Responds to Aslab 800918 Order Re Stipulations.Nrc,San Luis Obispo Mothers for Peace,Governor Brown & Applicant Agree to Stipulation Re Document Authenticity.List of Documents Encl
ML16341B430
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 10/10/1980
From: Olmstead W
NRC OFFICE OF THE EXECUTIVE LEGAL DIRECTOR (OELD)
To: Johnson W, Moore T, Salzman R
NRC ATOMIC SAFETY & LICENSING APPEAL PANEL (ASLAP)
References
ISSUANCES-OL, NUDOCS 8010200630
Download: ML16341B430 (10)


Text

October 10, 1)80 Richard S. Salzman, Esq.,

Chairman Atomic Safety and Licensing Appeal Board U. S. Nuclear Regulatory Comission

'Washington, D. C.

20555 Dr.

W. Reed Johnson Atppic Safety and Licensing Appeal Board U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Mr. Thomas S. Moore Atomic Safety and Licensing Appeal Board U. S. Nuclear Regulatory Commission Washington, D. C.

20555 In the Matter of PACIFIC GAS AND ELECTRIC COMPANY (Diablo Canyon Nuclear Power Plant, Unit Nos.

1 and 2)

Docket Nos. 50-275 O.L. and 50-323 O.L.

Dear Mr. Chairman and flembers of the Board:

In your September 18, 1980 Rulings on Contentions, you directed the Staff to take the lead, in determining what matters could be stipulated in the security proceeding and to report to you by October 10, 1980 our attempts in this regard.

Counsel for the NRC Staff contacted the lead counsel for the San Luis Obispo I<others for Peace, Governor Bro>vn, and the Applicant.

The pa! ties agree to the following:

1.

A stipulation as to relevant facts is premature.

After testimony is filed, however, the parties will attempt to come to an agree-ment as to ghlevant facts.

/

2.

The parties are willing to stipulate as to the authenticity of documents.

The parties agree that the 87 documents made available'y the $taff in response to Governor Brown's September 8,.1980 Request for Production of Documents is authentic.

A list of these documents is attached.

3.

Mr. Willis, Counsel for SLOMFP, is unable to stipulate as to the.

autheniticity of the documents produced hy the Applicant as he needs more time to reviev! them.

A further stipulation as to thes!I documents may be possij7le in the near future.

Sincerely,

.gods OFFICE suRer a AC,.:...Harry..

Bruce DATE/ '

'ber l)1.1>s., Esq.

Iorton, Esq.

.H; Brown;"Es William

~ Lead"C

. Olmstead nsel "for.HRG" taf;fs OELD OELD LLSv~a'r tz: eat lf80lmstead"

'0/.10/80.......10/10/8Q.

'OELD' hS'ahri s tenb'ury

...1 0/.1 0/.80...

R 0

<<NRC FORV. 310 (9 76) NRCI<<I 0240 NRC FORM 318 (9-76) NRCM 0240 U~~. GOVERNMENT PAINTINGOFFICE: 1979 289%69 v'

V.S. GOV~NPIENT PRINTING OFFICE: 1979-289<69

OI I tl I FJOI It I A

t.

t Fg

'I F

~)F I

JJ.I I

I II F

O,F 4

I J illJIJ

~

~

'lt 4 Fl.'

I t'.

~ ~ - t

~

NRC STAFF LIST OF DOCUMENTS MADE AVAILABLE IN RESPONSE TO GOVERNOR BROW'('S SEPTEMBER 8, 1930 RE UEST FOR PRODUCTION OF DOCUMENTS Production Re uest 1

Diablo Canyon Security Plan, Revisions 2 - 10 2.

Diablo Canyon Safeguards Contingency Plan, Revisions 0 and 1 (other revisions are included as Chapter 8 to Revisions 2 - 9 of the security plan)

Production Re uest 2

3.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

,1 5.

16.

17.

18.

19.

Memorandum for L.V. Gossick (EDO) and P.L. Strauss from S.J.

Chi 1k dated December 17, 1976 Memorandum for B. Huberman (OPE) from R.B. Minogue (SD) dated January 3,

1977 Memorandum for Commissioners from B.C.

Rusche (NRR) and K.R.

