Forwards IE Bulletin 80-24, Prevention of Damage Due to Water Leakage Inside Containment. No Written Response Required
ML16341B453
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 11/21/1980
From: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Crane P
PACIFIC GAS & ELECTRIC CO.
References
NUDOCS 8012040687
Download: ML16341B453 (8)


Text

~ RE0IJ P

~4 0

C0 lP

+**~%

UNITEDSTATES NUCLEAR REGULATORY COMMISSlON REGION V 1990 N. CALIFORNIABOULEVARD SUITE 202,'ALNUTCREEK PLAZA WALNUTCREEK, CALIFORNIA 94598'ovember21, 1980 T

  • ~

g VI Docket Nos.

50-275,, 50-323 Pacific Gas and Electric Company 77 Beale Street San Francisco, California.

94106 Attention:

Mr. Philip A'. Crane, Jr.

Assistant General Counsel Gentl emen:.

Enclosed is IE Bulletin. No 80-24 which. is: transmitted for information with, regard. to your nuclear power. faci.l.ity ShouTd you. have any questions. regarding this bulletin please: contact this office.

S.incer,ely-R; H

Engelkea Director EnclosuLes, IE Bulletin No.. 80-24 2'..

Recently Issued.

IE Bulletins; cc w/enclosures:

E.

B.: Langley,.

PGhE Raymond'.

PG&E R. C. Thornberry, Diablo: Canyon

UNITED STATES OFFICE OF INSPECTION AHD ENFORCEMENT WASHINGTON, D.C.

20555 November 21, 1980 SSIHS No.:

6820 Accession No.:

8008220270 IEB 80-24 IE Bulletin No. 80-24:

PREYENTION OF DAMAGE DUE TO )1ATER LEAKAGE INSIDE CONTAINMENT (OCTOBER 17, 1980 INDIAN POINT 2 EYENT)

Descri tion of Circumstances:

On October 24, 1980 IE Information Notice No. 80-37 described an event that occurred at the Indian Point Unit 2 (IP-2) facility.

On October 17,

1980, upon containment entry for repair to a nuclear instrument, it was discovered that several inches of water had accumulated on the containment floor without the operators'nowledge.

This accumulation was later determined to have amounted to over 100,000 gallons which flooded the reactor vessel pit and wetted the lower nine feet, of the reactor vessel while the reactor was at operating temperature.

The flooded condition resulted from the following combination of conditions:

(1) There were significant multiple service water leaks from piping and fan coolers onto the containment floor.

This system had a history of leakage; (2) Both containment sump pumps were inoperable,,

one due to blown fuses and the other due to binding of its float switch; (3) The significance of two containment sump level indicating lights which indicateo that the water level was-continuously above the pump-down level was not recognized by the operators; (4) There was. no high water level alarm and the range of sump level indicating lights failed to indicate the overflowing sump level; (5) The moisture level indicators for the containment atmosphere did not indicate high moisture levels, apparently due to an error in calibration and/or ranging which made them insensitive to the moisture'evels resulting from relatively small cold water leaks; (6) The hold-up tanks which ultimately receive water pumped from the containment sump also received water from other sources (Unit 1 process

water, lab drain water, etc).

These other water sources masked the effect of cessation of water flows from the Unit 2 sump; (7) The fan cooler condensate wier level measuring instruments were not properly calibrated; (8) There was no water level instrumentation in the reactor vessel pit and the pumps were ineffective since they discharge to the containment floor for ultimate removal by the containment sump pumps.

This Bulletin is issued to enable the NRC staff to formulate requirements for long term generic corrective actions which will be the subject(s) of future NRC actions.

The bulletin requires short term actions which will preclude IP-2 type events at other plants in the interim before the longer term generic actions are accomplished.

IEB 80-24 Hovember 21, 1980 Page 2 of 3 Actions to be Taken bv Licensees:

1.

Provide a sugary description of all open* cooling water systems present inside containment.

Your description of the cooling water systems must include:

(a) i~tode of ooeration during routine reactor operation and in response to a LOCA; (b) Source of water and typical chemical content of water; (c) Haterials used in pioing and coolers; (d) Experience with system leakage; (e) History and type of repairs to coolers and piping systems (i.e., replacement, weld, braze, etc.); (f) Provisions for isolating portions of the system inside containment in the event of leakage including vulner-ability of those isolation provisions to single failure; (g) Provisions for testing isolation valves in accordance with Appendix J to 10 CFR 50 (h) Instrumentation (pressure, dew point, flow, radiation detection, etc.)

and procedures in place to detect leakage; and (i) Provisions to detect radioactive contamination in service water discharge from containment.

2.

For plants with open cooling water systems inside containment take the following actions:

a.

Verify existence or provide redundant means of detecting and promptly alerting control room operators of a significant accumulation of water in containment (including the-reactor vessel pii if present).

b.

Verify existence or provide positive means for control room operators to determine flour from containment sump(s) used to collect and remove water from con.ainment.

c.

Verify or establist at least monthly surveillance procedures, with appropriate operat-ng limitations, to assure plant operators have at least trio methods of determining water level in each location where water may accumulate.

he surveillance procedures shall assure that at least one method to remove water from each such location is available during power operation.

In the event either the detection or removal systems become inoperable it is recomnended that continued power operation be limited to seven days and added surveillance measures be instituted.

d.

Review leakage detection systems and procedures and provide or verify ability to promptly detect water leakage in containment, and to isolate the leaking components or system.

Periodic containment entry to inspect n

pen system uti izes an indefinite volume, such as a river, so that leakage from the system could not be detected by inventory decrease.

In addition, a

direct radioactive pathway might exist to outside containment in the event of a

LOCA simultaneous with a system leak inside containment.

A closed system utilizes a fixed, monitored volume such that leakage from the system could be detected from inventory decrease and a second boundary exists to prevent loss of. containment integrity as a result of a system leak. inside containment.

IEB 80-24 November 21, 1980 Page 3 of 3 for leakage should be considered.

e.

Beginning within 10 days of the date of this bulletin, whenever the reactor is operating and until the measures described in (a) through (d) above are implemented, conduct interim surveillance measures.

The measures shall include where practical (considering containment atmosphere and ALARA considerations) a periodic contairment inspection or remote visual surveillance to check for water leakage.

If containment entry is impractical during operation, perform a containment inspection for water leakage at the first plant shutdown for any reason subsequent to receipt of this bulletin.

f.

Establish procedures to notify the NRC of any service water system leaks within containment via a special licensee event report (24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> with written report in 14 days) as a degradation of a containment boundary.

3.

For p'lants with c1osed cooling water systems inside containment provide a summary or experiences with cooling water system 1eakage into containment..

4.

Provide a written report, signed under oath or affirmation, under the provi-sions of Section 182a of the Atomic Energy Act of 1954, in response to the above items within 45 days of the date of this bulletin.

Include in your report where applicable, your schedule for completing the actions in response to items 2 (a) through (d).

Your response should be sent to the Director of the appropriate Regional Office with a copy forwarded to the Director, HRC, Office of Inspection and Enforcement,, Vashington, D.C.

20555.

If you desire additional information regarding this matter please contact the appropriate IE Regional Office.

Approved by GAO, B180225 (R0072); clearance expires November 30, 1980.

Approval was given under a blanket clearance specifically for identified generic problems.