ML16341A027
| ML16341A027 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 05/25/1984 |
| From: | Bishop T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Schuyler J PACIFIC GAS & ELECTRIC CO. |
| Shared Package | |
| ML16341A028 | List: |
| References | |
| NUDOCS 8406260513 | |
| Download: ML16341A027 (4) | |
Text
(
~4 0
e ~~
')
I O~
+ape+.
Socket No. 50-275 QHnm trAVaS CLEAR REGULATORY COMHllSSlOf~
%450 NAhIALANE,SUITE 210 NALN1JT ChEEK, CALIFOhNIAOlnas NAY 25 1984 Pacific Qs and Electric CosIpany 77 Beale Strert, RoosI l435 San Francisco, California 94)06 httentionI Mr. J. 0. Schuyler, Vice President Nuclear Pover Generation Gentlemen:
Subject:
Evaluation of Shift hdvisor Examinations at the Diablo Canyon Nuclear Power Plant Qn hpril 9 through 11, 1984 and on hpril 24 and 25, 1984, the NRC evaluated the qualification, training, and examination of Shift hdvisor candidates for the Diablo Canyon Nuclear Power Plant, Unit 1.
hs a result of this evaluation the performance of the Training Department of Diablo Canyon vas determined to be adequate to ensure that the Shift hdvisors meet the minimum qualifications recoamended by the industry.
The training program, including quiues and examinations, administered to the Shift hdvisor candidates vas determined to be adequate to assure that the hdvisors had sufficient lmovledge of the Diablo Canyon procedures, technical specifications, and safety related plant systems to adequately perform their duties.
ht the conclusion of the audit on hpril 11 and 25, 1984, the findings vere discussed vith members of your staff as detailed in the enclosed report.
et
NAY 25 l984 Pacific Gas and Electric Coepargr 2
1 t
i Io accordance rith 10 CFR 2.790(a),
a copy of this letter and the. enclosure rillbe placed in the NC's Public Document Room unless you notify'his office by telephone rithin ten days of the date of this letter and submit
'erittin application to rithhold information contained therein rithin thirty 4aya of the Cate of this letter.
Such application aust be consistent rith the tequireaents of 2.M(h)O).
Sincerely, gr.
Division of Reactor Safety and Projects
Enclosures:
1.
Examination Report No. 50-275/OL-84-02 cc r/o enclosure:
Robert Thornberry, Plant Manager Tim Hartin~ grainin~ Manager.........
Ilha,': Qpe~tor ~ceasing Raaaiaer
~n 'Seckham, OLB, HQ Larry Crocker,'QB, HQ J. Buzy, LQB, HQ L. Sender, LQB, HQ R. Pate, RV
gl I
II, P