ML16341B276

From kanterella
Jump to navigation Jump to search
7 to Updated Final Safety Analysis Report, Chapter 7, Table 7.2-4, Symbols and Abbreviations
ML16341B276
Person / Time
Site: Cook  
Issue date: 10/24/2016
From:
Indiana Michigan Power Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML16336A263 List: ... further results
References
AEP-NRC-2016-42
Download: ML16341B276 (1)


Text

IINNDDIIAANNAA AANNDD M MIICCHHIIGGAANN PPOOW WEERR DD.. CC.. CCOOOOKK NNUUCCLLEEAARR PPLLAANNTT UUPPDDAATTEEDD FFIINNAALL SSAAFFEETTYY AANNAALLYYSSIISS RREEPPOORRTT Revision:

17 Table:

7.2-4 Page:

1 of 1 SYMBOLS AND ABBREVIATIONS TL Channel in Test Warning Lamp

  • L Test Lamp L/L Lead/Lag Unit I/I Signal Isolator
  • P/

Test Point

  • D/

Computer Input

  • S/

Test Switch

  • T_

Transmitter

  • Q_

Power Supply

  • I-Indicator De-energize (trip) on signal set point
  • B-Signal Monitor (Bistable)
  • B-
  • B-Signal Monitor (Bistable)

De-energize (trip) on signal set point Energize (trip) on signal set point Signal Monitor (Bistable)

ABBREVIATIONS DNBR Departure from nucleate boiling ratio TH Reactor Coolant Hot Leg temperature TC Reactor Coolant Cold Leg temperature Tavg (TH+TC (per loop)

T TH - TC (per loop)

AUCT Auctioneered (highest)

LVDT Linear Variable Differential Transformer (position sensor)

Ch.

Protection channel S. I.

Safety Injection MDAFP Motor Driven Auxiliary Feedwater Pump TDAFP Turbine Driven Auxiliary Feedwater Pump CIA Containment Isolation Phase "A" CIB Containment Isolation Phase "B" CVI Containment Ventilation Isolation FWI Feedwater Isolation SLI Steam Line Isolation CTS Containment Spray WR Rec.

Wide Range Recorder NR Rec.

Narrow Range Recorder

  • =P=Pressure Channel
  • =L=Level Channel