Chapman (NMSS) dated February 2, 1977 Memorandum for J.F. Stolz (NRR) from R.A. Clark (NRR) dated May 20, 1977 Memorandum for J.F. Stolz (NRR) from R.A. Clark (NRR) dated January 26, 1978 Memorandum for J.R. Miller (NRR) from R.A. Haarman (LASL) dated February 10, 1973 Memorandum for J.F. Stolz (NRR) from R.A. Clark (NRR) dated February 2, 1979 Memorandum for A.Schwencer (NRR) from G.W.McCorkle (NMSS) dated January 30, 1980 Memorandum for A.Schwencer (NRR) from G.W.McCorkle (NMSS) dated May 22, 1980 Memorandum for A.Schwencer (NRR) from G.W.McCorkle (NMSS) dated August 11, 1980 Letter to Paul E. Tsongas from L.V. Gossick (EDO) dated May 5, 1976 Statement of Consideration for 10 CFR 5 73.55, February 24, 1977 Federal

~Re ister Notice SECY-76-242:

Amendments to 10 CFR Part 73 to Specify Measures for Physical Protection of Nuclear Power Reactors from Industrial Sabotage and to Provide Clarification of the Applicability of 5 73.55 to Nuclear Reactors (Apri 1 26, 1976)

SECY-76-242B:

Physical Protection Requirements for Nuclear Reactors (September 8, 1976)

SECY-76-242C:

Physical Protection of Nuclear Power Reactors Against Industrial Sabotage; Amendments to 10 CFR Parts 50 and 73 (October 7, 1976) 10 CFR Part 8, dated June 17, 1977 Standard Review Plan, Section 13.6 (undated)

0;

a A

~Pa e Two LIST OF DOCUMENTS MADE AVAILABLE 20.

21.

22.

23.

24.

25.

26.

27.

28.

29.

30.

31.

32.

33.

34.

35.

36.

37.

38.

39.

40.

41.

42.

43.

44.

45.

46.

Regulatory Guide 1.17 (June 1973)

Regulatory Guide 5.44 (May 1980) and Revision 1

(June 1976)

Regulatory Guide 5.54 (March 1978)

Regulatory Guide 5.20 (January 1974)

Regulatory Guide 5.12 (November 1973)

Regulatory Guide 1.92 (February 1976)

Regulatory Guide 5.43 (January 1975)

Regulatory Guide 1.70 (November 1978)

NUREG-0219 NUREG-0220 NUREG-0416 Review Guidelines 1 - 24 (November 6, 1978)

Memorandum for G.W.McCorkle (NMSS) from L.L.Bush (I8E)dated July 3, 1980 Memorandum for N.C.Mosely (I&E) from R.H.Engelken (Region V) dated March 21, 1980 Memorandum for D.B.Vassallo (NRR) from N.C.Mosely (I&E) dated April 8, 1980 Memorandum for E.M.Howard (SI) from MeD.Schuster (Region V) dated June 2, 1980 Memorandum for L.C.Solem (SD) from L.L.Bush (I&E) dated August 6, 1980 Memorandum for J.R.Miller (NRR) from R.G.McCormick (I&E) dated May 10, 1979 Memorandum for J.R.Miller, et al.(NRR) from J.M.Elliot (NRR) dated June 23, 1977 Note to R.A.CIark (RSB), et al.fran J. Keivington (RSB) dated June 9, 1977 Memorandum to D.G.Rose (LASL) from R.A.Haarman (LASL) dated February 7,

1979 Letter to F.Gepagano (NRR) from W.S.Chamberlin (LASL) dated March 7, 1978 Letter to J.R.Miller(NRR) from R.A.Haarman (LASL) dated March 14, 1978 Letter to R.A:Clark (NRR) from D.G.Rose (LASL) 'dated August 23, 1977 Interim Federal Specification, W-A-00450B (February 16, 1973)

Bullet Resisting Equioment, Underwriters Laboratory, Ut. 752 (February 18, 1974)

Diablo Canyon Spent Fuel Calculations (undated)(handwritten notes)

Paae Three LIST OF DOCUMENTS MADE AVAILABIE 47.

Enclosure:

Comments on Security Plan (undated) 48.

Minutes of meeting held between NRC, LASL, and PG&E (undated) 49.

Diablo Canyon MASP Report (undated) 51.

Handwritten notes of a meeting between NRC, LASL, and PG&E dated January 5,

1978 52.

Handwritten notes of D.G.Rose (LASL) dated from 5/2/80 through 9/10/80 53.

Security Plan Evaluation Report (SPER)

(undated) 54.

