ML16341A005

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-275/84-20 & 50-323/84-17 on 840514-23.No Noncompliance Noted
ML16341A005
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 06/12/1984
From: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Schuyler J
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16341A006 List:
References
NUDOCS 8406180208
Download: ML16341A005 (4)


See also: IR 05000275/1984020

Text

~

~g% 1CQI

c~

P0

~y

o

I

L

0

/y

0

+

UNITED STATES

NUCLEAR REGULATORY COMMISSlON

REGION V

1L50 MARIALANE,SUITE 210

WALNUTCREEK, CALIFORNIA94596

12 loag

Docket Nos.

0-275 and 50-323

Pacific Gas

and Electric Company

?7 Beale Street,

Room 1435

San Francisco,

California 94106

Attention:

Mr. J. 0. Schuyler,

Vice President

Nuclear Pover Generation

Gentlemen:

Subject:

NRC Inspection of Diablo Canyon Units Nos.

1 and

2

This refers to the special inspection

conducted

by Mr. G. H. Hernandez

of this

office on May 14-23,

1984, of activities authorized

by NRC License

No.

DPR-76

and Construction Permit No. CPPR-69.

Areas

examined during this inspection

are described in the enclosed

inspection

report.

Within these

areas,

the inspection consisted

of selective

examinations of procedures

and representative

records,

interviews vith

personnel,

and observations

by the inspector.

No items of noncompliance with NRC requirements

vere identified vithin the

scope of this inspection.

In accordance vith 10 CFR 2.790(a),

a copy of this letter and the enclosure

will be placed in the

NRC Public Document

Room unless

you notify this office,

by telephone,

within ten days of the date of this letter and submit vritten

application to withhold information contained therein vithin thirty days of

the date of this letter.

Such application must be consistent with the

requirements

of 2.790(b)(1).

Martin Exhibit 16

~t

H

Pacific

Gas

and Electric

gUN gc 1984

Should you have

any questions

concerning this inspection,

ve vill be glad to

discuss

them vith you.

Sincerely,

T.

W. Bishop, Director

Division of Reactor Safety

and Projects

Enclosure:

Inspection Report

Nos. 50-275/84-20

50-323/84Qg

cc w/enclosure:

P.

A. Crane,

PGSZ

W. A. Rayond,

PGGE

S.

M. Skidmore,

PGSZ

R.

C. Thornberry,

PGSZ

cc w/o encl:

Sandra Silver

bcc:

RSB/Document Control Desk

(RIDS)

Distributed by RV:

JBM

State of California

Resident

Inspector

RV

G.Hertfandez:dh

6/(/ /84

P.Jo

son

6//

/84

D.Kir ch

6/I/ /84

T.Bi

op

6/// /84