ML16341A178

From kanterella
Jump to navigation Jump to search
Discusses Telcon Between J Tinlin & J Elin Re Arrangements for Administration of Written & Oral Exams for Senior Reactor Operators on 840918-28.License Applications Should Be Submitted at Least 60 Days Prior to Exam
ML16341A178
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 08/02/1984
From: Pate R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Schuyler J
PACIFIC GAS & ELECTRIC CO.
References
NUDOCS 8408070479
Download: ML16341A178 (8)


Text

Mr. J. 0. Schuyler Vice President, Nuclear Power Generation Pacific Gas and Electric Company 77 Scale Street, Room 1435 San Francisco, California 94106 F EILE ggpy, l

Dear Mr. Schuyler:

Subject:

Senior Operator Licensing Examinations Diablo Canyon Units 1 and 2

In a telephone conversation between Mr. Jim Tinlin, PG&E and Mr. John Elin, NRC, arrangements were made for the administration of examinations at the Diablo Canyon Unit 1 and 2 site for Senior Reactor Operators.

The written examinations are scheduled for September 18, 1984.

The plant oral examinations are (also) scheduled for September 18-28, 1984.

In order for us to meet the above schedule, it will be necessary for the facility to furnish the approved reference material listed in Enclosure 1

"Reference Material Requirements for Operator/Senior Operator Xicensing Examinations" by August 10, 1984.

Any delay in receiving this material will result in a delay in administering the examinations.

Our examinations are scheduled far in advance with considerable planning to best utilize our limited examiner manpower and to meet the examination dates requested by the various facilities.

Therefore, missing the August 10, 1984 deadline, even by a few days, will likely result in a long delay, since it may not be possible to reschedule examinations at other facilities.

Mr. Tinlin has been advised of our reference material requirements, the number of reference material sets that are required, and the examiner's names and addresses where each set is to be mailed.

The facility management is responsible for providing adequate space and facilities in order to properly conduct the written examinations.

Enclosure 2, "Administration of Operator/Senior Operator Licensing Written Examinations" describes our requirements for conducting these examinations.

Mr. Tinlin has also been informed of these requirements.

All operator and senior operator license applications should normally be submitted at least 60 days prior to the first examination date so that we will be able to 'review the training and experience of the candidates, process the medical certifications, and prepare final examiner assignments after candidate

'eligibility has been determined.

If the applications are not received at least 30 days prior to the examination dates it is likely that a postponement will be necessary.

8408070479 840802 PDR ADOCK 05000275 FDR

1

,l I

l Thank you for your consideration in this matter.

If you have any questions regarding the examination procedures and requirements, please contact John Elin at (415) 943-3728.

This request for information was approved by the Office of Management and Budget under clearance

.number 3150-0101, which expires June 30, 1986.

Comments on burden and duplication may be directed to the Office of Management and Budget, Reports Management Room 3208, Hew Executive Office Building, Mashington, D.C. 20503.

Sincerely,,

R. J.

ate, Chief Reactor Safety Branch Enclosures as stated:

1.

Reference Material Requirements for Operator/Senior Operator Iicensing Examination 2.

Administration of Operator Iicensing Written Examinations cc w/o enclosures:

H. Schierling, NRR M. Mendonca, RV P. Johnson, RV John Elin, Examiner Prank Jaggar, Chief Examiner (EGSG)

R. Muscat, RV (2.copies) bcc:

Mr. Martin, RV pink/green/file copies State of CA RV Elin dot 8 //84 I. Miller 8/

/84 R. Pate 8/

/84

Enclosure 1

Reference Material Requirements for Operator/Senior Operator Licensing Examinations 1.

Procedure Index (alphabetical by subject) 2.

All Administrative Procedures (as applicable to reactor operation or safety 3.

All Integrated Plant Procedures (Normal or General Operating Procedures) 4.

Emergency Procedures (Emergency Instructions, Abnormal or Special Procedures 5.

Standing Orders (Important orders which are safety related and may supersede the regular procedures) 6.

Fuel Handling and Core Ioading Procedures, (Initial Core Loading Procedure, when appropriate) 7.

Annunciator Procedures (alarm procedures, including set points) 8.

Radiation Protection Manual (Radiation Control Manual or Procedures) 9.

Emergency Plan Implementing Procedures 10.

Technical Specifications 11.

Lesson Plans (Training Manuals, Plant Orientation Manual, System Descriptions, Reactor Theory, Thermodynamics, etc.)

12.

System Operating Procedures 13.

Piping and Instrumentation Diagrams, electrical single line diagrams, or flow diagrams 14.

Technical Data Book, and/or plant curve information as used by operators 15.

Questions and Answers that Licensee has prepared (Voluntary by Licensee)

All of the above reference material should be approved, final issues, and should be so marked.

Uncontrolled, preliminary, or other such issues will not be acceptable except for cold license examinations as approved by the assigned Chief Examiner.

All procedures and reference material should be bound or in tables of contents to enable efficient use.

W

~

g e'

L

(

11

Enclosure 2

Administration of Operator Licensing Written Examinations Examination Requirements:

1.

A single room shall be provided for completing the written examination.

The location of this room and supporting restroom facilities shall be such as to prevent conta'ct with all other facility/contractor personnel during the duration of the written examination.

If necessary, the facility should make arrangements for the use of a suitable room at a local school, motel, or other building.

Obtaining this room is the responsibility of the licensee.

2.

Minimum spacing is required to ensure exam integrity as determined by the chief examiner.

Minimum spacing should be one candidate per table, with 3 foot spacing between tables.

No wall charts,

models, and/or other training materials shall be present.in the examining room.

3.

Suitable arrangements are to be made by the facility.for the candidates to have lunch, coffee, e'tc.

These arrangements will be reviewed by the examiner and/or proctor.

4.

The facility shall arrange to have a maximum of three knowledgeable personnel available to review the examination questions and answer key.

This review will only begin after the start of the written examination and normally be limited to two hours total.

5.

The licensee will provide pads of 8-1/2 x 11" lined paper in unopened packages for each candidate's use in completing the examination.

The examiner will distribute these pads to the candidates.

All reference material needed to complete the examination will be furnished by the examiner.

Candidates can bring pens, pencils, calculators or slide rules into the examination room and no other equipment or reference material is allowed.

6.

Only black ink or dark pencils 'should be used for writing answers to questions.

F I