Appendix B, NRC Supolemental Staff Position on Personnel Search Requirements, dated September 30, 1977 Production Re vest 3

55.

Letter to J.C.Morrissey from R.L.Tedesco (NRR) dated August 29, 1930 56.

Informal transmittal from A.Metcalf (PG&E) to F.Pagano (NRR) dated March 1, 1979 and describing the temporary barrier between Units 1

and 2

57.

Letter to P.A.Crane (PG&E) from L.R.Norderhaug (Region Y) dated June 4, 1980 5S.

Letter to P.A.Crane from L.R.Norderhaug (Region V) dated June 3,

1977 59.

Letter to P.A. Crane from L.R.Norderhaug (Region V) dated May 2, 1979 60.

Letter to P.A.Crane (PG&E) from L.R.Norderhaug (Region V) dated July 24, 1979 61.

Letter to M.H.Furbush (PGhE) from J.F.Stolz (NRR) dated April 16, 1980 62.

Letter to P.A.Crane (PG&E) from R.H.Engelken (Region V) dated July 26, 1979 63.

Letter to J.C.Morrissey (PG&E) from R.S.Boyd (NRR) dated March 28, 1979 64.

Letter to Recipients of NUREG-0219 from H.J.Besaw (ADM) dated November 20, 1978 65.

Letter to J.C.Morrissey (PG&E) from D.B.Vassallo (NRR) dated September 12, 1978 66.

Letter to All Power Reactor Licensees and Applicants from D.B3/

11 (NRR) d t d August 9, 1978 assa o

a e 67.

Letter to All Power Reactor Licensees and Applicants from J.R.Miller (NRR) dated June 12, 1978 68.

Letter to All Power Reactor Licensees and Applicants from J.R.Miller (NRR) dated May 5, 1978 69.

Letter to J.C.Morrissey (PG&E) from J.F. Stolz (NRR) dated January 30, 1978

~Pe e Four LIST OF DOCUMENTS MADE AVAILABLE 70.

Letter to J.C.Morrissey (PG&E) from E.G.Case (NRR) dated November 28, 1977 71 Letter to J.C.Morrissey (PG&E) from J.F. Stolz (NRR) dated November 10, 1977 72.

Letter to Addressees from D.B.Yassallo(NRR) dated October 25, 1977 73, Letter to J.C.Morrissey (PG&E) from J.F.Stolz (NRR) dated September 1,

1977 74.

Letter to J.C. Morrissey (PG&E) from J.F. Stolz (HRR) dated May 27, 1977 75.

Letter to PG&E from D.P.Allison (NRR) dated June 13, 1977 76.

Letter to J.C.Morrissey (PG&E) from D.B.Vassallo(NRR) dated May 4, 1977 77.

ANSI N18.17-1973 (July 18, 1973) 78.

SANDIA Laboratory, "Intrusion Detection Systems Handbook,"

Volumes I and II (November 1976; revised October 1977) 79.

SANDIA Laboratory, "Barrier Technology Handbook" (April 1978)

Production Re vest 4

80.

"Survey of Problems with Power Reactor Sabotage by Explosives or Incendiary Devices," Quarterly Status Report No. 1, by W.P.

Fox and M.J. Vrizar of LASL for NRC 81.

"Survey of Problems Associated with Power Reactor Sabotage By Explosives or Incendiary Devices,"

by M.J.Vrizar, W.P.Fox, G.T.Fritz, and R.N.Rogers (LASL) 9~ ted May 1979 Production Request 5

The Staff has not written-or:.relied on any analyses'.of threats to nuclear facilities in California and/or in the region of the Diablo Canyon facility site.

Production Re uest 6

82.

NUREG-0184, User's Guide for Evaluating Physical Security Capabilities of Nuclear Facilities by the EASI Method (SANDIA Laboratories), (June 1977) 83.

NUREG-760145, The "EASI" Approach to Physical Security Evaluation (SANDIA Laboratories)

(January 1977) 84.

NUREG-0231, EASI on the KP-25, HP-65, and HP-67 (SANDIA Laboratories)

(May 1977)

=.

85.

NUREG/CR-1246; SAFE User's

Manual, Volume I Executive Summary (SANDIA Laboratories)

(August 1980) e'6.

NUREG/CR-0788, Safeguards Methodology Development History (SANDIA Laboratories)

(May 1979) 87.

NUREG/CR-0928, Application of SAFE to an Operating Reactor (SANDIA Lab t

)

(August 1979) a ora orles)