IE Insp Repts 50-275/80-16 & 50-323/80-08 on 800812-15.No Noncompliance Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings,Qa Audit & Nonconformance Rept Review & Unit 1 Mods
ML16341B434
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 09/15/1980
From: Elin J, Haynes R, Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To:
Shared Package
ML16341B435 List:
References
50-275-80-16, 50-323-80-08, 50-323-80-8, NUDOCS 8010230077
Download: ML16341B434 (14)


See also: IR 05000275/1980016

Text

50-275/80-16

Report

No.

Docket

No

50,275/50

232

U. S.

NUCLEAR REGULATORY COMMISSION

OFFICE OF INSPECTION AND ENFORCEMENT

REGION V

.cense

No

CPPR-39'PPR-69

Safeguards

Group

Pacific

Gas

and Electric Company

77 Beale Street

San Francisco,

California

94106

Faci1ity Name;

Diablo Canyon Units

1 and

2

Inspection at:

Diablo Canyon Site,

San Luis Obispo County, California

Inspection conducted:

August 12 - 15,

1980

Inspectors:

Ff fir.scg

Reactor

Inspector

~ J.

0. Elin, Reactor'nspector

Date Signed

Date Signed

Approved By:

Date Signed

tx- 8o

Date Signed

50-323/80-08

~At<<d:

R

di

p

i

by

gi

1b

di

p

of construction

and modification activities including:

licensee

actions

on

previous irispection findings and 50.55(e)

items; Unit

1 modifications per the

TMI Short Term Lessons

Learned

Requirements;

followup on IE Bulletins and

Circulars;

gA audits review,

and nonconformance

report review.

The inspection

'nvolved 44 inspector

hours onsite

by two

NRC inspectors.

Results:

No items of noncompliance

or deviations

were identified.

C. Haynes,~Chi

4, Projects

Section

Reactor Construction

and Engineering, Support

Branch

Summary:

Ins ection durin

eriods of Au ust 12-15,

1980

Re ort Nos.

50-275 80-16 and

+77

8.'oioep9:,,g

RV Form 219 (2)

DETAILS

1.

Individual s Contacted

a.

Pacific

Gas

and Electric

Com an

PGRE

  • D. A. Rockwell, Acting Project Superintendent
  • M. E.

Leppke,

Resident

Mechanical

Engineer

  • R. Twiddy, gA Supervisor
  • S. J.

Foat, Acting gC Coordinator

  • G. L. Johnson,

gC Inspector

  • I. L. MacDonald, Scheduling

Engineer

Irl. Raymond,

Manager guality Assurance

Various other

gC and construction

engineering

personnel.

b.

H.

P.

Foie

, Co.

Foie

J.

Thompson, Acting gA Manager

Various other

gC and crafts personnel.

c.

Pullman

Power Products

PPP

Two crafts personnel

(welder and helper).

d.

Other Personnel

  • T. Young,

NRC Senior Resident

Inspector

  • M. J. Bagaglio,

tlRC Resident

Inspector

  • Exit Interview Attendees

2.

Site Tour

Upon arrival

on site the inspectors

toured the facility to observe

in-process

and completed work activities to ascertain

general

compliance

with regulatory requirements,

codes,

standards

and procedures.

Activities examined included:

a) reinforcing steel installation,

concrete

preplacement activities

and formwork for the Technical

Support Center

and

remote sampling facility, b) selected

support

and electrical

panel installations for the internal

and external

hydrogen

recombiner

systems,

c) selected

raceway installations for

the

new auxiliary feedwater flow control valve operators,

and (d)

in-process

IE Bulletin 79-02 modifications to add stiffener plates

to base plates

attached

to concrete with concrete

anchors.

Discussions

with crafts personnel

engaged

in the addition of stiffener

plates

to base plates

indicated that apparently

the Pullman

Power

Products

procedures

affecting these modifications did not require

releasing

the torque

on the concrete

anchor bolts prior to welding

the stiffener plates in place.

The inspector brought this concern

to the attention of responsible

licensee

management.

The licensee

took the following corrective actions:

(a) Pullman was instructed to

place

a note

on all affected modification drawings requiring that the

torque

be released

on concrete

anchor bolts prior to baseplate

welding,

(b) Pullman would issue

a

PGSE approved

gA instruction requiring the

release

of anchor bolt torque prior to baseplate

welding to assure

concrete anchor integrity, (c) the contents of the gA instruction

would be incorporated into the Pullman procedures

upon the next

revision and (d) a reinspection of all previously completed

baseplates

and concrete

anchor bolts, modified in response

to IE Bulletin 79-02,

would be accomplished

and documented.

