ML16340D046
| ML16340D046 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 12/22/1982 |
| From: | Eisenhut D Office of Nuclear Reactor Regulation |
| To: | Ahearne J, Gilinsky V, Palladino N NRC COMMISSION (OCM) |
| References | |
| TASK-AS, TASK-BN82-132 BN-82-132, CLI-81-30, NUDOCS 8212280495 | |
| Download: ML16340D046 (8) | |
Text
Docket No.:
50-275 HEtlORANDUtl FOR:
. Chairman Palladino Commissioner Gi linsky Commissioner Ahearne Commissioner Roberts Commissioner Asselstine FROt<:
Darrell G. Eisenhut, Director Division of Licensing Office of nuclear Reactor Regulation
SUBJECT:
INFORMATION ITEMS REGARDING THE DESIGN VERIFICATION PROGRNI - PHASE I FOR DIABLO CANYON, UNIT 1 (Board Notification No.82-132)
In accordance with present NRC procedures for Board Notifications, the following items are enclosed for information of the Commission.
<2.
v3 R. F.
Reedy Inc., Semi-monthly Report (Open Items), dated December 10, 1982.
Teledyne Engine'ering Services, Semi-monthly Report, dated December 10, 1982.
I Stone 8 Webster Engineering Cooperation, IDVP Interim Technical Report 14 - Verification of the Pressure, Temperature, Humidity and submergence Environments Used for Safety Related Equipment Specification Outside Containment for Auxiliary Feedwater System and Control Room Ventilation and Pressurization
- System, dated December G, 1982.
d4 ~
R. L. Cloud Associates, IDVP Interim Technical Peport 15 -
HVAC Ducts and Supports Report, letter dated December 13, 1982.
R. L. Cloud Associates, IDVP Interim Technical Report 16 Soils-Outdoor Water Storaqe Tanks, letter dated December 8, 1982.
R. L. Cloud Associates, IDVP Interim Technical Report 17 Piping-Additional Samples, letter dated December 15, 1982.
Contact:
tfans Schier ling, ONRR X27238 82i2280495 82i222 PDR ADOCK 05000275 sUAQ P
PDR DATAP o ~ ~ ~ ~ ooo ~ oo ~ oo ~ ~ o ~ o ~ ~ ~ ~ ~
~ ~ ~
~
~
~ ~ ~ ~ ~
NRC FORM 318 (10-80) NRCM 0240
~ ~ ~ ~ ~ o ~ o ~ ~ ~ ~ ~ ~ ~ ~ o
~ ~ o ~ ~ ~ ~ ~ o ~ ~ o ~ o ~ ~ ~ ~
OFFIClAL RECORD COPY
~ oooo oooooooooooooooooot U$QPO'N1~960
'I
~
l ~
w '"
v t
"t'
~ $ 'I ~
'. tt-
The Commission The enclosures provide information on the status of activities performed under the Independent Design Verification Program (IDVP) for Diablo Canyon Unit 1 by the participating organizations and under the Internal Technical Program
( ITP) by PGflE.
The information is relevant to the safety issue on the design adequacy of Diablo Canyon Unit 1.
This is the subject of Commission Order CLI-81-30 which is the basis for the IDVP.
0 The material does not pertain to those matters that were resolved by ALAB 644'riginalsigned by Darrell G. Zisenhut Darrell G. Eisenhut, Director Division of Licensing Office of nuclear Reactor Regulation
Enclosures:
As stated cc w/encls:
ASLBP ASLAP SECY OGC OPE Board Service List D'istribution:
See attached'heet
- See previous page for concurrence/initials OFFICE/
SURNAMEII DATEP LOAJOPSPlo 0000 ~ 00000 ~
0 ~ 000000
~ 0000000000 000 ch ierl i ng : p GKnig hton DL:AD:L
~ ~ 0
~
~ 0 ~ 0 ~ ~ 00 ~ 0 ~ 0 ~ ~ ~ ~ 0 ~
"TNovak 12/
15 /82 12/15
/82 12/16
/82
~ 0 ~ 00000 ~ 00000 ~ ~ ~ ~ 00 ~ 0 ~ 0
~ 0 ~ 00000 ~ 0 ~ 0 ~ 0 ~ 00 ~ ~ 0 ~ 0 ~ ~
~ 0 ~ 0 ~
~ ~ 0 ~ 00 ~ 00 ~ 00 ~ 0 ~ ~ ~ ~
DL:
~
~ ~ ~ ~
D
/82 NRG FORM 318 (10-80) NRCM 0240 OFFICIAL R CORD 0COPY USQPO: 1991-SÃr990
4 J/
The Commission The material does not pertain to those matters that M
e resolved by ALAB 644.
Enclosures:
As stated Darrelg G. Eisenhut, Director Divipfon of Licensing Off Ce of Nuclear Reactor Regulation cc w/encls:
ASLBP ASLAP SECY OGC OPE Board Service List Distribution:
See attached sheet OFFICE/
SURNAME)
DATE Q
'.'Ph 12/ l5
/82 DL
~ ~ 0 ~ 0
~ ~ ~ ~ ~
~
chi erl in DL DLb3
~
~
~
0
~
~ \\ F 0
~
~ ~ 0 GKnighton T
vak
~ ~ ~ ~ ~ 0 ~ 0 ~
~ lyAOOOO ~ ~ 0 ~
~ ~ ~ 0 ~
~ OS 0 F 00000 aors 12/ ($ /82 12/j
/82 DL:n1R
~
~
~ ~ ~ 0 ~ ~ ~ 0
~ ~ ~ 0 ~
~
0 ~ ~ ~ ~ 0 ~ 00 ~ 0 ~ 0 ~ ~ 0 ~ 0 ~ ~ ~ ~
Dfisenhut 12/
/82
~ 0 ~ 0 ~ 0 ~ ~ ~ ~ 0 ~ ~ ~ 0 ~ ~ \\0 ~ 0 ~ 0 ~
~ 0 ~ ~ ~ ~ ~ ~ ~ 0000000 ~ 000000 ~
NRC FORM 318 (10~) NRCM 0240 OFFlCIAL RECORD COPY USG 100: 1981~960
0 O.
BOARD NOTIFICATION BN-P-rX
- >i/encl o sure
~Document-Control (50<75)~~
PDRx'>>
A>c1'"
L PDR*
TERA*
NSIC*
LB83 Reading G. Knighton Project tlanager*
J.
Lee T. tl. Novak I'1. Stine D. Eisenhut/R.
Purple l1. llilliams H. Denton/E.
Case*
PPAS J.
Youngblood A. Schwencer F.
Adensam C.
Thomas R. Vollmer H. Thompson R. tlattson S.
Hanauer
- Attorney, OELD*
- f. L. Jordon J.
N. Taylor Regional Adminstrator Resident Inspector M. J. Dircks, EDO (3)
E. Christenbury, OELD J. Scinto, OELD A.'ennette*
( 1)
S.
Black cc:
Board Service List I
Document management Branc II 016 Phil 1 ips
0