to the NRC Staff during the November meeting and had the NRC Staff been aware that draft reports had been circulated for comment, the NRC Staff would have requested submission of such reports together with the comments in order to evaluate the independence of the program.

Therefore, we have concluded that a material false statement by omission was made.

We have categorized the material false statement as a Severity Level III violation and have enclosed a Notice of Violation.

CERTIFIED MAIL RETURN REQUESTED 8203010366 820211 PDR ADOCK 05000275,-..

>,',9.. ~, '.-

P.DR

4

~ I 1

(Ip

-f i l 4'

~)

Pacific Gas and Electric Company 4 FEB I 1 39B2 We are particularly concerned that certain management personnel of PG&E at the November 3, 1981 meeting had knowledge of the inaccurate statements but did not correct the omission either during or after the meeting.

Candor between the NRC and its licensees is fundamental to the relationship between a licensee and the NRC.

Anything less than an honest and open exchange of information between NRC and its licensees cannot and will not be tolerated.

Therefore, the Chairman of the Board of PG&E is requested to meet with me and the Regional Administrator of Region V to discuss steps that will be taken by PG&E to assure that communications between it and NRC are complete and accurate and that employees at all levels within PG&E and also its consultants and contractors clearly understand that nothing less is acceptable.

This meeting will be held at an NRC office at a mutually convenient time but no later than 30 days from the date of this letter.

In accordance with Section 2.790 of the NRC's "Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosures will be placed in the NRC Public Document Room.

The responses directed by this letter are not subject to the clearance procedures of the Office of Management and Budget, as required by the Paperwork Reduction Act of 1980, PL 96-511.

Sincerely, OriginaI Signed I3y; B. C.DeYonng Richard C.

DeYoung, Director Office of Inspection and Enforcement

Enclosure:

Notice of Violation E

9i IE' GBa r/bts JMurray JL'rman J

z k

R eY g

2/(

/82 2/ (( /82 2/Q /82 2/)(

2 2//y /82

+ ~

~0

Pacific Gas and Electric Company Distribution PDR LPDR NSIC TIC ACRS SECY CA RCDeYoung, IE

JSniezek, IE JLieberman, IE
VStello, DED/ROGR
HRDenton, NRR
BBuckley, NRR FMiraglia, NRR
FIngram, PA
JPMurray, ELD JCummings, OIA
JCrooks, AEOD
Director, EI Staff RI, RII, RIII. RIV, RV
GBarber, IE TWBrockett, IE CON IE Files Central Files CP Book ES Reading File EDO Reading File Office of the Attorney General ATTN:

Hon.

George Deukemejian Attorney General 555 Capitol Mall, Suite 550 Sacramento, CA 90010 State Department of Health Services ATTN:

Mr. Joseph 0.

Ward, Chief Radiologic Health Section 714 P Street Sacramento, CA 95814 Public Utilities Commission ATTN:

Mr. John E. Bryson President 350 McAllister St.

San Francisco, CA 94012