Pullman

had included requirements

for releasing

anchor bolt torque in previous

programs

and

has

procedures

in effect requiring

gC verification of torque for bolting activities.

The implementation of the licensee's

actions will be examined during

a future inspection.

(275/80-16-01).

The inspector also examined

the receiving inspection reports

and

certified material test reports for two heats of No.

8 rebar

and

one heat of No.

10 rebar.

The rebar storage

and hold areas

appeared

to be well marked

and segregated

with all rebar on dunnage.

No items of noncompliance or deviations

were identified.

Licensee

Action on Previous .Enforcement

Items

Closed

(275/80-10-05

Deficienc:

Failure to document electrical

racewa

su

ort ins ections

as re uired

b

rocedure.

The licensee's

response

to the specific item of noncompliance

was

submitted

by

PGLE letter dated

June

17, 1980.

The inspector

examined

the specified corrective actions to verify implementation

and sampled

about

10 conduit installations to verify compliance with procedure

specified requirements.

No items of noncompliance

or deviations

were

identified.

Licensee Action on Previousl

Identified Followu

Items

a.

Closed

275/80-10-02

Followu

Item:

Site Mechanical

En ineerin

Instructions

(SNEI

did not reflect code re uirements

The inspector

had identified that certain licensee

procedures

appeared

to be overly restrictive in the area of weld reinforcement

and inspectors

were using code specified requirements

instead of

procedural

specified criteria for weld inspection

on the external

hydrogen

recombiner

system.

0

b.

The licensee

had reviewed the

SMEI procedure

set

and made

revisions,

as required,

to properly implement code requirements.

The inspector

sampled

and examined six SMEI procedures

(covering

subjects

such

as pipe support installation

and inspection,

pipe

visual inspection,

drawing control,

and weld identification,

reinforcement

and undercutting)

to verify review and implementation

of code requirements

and

had

no further questions.

Closed)

(275/80-10/03

Possible

Debris Access in Panels

SPHA

and

SPGA

The licensee

evaluated

the need for the questioned ventilation

holes

and found them to be unnecessary.

The panels

have

been

modified with metal plates to provide protection from possible

debris

access.

Control power entry into the breaker enclosure

is via a separate

terminal

box mounted

on the enclosure.

This

item is closed.

c ~

Closed

275/80/04

Classification of Mattmeter

Housin

Panel s

A Design

Change

Request

(DC-1-G-E-1858)

has

been submitted to

reclassify these

panels

as

Class

IE.

The inspector

reviewed

the panel

mounting per the licensee's

drawing for standard

seismic category

1 mounts

(DiIG 050030).

No problems were noted.

The licensee will inspect the installation of these

panels

per

their standard

procedures

for Class

IE equipment.

This item is

closed.

5.

Licensee Action on 50.55

e

Items

a

~

0 en

Cracked

Pl asti c

Cam Followers in G. E.

T

e Switches

b.

The licensee

reported

by telecon

on January

21,

1980 that cracking

had

been

observed in the plastic

cam followers for General

Electric

Type

SBM switches installed in Unit l.

A preliminary written

report was submitted

on March 10,

1980.

The licensee will replace

switches of the

SBM type with switches of a different design prior

to operation.

The inspector

observed

work in progress

to replace

these

switches.

The inspector

noted possible

cracks

on the

cam

followers of type

SBM switches

removed from Unit

1

4160 volt

switchgear

but did not note any switches

which were inoperable.

This item will be examined during

a future inspection.

0 en

Insulation failure of Electrical

Cables

Routed to the

Unct

Inta e Structure

The licensee

reported

by telecon

on February

28,

1980,

a

deficiency involving insulation failure on

a number of electrical

cables

routed to the Unit

1 intake structure,

and submitted

a

preliminary written report on March 21,

1980.

The inspector discussed

two apparent construction deficiencies identified by the licensee:

(1) Concrete trench walls to support the 6" thick concrete

cap

had not been installed

and (2)

PVC conduit in the area

had not been

provided with the support configuration required

by drawings.

The inspector

reviewed

the

new design for this cable

support structure which encases

the

PVC conduit in a

"monolith" block of concrete

keyed to the crib wall and

intake structure pull box.

Photographs

taken at various

stages

of the excavation

and repair were reviewed together

with observation of completed work.

The inspector discussed

with the licensee similar problems

with the Unit 2 intake structure

cable routing.

The licensee

plans to make similar repairs to the Unit 2 intake structure.

This work will be detailed in the licensee's

final report on

this item.

This i tem will be examined during

a future inspection.

6.

Unit

1 Modifications Related to TMI

The licensee

was

engaged

in the Unit

1 installation of certain

modifications

as committed in the

PGSE response

to NUREG-0578 (Short

Term Lessons

Learned Requirements).

a

~

Emer

enc,

Power Supnl

for Pressurizer

Heater

Grou

s 1-2 and 1-3

The inspector

examined

the installation of seven electrical

circuits and

two conduits, including supports,

related to this

modification for compliance with procedures.

In addition, the

following documentation

related to the above observations

were

examined:

raceway inspection reports;

support inspection

worksheets

and reports; circuit pulling records,

megger

and

termination documentation;

one torque wrench calibration recall/

calibration records,

and the recall/calibration for two

termination tools.

b.

Ho items of noncompliance or deviations

were identified.

Hydro en Recombiner

S stem

The inspector

examined nine electrical circuits, three of which

had cables pulled and six had cables

pulled and terminated,

and

three conduit installations for compliance with procedures.

In

addi tion, the following documentation

related

to the above

observations

were examined:

raceway inspection reports;

support inspection work sheets

and reports; circuit pulling

records,

megger

and termination documentation;

and the recall/

calibration documentation

for one termination tool.

No items of noncompliance

or deviations

were identified.

-5-

c

Acoustic Flow Monitor on Pressurizer

Safet

Valves

The inspector

examined

the installation of three acoustic

flow sensor circuits on the Unit

1 pressurizer

safety valves

for compliance with procedures.

It was noted that safety

wire on the acoustic detectors

was broken.

The licensee

stated that these safety wires would be replaced.

All other

work appeared

to have

been accomplished

in accordance

with

established

procedures.

No items of noncompliance of deviations

were identified.

7.

Safet

Related

Concrete

Placement

The inspector

observed

work and work activities associated

with a

concrete

placement for the technical

support center.

The inspector

observed

batch plant operations,

acceptance

testing,

and placement

activities for compliance with procedures

and industry standards.

The placement

was halted after approximately five yards

due to a

bearing failure on the liftcrane.

No items of noncompliance or deviation were noted.

8.

Modifications to Auxiliar

Feedwater

Control

S stem

The inspector

examined modifications being performed to the auxiliary

feedwater

system for compliance with procedures.

The installation of

8 conduits/raceways

and their supports

were inspected

along with

applicable support inspection work sheets

and inspection reports.

Cable pulling activities

had not started

on the modification at the

time of the inspection.

No items of noncompliance or deviation were noted.

9.

Licensee's

Res

onse to IE Bulletin 80-16

and

IE Circular 80-16

The inspector

reviewed the licensee's

actions to date in response

to IEB 80-16 and

IEC 80-16 of June

26,

1980.

This bulletin and

circular detailed

problems with Rosemount

Model

1151

and

1152

pressure

transmitters

and Model

510

DU trip units.

The licensee

stated that the response

was not complete at the time

of inspection.

It had been established,

however, that

510

DU trip

units were not utilized at Diablo Canyon

and

Rosemount

pressure

transmitters utilized as

steam flow detectors

may in some conditions

exceed

the 1404 upper range limit condition described

in the bulletin.

These

pressure

transmitters will be addressed

in the licensee's

response.

0

k

/

s

upas

llsJP:0

10.

Nonconformance

Re ort Review

The inspector

examined

the civil, mechanical, electrical

and clean-up

crew minor variation reports

issued

since Hay, 1980,

and the

nonconformance

reports

issued

since February,

1980.

The reports

appeared

to have

been evaluated

and resolved

as required

by the

gA

program.

ll.

gA Audits

The licensees

internal audit system

was inspected

by examining

18 gA

Audits of General

Construction activities performed since

June 1, 1980.

In those

cases

where findings required corrective action to be t'aken

the corrective actions

had

been

completed in accordance

with the

licensee's

nonconformance

reporting system or open item resolution

system.

No items of noncompliance or deviations

from the licensee's

gA audit

and reporting system were identified.

12.

Exit Interview

The inspectors

met with licensee

representatives

(denoted in Paragraph

1)

at the conclusion of the inspection

on August 15,

1980 and summarized

the inspection

purpose,

scope

and findings.

I +